Loading...
Duke Lesley-LR070920 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 298112 Project No.: 0612510 Date of Service: 09/07/2007 Report Date: 09/20/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: Southern Star Plant: 110 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 3" - 5" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Batch time: 02: 17pm Concrete: 1010F Ticket No: 1080408 Unit Weight (pet): NA Measured Slump (inches) 5.0 Mix Design I.D.: 9607 SA Placement Date: 09/07/2007 Weather Conditions: Clear Time Sampled: 02:45pm Temperature - Air: 950F Truck No: 26 Air Content: NA Overall Placement Location: Light pole on Dividend Drive and Stations 29+39,33+31,35+22,37+17,41+13,43+10 and 48+88 Sample Location: Station 29+39 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 09/14/2007 7 6.00 28.27 103,740 3,670 Cone/Shear 1 2 10/05/2007 28 1 3 10/05/2007 28 1 4 11/02/2007 56 Remarks: Water added at site: 5 gallons Technician: Jose Villanueva Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-ec Lacy Construction Attn: Mr. Kevin Briles 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 01 :15pm Finished: 03:45pm Rone Engineering p~.~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 296336 Project No.: 0612510 Date of Service: 08/21/2007 Report Date: 09/20/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: LMC Plant: 7 Specification Req uirements Strength: 4,200 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 1701 Placement Date: 08/21/2007 Weather Conditions: Cloudy Time Sampled: 03:50pm Temperature - Air: 950F Truck No: 5016 Air Content: 3.9% Overall Placement Location: Inlets poured at east and west bound lanes of Dividend at Station 12+90 Measured Slump (inches) 4.5 Batch time: 02:53pm Concrete: 970F Ticket No: 718326 Unit Weight (pct): NA Sample Location: Same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 08/28/2007 7 6.00 28.27 108,660 3,840 Unbonded Cap 1 2 09/18/2007 28 6.00 28.27 136,820 4,840 Cone/Split 1 3 09/18/2007 28 6.00 28.27 127,700 4,520 Cone/Split Average 4,680 1 4 10/16/2007 56 Technician: Ryan Rawlinson Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 01 :OOpm Finished: 04:45pm Rone Engineering p~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 296269 Project No.: 0612510 Date of Service: 08/21/2007 Report Date: 09/20/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: Lacy Plant: Onsite Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 6" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Batch time: 09:25am Concrete: 790F Ticket No: NA Unit Weight (pet): NA Measured Slump (inches) 5.5 Mix Design 1.0.: 5194 Placement Date: 08/21/2007 Weather Conditions: Clear Time Sampled: 09:30am Temperature - Air: 850F Truck No: NA Air Content: 5.6% Overall Placement Location: Paving, Dividend Street median sta 41+25 - 43+00; Approach from Beltline to Dividend Street Sample Location: 5' east, 30' south into approach REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 1 1 08/24/2007 3 6.00 28.27 75,210 2,660 Unbonded Cap 2 08/28/2007 7 6.00 28.27 89,850 3,180 Unbonded Cap 3 09/18/2007 28 6.00 28.27 108,090 3,820 Shear 4 09/18/2007 28 6.00 28.27 112,620 3,980 Cone/Split Average 3,900 Technician: Ryan Rawlinson Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-ec Lacy Construction Attn: Mr. Kevin Briles 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 06:30am Finished: 1 0:45am Rone Engineering ~~..~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (DM/LB) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214)630-9745 Report of Concrete Compressive Strength Test Report No.: 298570 Project No.: 0612510 Date of Service: 09/12/2007 Report Date: 09/20/2007 Project: Lesley Infrastructure Services: Test compressive strength test specimens prepared by others and picked up at the jobsite. PROJECT DATA Contractor: Concrete Supplier: TXI Plant: NA Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: NA Placement Date: 09/12/2007 Weather Conditions: NA Time Sampled: Temperature - Air: Truck No: NA Air Content: NA Overall Placement Location: Stamp concrete at median Sample Location: Station 47+ 75 through 49+00 REPORT OF TESTS Measured Slump (inches) Batch time: Concrete: Ticket No: NA Unit Weight (pet): NA Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 94,140 Cylinder Marked Date Set No. Tested 1 1 09/19/2007 1 2 10/10/2007 1 3 10/10/2007 1 4 11/07/2007 Age (days) 7 Diameter (in) 6.00 28 28 56 Area (in') 28.27 Compressive Strength (psi) 3,330 Fracture Type Shear Remarks: All information other than concrete compressive strength test data is supplied by others and is assumed to be correct. Technician: Denny Harris Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-ec Lacy Construction Attn: Mr. Kevin Briles 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Rone Engineering See Report 298569 fo,",hold," hmev~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/JB) Page 1 of 1