Loading...
Duke Lesley 3C-LR070927 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 297064 Project No.: 0711530 Date of Service: 08/28/2007 Report Date: 09/27/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" - 7" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7751 PW Placement Date: 08/28/2007 Weather Conditions: Sunny Time Sampled: 10:30am Temperature - Air: 920F Truck No: 132 Air Content: NA Overall Placement Location: Grid lines M/16.5 Batch time: 10:01am Concrete: 920F Ticket No: 13218 Unit Weight (pcf): NA Measured Slump (inches) 7.0 Sample Location: Same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 09/04/2007 7 6.00 28.27 92,910 3,290 Cone/Split 1 2 09/25/2007 28 6.00 28.27 103,660 3,670 Cone/Split 1 3 09/25/2007 28 6.00 28.27 111,690 3,950 Cone/Split Average 3,810 1 4 10/23/2007 56 Technician: Denny Harris Rone Engineering See Report 297063 for technician time~~ Report Distribution: o""'~: ::~t'"ct;oo, LP (0.11"" OX) Atto Me P,"' Byrne ' .' ... " ... . .' 1-cc Potter Concrete Attn: Mr. Ryan Skelly K S It W t AET 1-cc City of Coppell Attn: Mr. Lee Stone . p ~ t ~ son, 1-cc City of Coppell Attn: Mr. Larry Davis roJec anager ~ LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/LB) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 296908 Project No.: 0711530 Date of Service: 08/27/2007 Report Date: 09/27/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" - 7" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7751 PW Placement Date: 08/27/2007 Weather Conditions: Sunny Time Sampled: 11 :45am Temperature - Air: 960F Truck No: 112 Air Content: NA Overall Placement Location: Piers (see report #296907) Batch time: 11: 12am Concrete: 940F Ticket No: 13199 Unit Weight (pet): NA Measured Slump (inches) 4.0 Sample Location: Pier U13 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 1 1 09/03/2007 7 6.00 28.27 93,210 3,300 Unbonded Cap 1 2 09/24/2007 28 6.00 28.27 120,920 4,280 Cone/Split 1 3 09/24/2007 28 6.00 28.27 122,300 4,330 Cone/Split Average 4,300 4 10/22/2007 56 Remarks: Water added at site: 10 gallons Technician: Denny Harris Rone Engineering See Report 296907 for technician time~~ Report Distribution: 0",,' f,".':~ ;;'~y~t'"ct;oo, LP (0,,,,,, TXI Att" Me. P,"' Byme . .... . . . . . .. 1-cc Potter Concrete Attn: Mr. Ryan Skelly K. Scott Watson, AET 1-cc City of Coppell Attn: Mr. Lee Stone. Project Manager 1-cc City of Coppell Attn: Mr. Larry DavIs ~ LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMfLB) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 296708 Project No.: 0711530 Date of Service: 08/24/2007 Report Date: 09/27/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" - 7" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7751 PW Placement Date: 08/24/2007 Weather Conditions: Cloudy Time Sampled: 11 :25am Temperature - Air: 860F Truck No: 119 Air Content: NA Overall Placement Location: Grid lines K109.3 Batch time: 10:57am Concrete: 900F Ticket No: 13166 Unit Weight (pcf): NA Measured Slump (inches) 7.0 Sample Location: Grid line K109.3 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 1 1 08/31/2007 7 6.00 28.27 90,150 3,190 Unbonded Cap 1 2 09/21/2007 28 6.00 28.27 117,690 4,160 Cone/Split 1 3 09/21/2007 28 6.00 28.27 120,320 4,260 Cone/Split Average 4,210 4 10/19/2007 56 Technician: Denny Harris Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Brian Pierce (1-cc copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Rone Engineering 500 Report 296707 1m te,h";,;" t;mep ~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specifiC samples provided for testing. We assume no responsibility for variation in Quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LBILB) Page 1 of 1