Loading...
Duke Lesley-LR070921 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 295814 Project No.: 0612510 Date of Service: 08/16/2007 Report Date: 09/21/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: Lacy Plant: On site Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 6" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Batch time: 12:00pm Concrete: 900F Ticket No: NA Unit Weight (pet): NA Measured Slump (inches) 1.25 Mix Design I.D.: 5194 Placement Date: 08/16/2007 Weather Conditions: Clear Time Sampled: 12:05pm Temperature - Air: 900F Truck No: NA Air Content: 4.7% Overall Placement Location: Paving, Dividend St. median, Station 0+00 to 2+50, eastbound Dividend turn lanes at median, (cont) Sample Location: Dividend turn lane, Station 12+00 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 2 1 08/20/2007 4 6.00 28.27 82,880 2,930 Unbonded Cap 2 2 08/23/2007 7 6.00 28.27 86,590 3,060 Unbonded Cap 2 3 09/13/2007 28 6.00 28.27 120,500 4,260 Cone/Split 2 4 09/13/2007 28 6.00 28.27 103,870 3,670 Cone/Split Average 3,970 Remarks: Cant: Station 11+80 to 13+45, 15+10 to 16+80, 18+00 to 19+90, 21+10 to 22+80 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 2 of 3 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630.9745 Report of Concrete Compressive Strength Test Report No.: 295814 Project No.: 0612510 Date of Service: 08/16/2007 Report Date: 09/21/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: Lacy Plant: On site Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 6" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Batch time: 03:10pm Concrete: 900F Ticket No: NA Unit Weight (pet): NA Measured Slump (inches) 5.0 Mix Design 1.0.: 5194 Placement Date: 08/16/2007 Weather Conditions: Clear Time Sampled: 03:15pm Temperature - Air: 930F Truck No: NA Air Content: 5.5% Overall Placement Location: Paving, Dividend SI. median, Station 0+00 to 2+50, eastbound Dividend turn lanes at median, (cont) Sample Location: Dividend turn lane, Station 18+30 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 3 1 08/20/2007 4 6.00 28.27 78,910 2,790 Unbonded Cap 3 2 08/23/2007 7 6.00 28.27 90,720 3,210 Unbonded Cap 3 3 09/13/2007 28 6.00 28.27 108,760 3,850 Shear 3 4 09/13/2007 28 6.00 28.27 97,250 3,440 Cone/Shear Average 3,640 Remarks: Cont: Station 11+80 to 13+45, 15+10 to 16+80, 18+00 to 19+90, 21+10 to 22+80 Technician: Ryan Rawlinson Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (lB/lB) Page 3 of 3 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 295814 Project No.: 0612510 Date of Service: 08/16/2007 Report Date: 09/21/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: Lacy Plant: On site Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 6" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Batch time: 08:35am Concrete: 910F Ticket No: NA Unit Weight (pet): NA Measured Slump (inches) 4.5 Mix Design I.D.: 5194 Placement Date: 08/16/2007 Weather Conditions: Clear Time Sampled: 08:45am Temperature - Air: 890F Truck No: NA Air Content: 5.1 % Overall Placement Location: Paving, Dividend St. median, Station 0+00 to 2+50, eastbound Dividend turn lanes at median, (cent) Sample Location: Dividend St. median, Station 2+00 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 08/20/2007 4 6.00 28.27 71 ,090 2,510 Unbonded Cap 2 08/23/2007 7 6.00 28.27 79,320 2,810 Unbonded Cap 3 09/13/2007 28 6.00 28.27 94,290 3,330 Cone/Split 4 09/13/2007 28 6.00 28.27 85,250 3,020 Cone/Split Average 3,170 * * Does not comply with specified strength Remarks: Cont: Station 11+80 to 13+45, 15+10 to 16+80, 18+00 to 19+90, 21+10 to 22+80 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LBILB) Page 1 of 3 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 oncrete Compressive Strength Test Report No.: 296073 Project No.: 0612510 Date of Service: 08/18/2007 Report Date: 09/21/2007 ey Infrastructure . Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contrac . ~ Concrete Supplier: Lacy J A '01 P~nt Ons~ ~~ I Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 6" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 5194 1acement Date: 08/18/2007 eather Conditions: Cloudy ime Sampled: 07:20am Batch time: 07:15am Temperature - Air: 770F Concrete: 710F Truck No: NA Ticket No: NA Air Content: 5.7% Unit Weight (pet): NA Overall Placement Location: Paving, eastbound and westbound Dividend St., Station 34+70 to 34+00, below) Measured Slump (inches) 5.75 (conI. f Sample Location: D"'de"d, e.."oo"d '''e, S''''O" 34+20 fi ~ REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 08/21/2007 3 6.00 28.27 79,770 2,820 Unbonded Cap 1 2 08/25/2007 7 6.00 28.27 87,620 3,100 Unbonded Cap 1 3 09/15/2007 28 6.00 28.27 Cone/Split 1 4 09/15/2007 28 6.00 28.27 Remarks: Cont: eastbound turn lane, Station 22+50 to 19+85, 25+75 to 8+25, 32+25 to 34+00, 35+75 to 37+28, 39+00 to 4+05 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 1 of 3 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 296073 Project No.: 0612510 Date of Service: 08/18/2007 Report Date: 09/21/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: Lacy Plant: On site Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 6" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 5194 Placement Date: 08/18/2007 Weather Conditions: Clear Time Sampled: 08:45am Temperature - Air: 790F Truck No: NA Air Content: 4.6% Overall Placement Location: Paving, eastbound and westbound Dividend St., Station 34+70 to 34+00, below) Measured Slump (inches) 2.75 Batch time: 08:40am Concrete: 760F Ticket No: NA Unit Weight (pcf): NA (cont. Sample Location: Station 23+00 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 2 1 08/21/2007 3 6.00 28.27 88,290 3,120 Unbonded Cap 2 2 08/25/2007 7 6.00 28.27 91,340 3,230 Unbonded Cap 2 3 09/15/2007 28 6.00 28.27 109,010 3,860 Cone/Split 2 4 09/15/2007 28 6.00 28.27 120,470 4,260 Cone/Shear Average 4,060 Remarks: Cont: eastbound turn lane, Station 22+50 to 19+85, 25+75 to 28+25, 32+25 to 34+00, 35+75 to 37+28, 39+00 to 4+05 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 2 of 3 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 296073 Project No.: 0612510 Date of Service: 08/18/2007 Report Date: 09/21/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: Lacy Plant: On site Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 6" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 5194 Placement Date: 08/18/2007 Weather Conditions: Cloudy Time Sampled: 10:55am Temperature - Air: 840F Truck No: NA Air Content: 4.1 % Overall Placement Location: Paving, eastbound and westbound Dividend St., Station 34+70 to 34+00, below) Measured Slump (inches) 1.75 Batch time: 10:50am Concrete: 780F Ticket No: NA Unit Weight (pet): NA (cont. Sample Location: Station 36+00 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 3 1 08/21/2007 3 6.00 28.27 98,630 3,490 Unbonded Cap 3 2 08/25/2007 7 6.00 28.27 103,920 3,680 Unbonded Cap 3 3 09/15/2007 28 6.00 28.27 123,190 4,360 Cone/Split 3 4 09/15/2007 28 6.00 28.27 120,250 4,250 Cone/Split Average 4,300 Remarks: Cont: eastbound turn lane, Station 22+50 to 19+85,25+75 to 28+25,32+25 to 34+00,35+75 to 37+28,39+00 to 4+05 Started: 06: 15am Finished: 11 :30am Technician: Ryan Rawlinson Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Rone Engineering p~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (lB/lB) Page 3 of 3