Gateway BP(3.1)-LR070911
Rone Engineering
.
Client:
Transwestern Commercial Services
5001 Spring Valley
Dallas, TX 75244
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295188
Project No.: 0712786
Date of Service: 08/10/2007
Report Date: 09/11/2007
Project: Gateway Business Center
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Constructors & Associates
Concrete Supplier: Redi Mix
Plant: 136
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 23601524
Placement Date: 08/10/2007
Weather Conditions: Clear
Time Sampled: 02:40am
Temperature - Air: 770F
Truck No: 1371
Air Content: 5.0%
Overall Placement Location:
Pour G west of building 1
Batch time: 01 :55am
Concrete: 840F
Ticket No: 13693699
Unit Weight (pcf): NA
Measured
Slump
(inches)
5.5
Sample Location:
20' north, 10' east from southwest corner of paving
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
1 1 08/17/2007 7 6.00 28.27 103,360 3,660 Unbonded Cap
2 09/07/2007 28 6.00 28.27 123,310 4,360 Shear
3 09/07/2007 28 6.00 28.27 120,690 4,270 Cone/Split
Average 4,310
4 10/05/2007 56
Remarks: Water added at site: 5 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/LB) Page 1 of 5
Rone Engineering
..
Client:
Transwestern Commercial Services
5001 Spring Valley
Dallas, TX 75244
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295188
Project No.: 0712786
Date of Service: 08/10/2007
Report Date: 09/11/2007
Project: Gateway Business Center
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Constructors & Associates
Concrete Supplier: Redi Mix
Plant: 136
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1 064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 23601524
Placement Date: 08/10/2007
Weather Conditions: Clear
Time Sampled: 03:15am
Temperature - Air: 770F
Truck No: 1038
Air Content: 4.8%
Overall Placement Location:
Pour G west of building 1
Batch time: 02:34am
Concrete: 840F
Ticket No: 13693708
Unit Weight (pcf): NA
Measured
Slump
(inches)
5.5
Sample Location:
60' north, 5' west from southeast corner of paving
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
2 1 08/17/2007 7 6.00 28.27 102,100 3,610 Unbonded Cap
2 2 09/07/2007 28 6.00 28.27 121,870 4,310 Cone/Shear
2 3 09/07/2007 28 6.00 28.27 125,980 4,460 Cone/Split
Average 4,380
2 4 10/05/2007 56
Remarks: Water added at site: 5 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/LB) Page 2 of 5
Rone Engineering
.
Client:
Transwestern Commercial Services
5001 Spring Valley
Dallas, TX 75244
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295188
Project No.: 0712786
Date of Service: 08/10/2007
Report Date: 09/11/2007
Project: Gateway Business Center
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Constructors & Associates
Concrete Supplier: Redi Mix
Plant: 136
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1 064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 23601524
Placement Date: 08/10/2007
Weather Conditions: Clear
Time Sampled: 05:40am
Temperature - Air: 750F
Truck No: 1364
Air Content: 5.0%
Overall Placement Location:
Pour G west of building 1
Batch time: 05:25am
Concrete: 830F
Ticket No: 13693736
Unit Weight (pcf): NA
Measured
Slump
(inches)
5.0
Sample Location:
150' north, 10' west from southeast of paving
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
3 1 08/17/2007 7 6.00 28.27 79,840 2,820 Unbonded Cap
3 2 09/07/2007 28 6.00 28.27 107,140 3,790 Cone/Split
3 3 09/07/2007 28 6.00 28.27 102,650 3,630 Shear
Average 3,710
3 4 10/05/2007 56
Remarks: Water added at site: 5 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CHILB) Page 3 of 5
Rone Engineering
.
