DR9001-CS 910220Mr. Phil Cullum
Cullum Construction Co.
P.O. Box 8455
Dallas, Texas 75205
Re: Woodside Village (Connell Skaggs Addition)
Drainage Improvements
Dear Phil:
During site visits to observe the construction of the referenced box culvert, it has come to
my attention that groundwater exists in the excavation area, to depths higher than
previously thought by this office. Due to this groundwater depth, we are requesting that
weepholes be installed in the sides of the box to assist in relieving groundwater pressures
that may exist upon completion of the box culvert. The weepholes to be installed shall be
as outlined on the attached detail.
If you have any questions regarding this matter, please do not hesitate to call me.
Sincerely,
/ ~/Iames A. Koch, Jr., P.E.
JAK/thj
1004-34
CC::
Mr. Mark Connell, Connell Dev. Co., w/enc.
Mr. Danny Buckelew, Buckelew Const. Co., w/enc.
Mr. Larry Davis, City of Coppell, w/eno.
9401 LBJ Freeway · Suite 250 · Dallas, Texas 75243 · (214) 669-1600
PACHECO KOCH
CONSULTING ENGINEERS, INC.
9401 LB.J Freeway Suite 250
DALLAS, TEXAS 75243
SCALE