Loading...
Duke Lesley 2A-LR070912 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 296866 Project No.: 0712932 Date of Service: 08/25/2007 Report Date: 09/12/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Straight Shaft Pier Inspection D rille r: A ug e r Pie rid e ntifica tio n B /10 B.9/0.9' B /9 PierDiameter(in) 24 30 24 D e p th 0 f Pie r F ro m Surface (ft) 42.50 43.60 43.00 Depth of Bear in a Stratum Fro m Surface (ft) 36.50 36.50 37.20 R e qui re d P e netra tio n (ft) 5.00 5.00 5.00 A ctua I P e ne tra tio n (ft)' 6.00 7.10 5.80 Condition of Bottom (wet/dry) Dry Dry Dry Plumb Within Tolerance (ves /no) Yes Yes Yes Casing Diameter(in)/Casina Lenath (ft) 26/36.5 3 2 /3 5 .8 26/36.5 N u m b e r 0 f Bars IRe info rei n 9 BarSize 6 / #6 8 1#6 6 / # 6 Lenath of Reinforcing S te e I (ft) 41.30 42.40 -.l~l11e Dl.:l!!.!1lt!:'_~.~_.:fy HI P ~le d (~:! pm L-_____ 10:31 AM 11.30AM - +;~:P-M-: - -:---~~~~ -_._----- Tim e Con c re te was P la c e d (am I pm) 12:15 PM 1 :30 PM D e p th 0 f Pie r Fro m Top of Concrete (ft) 42.00 43.10 42.50 Elevation: Surface (ft)** 98.50 98.50 98.50 Elevation: Top of Pier (ft)** 98.00 98.00 98.00 Elevation: Bottom of Pie r (ft)** 56.00 54.90 55.50 Elevation: Top of Bear in a Stratum (ft. ) ** 62.00 62.00 61 .30 Bearing Stratum (descriotion) Blue shale Note: See report # 296867 for Com pressive Strength Test Specim ens. . Additional Penetration not requested unless noted HE levation by others Remarks: * Pier B.9/0.9 drilled but not placed; steel was 30" in diameter; needs to be 24". Technician: Chris Harbour Started: 05:45am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Alln: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Alln: Mr. Lee Stone 1-cc City of Coppell Alln: Mr. Larry Davis Finished: 04:15pm Rone Engineering p~.~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. ~H~~ P~e2~2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 296866 Project No.: 0712932 Date of Service: 08/25/2007 Report Date: 09/12/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Straight Shaft Pier Inspection Report of Inspection D ri lie r: A uq e r Pie r Id e ntifica tio n G /10 F 11 0 E 110 D /1 0 C /1 0 Pier Diameter (in) 24 24 24 24 24 Depth of Pier From Surface(ft) 42.40 43.30 42.50 41.60 42.30 Depth ofBearinq Stratum From Surface(ft) 36.80 36.30 36.00 36.00 36.50 Required Penetration (ft) 5.00 5.00 5.00 5.00 5.00 Actual Penetration (ft)' 5.60 7.00 6.50 5.60 5.80 Condition of Bottom (wet/dry) Dry Dry Dry D rv Dry Plumb Within Tolerance (ves /no) Yes Yes Yes Yes Yes CasinQ Diameter(in)/CasinQ LenQth (ft) 26/36.8 26/36.1 26 /3 6 26/36 26/36 :NUT11b~I-:-I'L..lars: Reilllu/L;llg Bar Size 6 1#6 6 ! #6 & iii-a G 1 #6 C ;-#6 Length of Reinforcina Steel (ft) 41.20 42.20 41.40 40.60 41.20 Time Drillina was Completed (am Ipm) 7:50 AM 8:20 AM 8:40 AM 9 :09 AM 9:55 AM Time Concrete was Placed (am /pm) 9 :4 9 AM 9:20 AM 10:30AM 1 1 :00 AM 11:38AM Depth of Pier From Top of Concrete (ft) 41.90 42.80 42.00 41 .1 0 41.80 Elevation: Surface (ft)** 98.50 98.50 98.50 98.50 98.50 Elevation:Top of Pier (ft)** 98.00 98.00 98.00 98.00 98.00 E Ie va tio n: B 0 Ito m of Pier (ft)** 56.10 55.20 56.00 56.90 56.20 Elevation: Top of Bearina Stratum (ft.) ** 61.70 62.20 62.50 62.50 62.00 BearinQ Stratum (d e scriptio n) Blue shale Note: See repo rt # 296867 for Com pressive S tre ng th Test S pecim ens. 'Additional Penetration not requested unless noted. **Elevation by others LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/JB) Page 1 of 2