Client:
Transwestern Commercial Services
5001 Spring Valley
Dallas, TX 75244
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295188
Project No.: 0712786
Date of Service: 08/10/2007
Report Date: 09/11/2007
Project: Gateway Business Center
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Constructors & Associates
Concrete Supplier: Redi Mix
Plant: 136
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 23601524
Placement Date: 08/10/2007
Weather Conditions: Clear
Time Sampled: 08:00am
Temperature - Air: nOF
Truck No: 1015
Air Content: 5.0%
Overall Placement Location:
Pour G west of building 1
Batch time: 07:14am
Concrete: 820F
Ticket No: 13693759
Unit Weight (pcf): NA
Measured
Slump
(inches)
5.0
Sample Location:
10' east, 5' north from southwest corner of paving
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
4 1 08/17/2007 7 6.00 28.27 79,350 2,810 Unbonded Cap
4 2 09/07/2007 28 6.00 28.27 109,520 3,870 Cone/Shear
4 3 09/07/2007 28 6.00 28.27 110,890 3,920 Cone/Shear
Average 3,900
4 4 10/05/2007 56
Remarks: Water added at site: 5 gallons
LIMITATIONS The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CHfLB) Page 4 of 5
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Transwestern Commercial Services
5001 Spring Valley
Dallas, TX 75244
Report of Concrete Compressive Strength Test
Report No.: 295188
Project No.: 0712786
Date of Service: 08/10/2007
Report Date: 09/11/2007
Project: Gateway Business Center
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Report Distribution:
Orig: Transwestern Commercial Services (Dallas, TX)
Attn: Mr. Ric Nelson (1-cc copy)
1-ec Constructors & Associates Attn: Mr. Frank Castro
1-cc City of Coppell Attn: Mr. Larry Davis
1-ec Mike Delvin AUn: Mr. Mike Delvin
1-cc Murray Construction Co., Inc. Attn: Mr. Terence Babler
1-cc City of Coppell Attn: Mr. Lee Stone
1-ec AECC, Inc. Attn: Mr. Brant Ince
1-ec Delaware I nvestment Advisers
Attn: Mr. Keith Schinnerer PE
1-cc Aztec Environmental Attn: Mr. Mike Sexton
Technician: Jimmy Hall
Started: 12:45am
Finished: 09:00am
Rone Engineering
p-~..~
K. Scott Watson, AET
Project Manager
LIMITATIONS The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CHILB) Page 5 of 5
Rone Engineering
.
Client:
Transwestern Commercial Services
5001 Spring Valley
Dallas, TX 75244
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295017
Project No.: 0712786
Date of Service: 08/09/2007
Report Date: 09/11/2007
Project: Gateway Business Center
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Constructors & Associates
Concrete Supplier: Redi Mix
Plant: 259
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1 064
ASTM C-138
ASTM C-39
Mix Design I.D.: 336K15D4
Placement Date: 08/09/2007
Weather Conditions: Clear
Time Sampled: 02:30am
Temperature - Air: 780F
Truck No: 1347
Air Content: 5.5%
Overall Placement Location:
Paving on northwest corner of building 1, pour 2
Measured
Slump
(inches)
5.0
Batch time: 01 :29am
Concrete: 870F
Ticket No: 59011424
Unit Weight (pcf): NA
Sample Location:
140' west, 200' south from northwest corner of building 1
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 08/16/2007 7 6.00 28.27 91,990 3,250 Unbonded Cap
1 2 09/06/2007 28 6.00 28.27 122,000 4,310 Cone/Split
1 3 09/06/2007 28 6.00 28.27 120,770 4,270 Cone/Split
Average 4,290
4 10/04/2007 56
LlMITA TIONS The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KWILB) Page 1 of 7
Rone Engineering
.
Client:
Transwestern Commercial Services
5001 Spring Valley
Dallas, TX 75244
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295017
Project No.: 0712786
Date of Service: 08/09/2007
Report Date: 09/11/2007
Project: Gateway Business Center
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Constructors & Associates
Concrete Supplier: Redi Mix
Plant: 259
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design I.D.: 336K15D4
Placement Date: 08/09/2007
Weather Conditions: Clear
Time Sampled: 03:50am
Temperature - Air: 790F
Truck No: 1347
Air Content: 5.3%
Overall Placement Location:
Paving on northwest corner of building 1, pour 2
Measured
Slump
(inches)
5.0
Batch time: 03:12am
Concrete: 860F
Ticket No: 59011435
Unit Weight (pcf): NA
Sample Location:
250' west, 150' south from northwest corner of building 1
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
2 1 08/16/2007 7 6.00 28.27 80,350 2,840 Unbonded Cap
2 2 09/06/2007 28 6.00 28.27 117,720 4,160 Cone/Split
2 3 09/06/2007 28 6.00 28.27 117,780 4,170 Cone/Split
Average 4,160
2 4 10/04/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/LB) Page 2 of 7
Rone Engineering
.
