Loading...
Gateway BP(3.2)-CS070830 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Gatewav Business Park. lot 3C-R. Block 2. Site Plan, to allow the development of one office warehouse building, containing 151,825 square-feet on 8.8 acres of property, located on the northeast corner of Gateway Boulevard and Exchange Circle, at the request of Prologis, being represented by David Meinhardt, Meinhardt and Associates Architects, P.L.L.C. STAFF REP.: Marcie Diamond PROJECT 10# SPA-OJ-OOJO DRC DATE: August 30,2007 and September 6,2007 CONTACT: Kenneth M. Griffin, P.E., Dir.of En1{ineerinf{IPublic Works 972/304-3686 COMMENT STATUS: '/PRELIMINARY FIN.L1L REl'1SED .LJt~rTER P&Z 1. There is an existing inlet in the intersection of the proposed 50' private access and Gateway Blvd. that will need to be relocated. The drainage will be evaluated further during engineering plan review. 2. Show the domestic water service to the building. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: being a replat of Lot Gateway Business Park, Lot 3C-R, Block 2, Replat, 3C, Block 2, of the Gateway Business Park, to establish fire lanes and easements to allow for the development of one office warehouse building on 8.8 acres of property, located on the northeast corner of Gateway Boulevard and Exchange Circle, at the request of Prologis, being represented by Ben Stephens, Halff Associates, Inc. STAFF REP.: Marcie Diamond PROJECT ID# RP-07-0071 DRC DATE: August 30, 2007 and September 6, 2007 CONTACT: Kenneth M. Griffin, P.E., Dir.of Engineering/Public Works 972/304-3686 COMMENT STATUS: PRELIMINARY FINAL REVISED  AFTER P&Z No comments.