Loading...
Duke Lesley-LR070927 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 296643 Project No.: 0612510 Date of Service: 08/23/2007 Report Date: 09/27/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: LMC Plant: 3 Specification Requirements Strength: 4,200 psi @ 28 days Slump (in.): 3" - 5" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Batch time: 03:20pm Concrete: 920F Ticket No: 3235714 Unit Weight (pet): NA Measured Slump (inches) 4.0 Mix Design 1.0.: 1701 Placement Date: 08/23/2007 Weather Conditions: Clear Time Sampled: 04:15pm Temperature - Air: 850F Truck No: 5023 Air Content: 2.6% Overall Placement Location: Inlet tops, grid lines C-5, Station 0+06.12, gridlines A-2/A-1, Station 0+13.23 to 0+61.96, inet throats, grid lines (cont) Sample Location: Grid lines A-2/A-1, Station 0+13.23 to 0+61.96 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 08/30/2007 7 6.00 28.27 122,540 4,330 Unbonded Cap 1 2 09/20/2007 28 6.00 28.27 140,220 4,960 Cone/Split 1 3 09/20/2007 28 6.00 28.27 142,193 5,030 Cone/Shear Average 4,990 4 10/'18/2007 56 Remarks: Cont: E-2, Station 0+13.28 to 0+07.37, gridlines C-2, Station 0+58.95, gridlines B-3, Station 0+08.21, gridlines 8-4, Station 0+13.28 Technician: Montreal Bailey Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-ec Lacy Construction Attn: Mr. Kevin Briles 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 01 :30pm Finished: 06:15pm Rone Engineering P-ad- -J K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, SOO 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 296801 Project No.: 0612510 Date of Service: 08/24/2007 Report Date: 09/27/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: LMC Plant: 3 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 1701 Placement Date: 08/24/2007 Weather Conditions: Sunny Time Sampled: 02:15pm Temperature - Air: 940F Truck No: 972 Air Content: NA Overall Placement Location: Curb inlets (tops) Point West Blvd. Measured Slump (inches) 4.0 Batch time: 01 :29pm Concrete: 900F Ticket No: 3235803 Unit Weight (pet): NA Sample Location: Station 0+13.40 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 08/31/2007 7 6.00 28.27 101,330 3,580 Unbonded Cap 1 2 09/21/2007 28 6.00 28.27 125,980 4,460 Cone/Shear 1 3 09/21/2007 28 6.00 28.27 128,510 4,550 Cone/Shear Average 4,500 4 10/19/2007 56 Technician: Denny Harris Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 01 :45pm Finished: 03:00pm Rone Engineering /~~~ K. Scott Watson, AET Project Manager LIMIT A nONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, etc.) or any other feature of similar sUbject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/LB) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 297201 Project No.: 0612510 Date of Service: 08/27/2007 Report Date: 09/27/2007 Project: Lesley Infrastructure Services: Test Compressive Strength samples delivered to laboratory. PROJECT DATA Contractor: Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" - 7" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 7751 Placement Date: 08/27/2007 Weather Conditions: Sunny Time Sampled: 10:30am Temperature - Air: Truck No: NA Air Content: NA Overall Placement Location: Curb inlet throat Measured Slump (inches) Batch time: Concrete: Ticket No: NA Unit Weight (pet): NA Sample Location: Station 3+50, lateral A-2, Station 0+61.96, lateral A-1, Station 0+06.12, lateral C-5, Station 30+06.12, lateral C, Station 12+83.36, line A, Station 0+66.40, lateral A-3 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 09/03/2007 7 6.00 28.27 110,630 3,910 Unbonded Cap 2 09/24/2007 28 6.00 28.27 145,470 5,140 Cone/Split 3 09/24/2007 28 6.00 28.27 144,710 5,120 Cone/Split Average 5,130 4 10/22/2007 56 Remarks: All information other than concrete compressive strength test results was provided by the contractor and assumed to be correct. Technician: Undefined Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-ec Lacy Construction Attn: Mr. Kevin Briles 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Rone Engineering P-~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 1 of 1