Client:
Transwestern Commercial Services
5001 Spring Valley
Dallas, TX 75244
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295017
Project No.: 0712786
Date of Service: 08/09/2007
Report Date: 09/11/2007
Project: Gateway Business Center
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Constructors & Associates
Concrete Supplier: Redi Mix
Plant: 259
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1 064
ASTM C-138
ASTM C-39
Mix Design I.D.: 336K15D4
Placement Date: 08/09/2007
Weather Conditions: Clear
Time Sampled: 05:21am
Temperature - Air: 790F
Truck No: 1307
Air Content: 5.1 %
Overall Placement Location:
Paving on northwest corner of building 1, pour 2
Meas u red
Slump
(inches)
5.0
Batch time: 04:37am
Concrete: 860F
Ticket No: 59011445
Unit Weight (pcf): NA
Sample Location:
190' west, 110' south from northwest corner of building 1
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
3 1 08/16/2007 7 6.00 28.27 101,710 3,600 Unbonded Cap
3 2 09/06/2007 28 6.00 28.27 133,420 4,720 Cone/Split
3 3 09/06/2007 28 6.00 28.27 134,250 4,750 Cone/Split
Average 4,730
3 4 10/04/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KWILB) Page 3 of 7
Rone Engineering
.
Client:
Transwestern Commercial Services
5001 Spring Valley
Dallas, TX 75244
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295017
Project No.: 0712786
Date of Service: 08/09/2007
Report Date: 09/11/2007
Project: Gateway Business Center
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Constructors & Associates
Concrete Supplier: Redi Mix
Plant: 259
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design I.D.: 336K15D4
Placement Date: 08/09/2007
Weather Conditions: Clear
Time Sampled: 07:10am
Temperature - Air: 820F
Truck No: 1345
Air Content: 5.3%
Overall Placement Location:
Paving on northwest corner of building 1, pour 2
Measured
Slump
(inches)
5.0
Batch time: 06:49am
Concrete: 860F
Ticket No: 59011461
Unit Weight (pcf): NA
Sample Location:
120' west, 85' south from northwest corner of building 1
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
4 1 08/16/2007 7 6.00 28.27 86,380 3,060 Unbonded Cap
4 2 09/06/2007 28 6.00 28.27 116,900 4,130 Cone/Split
4 3 09/06/2007 28 6.00 28.27 121 , 1 90 4,290 Cone/Split
Average 4,210
4 4 10/04/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/LB) Page 4 of 7
Rone Engineering
.
Client:
Transwestern Commercial Services
5001 Spring Valley
Dallas, TX 75244
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214)630-9745
Report of Concrete Compressive Strength Test
Report No.: 295017
Project No.: 0712786
Date of Service: 08/09/2007
Report Date: 09/11/2007
Project: Gateway Business Center
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Constructors & Associates
Concrete Supplier: Redi Mix
Plant: 259
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1 064
ASTM C-138
ASTM C-39
Mix Design I.D.: 336K15D4
Placement Date: 08/09/2007
Weather Conditions: Clear
Time Sampled: 09:20am
Temperature - Air: 850F
Truck No: 1375
Air Content: 5.4%
Overall Placement Location:
Paving on northwest corner of building 1, pour 2
Measured
Slump
(inches)
5.5
Batch time: 08:28am
Concrete: 870F
Ticket No: 59011482
Unit Weight (pcf): NA
Sample Location:
40' west, 125' south from northwest corner of building 1
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
5 1 08/16/2007 7 6.00 28.27 80,460 2,850 Unbonded Cap
5 2 09/06/2007 28 6.00 28.27 119,580 4,230 Cone/Shear
5 3 09/06/2007 28 6.00 28.27 124,540 4,400 Shear
Average 4,320
5 4 10/04/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/LB) Page 5 of 7
Rone Engineering
.
