Loading...
Duke Lesley 2A-LR070913 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pk ,Ste 1000 Dallas, T 54- 6 Project: 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test ~ }-11 Report No.: 295534 Of Z II ,... Project No.: 0712932 /J A ~te of Service: 08/14/2007 V /Report Date: 09/13/2007 c s, perform required testing, cast compressive strength samples and bring sting In accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" - 7" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 .S"! M C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 7751 PW Placement Date: 08/14/2007 Weather Conditions: Clear Time Sampled: 12:15pm Temperature - Air: 1000F Truck No: 104 Air Content: NA Overall Placement Location: Drilled piers B/2, C/2, 0/2, E/2, F/2, G/2, K/3, H/2, J/2, K/2 Measured Slump (inches) 6.0 Batch time: 11:41 am Concrete: 960F Ticket No: 13053 Unit Weight (pcf): NA Sample Location: Grid lines AJ1, H/2, G/2 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 08/21/2007 7 6.00 28.27 73,650 2,600 Unbonded Cap 1 2 09/11/2007 28 6.00 28.27 101,630 3,590 Cone/Split 1 3 09/11/2007 28 6.00 28.27 105,190 3,720 Cone/Split Average 3,660 4 10/09/2007 56 Technician: Alejandro Avendano Rone Engineering See Report 295533 for technician time~~ Report Distribution: 0';9' ?,":~ ;;,~~~t'"cl;O". LP (0,,,,,. TX) Att"' M,. P,"' Bym, . . .... ..' 1-cc Potter Concrete Attn: Mr. Ryan Skelly K. Scott Watson, AET 1-cc City of Coppell Alln: Mr. Lee Stone. Pro'eet Manager 1-cc City of Coppell Alln: Mr. Larry DaVIS J ~ LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 1 of 1