Loading...
Duke Lesley 2A-LR070905 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 297760 Project No.: 0712932 Date of Service: 09/04/2007 Report Date: 09/05/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Req u irements Strength: 3,000 psi @ 28 days Slump (in.): 5" - 7" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 A-8TM C )3 j ASTM C-1064 ASTM C-138 ASTM C-39 Batch time: 08:55am Concrete: 840F Ticket No: 13287 Unit Weight (pcf): NA Measured Slump (inches) 7.0 Mix Design I.D.: 7751 PW Placement Date: 09/04/2007 Weather Conditions: Light rain Time Sampled: 09:20am Temperature - Air: 790F Truck No: 138 Air Content: NA Overall Placement Location: 3 Pier caps J.210.9/1.1, K.9-L.1/1.95-2, K.9-L.1/3, building piers B/16-21, C/17-21, 1/17, 18, J/17-19 Sample Location: Building pier B16 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 1 1 09/11/2007 7 6.00 28.27 94,510 3,340 Shear 1 2 09/11/2007 7 6.00 28.27 93,400 3,300 Shear Average 3,320 3 10/02/2007 28 4 10/02/;;'007 28 5 10/30/2007 56 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 1 of 2 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 297760 Project No.: 0712932 Date of Service: 09/04/2007 Report Date: 09/05/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" - 7" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 p'3TI\I~ (:-231 ASTM C-1064 ASTM C-138 ASTM C-39 Batch time: 02:23pm Concrete: 930F Ticket No: 7320 Unit Weight (pcf): NA Measured Slump (inches) 6.5 Mix Design I.D.: 7751 PW Placement Date: 09/04/2007 Weather Conditions: Light rain Time Sampled: 03:10pm Temperature - Air: 890F Truck No: 104 Air Content: NA Overall Placement Location: 3 Pier caps J.2/0.9/1.1, K.9-L.1/1.95-2, K.9-L.1/3, building piers B/16-21, C/17-21, 1/17, 18, J/17-19 Sample Location: Building pier 1/17 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 2 1 09/11/2007 7 6.00 28.27 112,330 3,970 Shear 2 2 09/11/2007 7 6.00 28.27 104,390 3,690 Cone/Split Average 3,830 2 3 10/02/2007 28 2 4 10/02/2007 28 2 5 10/30/2007 56 Technician: Chris Harbour Rone Engineering See Report 297759 for technician time~ ~ Report Distribution: . . .~ Orig: ~~~~ ~oop~~truction, LP (Dallas, TX) Attn: Mr. Paul Byrne . . . . ... . . . 1-cc Potter Concrete Attn: Mr. Ryan Skelly K. Scott Watson, AET 1-cc City of Coppell Attn: Mr. Lee Stone. Project Manager 1-cc City of Coppell Attn: Mr. Larry DaVIS ~ LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 2 of 2