Client:
Transwestern Commercial Services
5001 Spring Valley
Dallas, TX 75244
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295017
Project No.: 0712786
Date of Service: 08/09/2007
Report Date: 09/11/2007
Project: Gateway Business Center
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Constructors & Associates
Concrete Supplier: Redi Mix
Plant: 259
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design 1.0.: 336K15D4
Placement Date: 08/09/2007
Weather Conditions: Clear
Time Sampled: 10:50am
Temperature - Air: 900F
Truck No: 1257
Air Content: 5.1 %
Overall Placement location:
Paving on northwest corner of building 1, pour 2
Measured
Slump
(inches)
5.0
Batch time: 09:45am
Concrete: 920F
Ticket No: 59011494
Unit Weight (pcf): NA
Sample location:
70' west, 50' south from northwest corner of building 1
REPORT OF TESTS
Concrete Compressive Cylinder 5" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
6 1 08/16/2007 7 6.00 28.27 81,800 2,890 Unbonded Cap
6 2 09/06/2007 28 6.00 28.27 120,620 4,270 Cone/Split
6 3 09/06/2007 28 6.00 28.27 116,720 4,130 Cone/Split
Average 4,200
6 4 10/04/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar sUbject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/LB) Page 6 of 7
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Transwestern Commercial Services
5001 Spring Valley
Dallas, TX 75244
Report of Concrete Compressive Strength Test
Report No.: 295017
Project No.: 0712786
Date of Service: 08/09/2007
Report Date: 09/11/2007
Project: Gateway Business Center
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Report Distribution:
Orig: Transwestern Cornmercial Services (Dallas, TX)
Attn: Mr. Ric Nelson (1-cc copy)
1-ec Constructors & Associates Attn: Mr. Frank Castro
1-cc City of Coppell Attn: Mr. Larry Davis
1-ec Mike Delvin Attn: Mr. Mike Delvin
1-cc Murray Construction Co., Inc. Attn: Mr. Terence Babler
1-cc City of Coppell Attn: Mr. Lee Stone
1-ec AECC, Inc. Attn: Mr. Brant Ince
1-ec Delaware Investment Advisers
Attn: Mr. Keith Schinnerer PE
1-cc Aztec Environmental Attn: Mr. Mike Sexton
Technician: Danny Howard
Started: 01 :OOam Finished: 01 :OOpm Rone Engineering
~~.~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and neports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KWILB) Page 7 of?
Rone Engineering
..
Client:
Transwestern Commercial Services
5001 Spring Valley
Dallas, TX 75244
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295447
Project No.: 0712786
Date of Service: 08/13/2007
Report Date: 09/11/2007
Project: Gateway Business Center
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Constructors & Associates
Concrete Supplier: Redi Mix
Plant: 136
Specification Requirements
Strength: 3,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1 064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 830J1521
Placement Date: 08/13/2007
Weather Conditions: Clear
Time Sampled: 03:40pm
Temperature- Air: 1040F
Truck No: 1198
Air Content: NA
Overall Placement Location:
Grade beam, building 1, 7.5/E -10/E
Batch time: 03:19pm
Concrete: 1000F
Ticket No: 13693926
Unit Weight (pcf): NA
Measured
Slump
(inches)
5.0
Sample Location:
Same as above
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 08/20/2007 7 6.00 28.27 79,940 2,830 Unbonded Cap
2 09/10/2007 28 6.00 28.27 100,310 3,550 Cone/Shear
3 09/10/2007 28 6.00 28.27 102,510 3,630 Cone/Shear
Average 3,590
4 10108/2007 56
Remarks: Water added at site: 5 gallons
LIMITATIONS: The test results presented herein were prepared based upDn the specific samples prDvided fDr testing. We assume nD responsibility fDr variation in quality
(compDsition, appearance, etc.) Dr any Dther feature Df similar subject matter prDvided by persDns Dr cDnditiDns Dver which we have nD contrDI. Our letters and repDrts are
fDr the exclusive use Df the clients tD whDm they are addressed and shall nDt be reprDduced except in full withDut the written apprDval Df RDne Engineering Services, Ltd.
(KW/LB) Page 1 of 2
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Transwestern Commercial Services
5001 Spring Valley
Dallas, TX 75244
Report of Concrete Compressive Strength Test
Report No.: 295447
Project No.: 0712786
Date of Service: 08/13/2007
Report Date: 09/11/2007
Project: Gateway Business Center
Cappell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standar.ds.
Report Distribution:
Orig: Transwestern Commercial Services (Dallas, TX)
AUn: Mr. Ric Nelson (1-cc copy)
1-ec Constructors & Associates AUn: Mr. Frank Castro
1-cc City of Coppell AUn: Mr. Larry Davis
1-ec Mike Delvin AUn: Mr. Mike Delvin
1-cc Murray Construction Co., Inc. Attn: Mr. Terence Babler
1-cc City of Coppell AUn: Mr. Lee Stone
1-ec AECC, Inc. AUn: Mr. Brant Ince
1-ec Delaware Investment Advisers
Attn: Mr. Keith Schinnerer PE
1-cc Aztec Environmental AUn: Mr. Mike Sexton
Technician: Tommy Chapa
Started: 02:00pm Finished: 05:15pm Rone Engineering
V~..~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/LB) Page 2 of 2