Loading...
Duke Lesley 2A-LR070911 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 297228 Project No.: 0712932 Date of Service: 08/29/2007 Report Date: 09/11/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): NA Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10,1.2) ASTM C-143 f\ ~TM ( 231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7751 PW Placement Date: 08/29/2007 Weather Conditions: Partly cloudy Time Sampled: 01 :OOpm Batch time: 12:23pm Temperature - Air: 1010F Concrete: 940F Truck No: 108 Ticket No: 13241 Air Content: NA Unit Weight (pct): NA Overall Placement Location: Piers (see report #297227) Measured Slump (inches) 5.5 Sample Location: Pier U14 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 09/05/2007 7 6.00 28.27 99,560 3,520 Cone/Split 1 2 09/05/2007 7 6.00 28.27 95,030 3,360 Cone/Split Average 3,440 1 3 09/26/2007 28 1 4 09/26/2007 28 1 5 10/24/2007 56 Remarks: Water added at site: 10 gallons Technician: Chris Harbour Rone Engineering See Report 297227 for technician timep ~ Report Distribution: ~ ~ -------... Orig: ~~~~ ;Oopny~truction, LP (Dallas, TX) Attn: Mr. Paul Byrne .' . .~/' ..... . . ~ 1-cc Potter Concrete AUn: Mr. Ryan Skelly K Scott Watson AET 1-cc City of Coppell AUn: Mr. Lee Stone . ' Pro' ect Mana' er 1-cc City of Coppell Attn: Mr. Larry DaVIS J 9 LIMITATIONS The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/LB) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 297382 Project No.: 0712932 Date of Service: 08/30/2007 Report Date: 09/11/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): NA Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 AS11'Jl ,',-)3'] __ ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7751 PW Placement Date: 08/30/2007 Weather Conditions: Light clouds Time Sampled: 11 :55am Batch time: 11 :39am Temperature - Air: 870F Concrete: 910F Truck No: 138 Ticket No: 13260 Air Content: NA Unit Weight (pet): NA Overall Placement Location: Piers (see report #297381) Measured Slump (inches) 7.0 Sample Location: Pier 1/16 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 1 1 09/06/2007 7 6.00 28.27 89,440 3,160 Cone/Split 1 2 09/06/2007 7 6.00 28.27 92,000 3,250 Cone/Split Average 3,210 3 09/27/2007 28 4 09/27/2007 28 5 10/25/2007 56 Technician: Chris Harbour Rone Engineering See Report 297381 for technician timep ~ Report Distribution: ~-----... 0',1' ~~ ;;:';,;'''''';00, LP (D,""" TX) All", M'. P,"' B,me .' . .. ~ - .. =--" 1-cc Potter Concrete Attn: Mr. Ryan Skelly K. Scott Watson AET 1-cc City of Coppell Attn: Mr. Lee Stone p . ct M ' 1-cc City of Coppell Attn: Mr. Larry Davis roJe anager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/LB) Page 1 of 1