Loading...
Duke Lesley 3C-LR070920 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 299108 Project No.: 0711530 Date of Service: 09/18/2007 Report Date: 09/20/2007 Project: Point West Office I Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Paving from Beltline entrance north to north entrance and from Beltline west 320', Items Inspected: Co nfo rm ing Non Items Inspected: Conforming Non Items Inspected: Co nfo rm ing Non Co nfo rm ing Conforming Conforming P lac ing Drawings Bar Length Column Ties Properly Approved x and Shape x Tied and Spaced NA Bar Size x Proper B ar Placement x Stirrup Spacing NA Bar Grade x Property Tied x Stirrup Type NA Bars Clean x Dowel Bars in Place x Lapped Splices x Form Clean x P roper Bar Suppo rts NA Co mer Bars NA Number of Bars x ProperCover NA Mechanical Splices NA Discrepancies f Comments: 1. Chairs to be added during concrete placement. Technician: Chris Harbour Started: 04:15pm Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc City of Cop pel! Attn: Mr. Lee Stone 1-cc City of Coppel! Attn: Mr. Larry Davis Finished: 06:30pm Rone Engineering p~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be repnoduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 293425 Project No.: 0711530 Date of Service: 07/25/2007 Report Date: 09/20/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: LMC Plant: 7 Specification Requirements Strength: 4,200 psi @ 28 days Slump (in.): 3" - 5" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 1701 Placement Date: 07/25/2007 Weather Conditions: Sunny Time Sampled: 03:15pm Temperature - Air: 940F Truck No: 1124 Air Content: NA Overall Placement Location: Manhole structure walls, cast in place junction box Measured Slump (inches) 4.0 Batch time: 02:09pm Concrete: 960F Ticket No: 7180288 Unit Weight (pcf): NA Sample Location: Station 0+73.22 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 08/01/2007 7 6.00 28.27 90,220 3,190 Unbonded Cap 1 2 08/22/2007 28 6.00 28.27 119,980 4,240 Unbonded Cap 1 3 08/22/2007 28 6.00 28.27 116,720 4,130 Unbonded Cap Average 4,190 * 4 09/19/2007 56 6.00 28.27 119,810 4,240 Cone/Shear * Does not comply with specified strength Remarks: Water added at site: 5 gallons Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Brian Pierce (1-cc copy) 1-cc Potter Concrete Attn: Mr. Ryan Skelly 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Rone Engineering s.. Report 293364 1m leel,,"'," t;me P-~ ~ K. Scott Watson, AET Project Manager Technician: Denny Harris LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, ltd. (LB/LB) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630.9745 Report of Concrete Compressive Strength Test Report No.: 296400 Project No.: 0711530 Date of Service: 08/22/2007 Report Date: 09/20/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" - 7" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7751 PW Placement Date: 08/22/2007 Weather Conditions: Cloudy Time Sampled: 1 0:40am Temperature - Air: 900F Truck No: 137 Air Content: NA Overall Placement Location: Point West I - H/14 Batch time: 10:05am Concrete: 920F Ticket No: 13120 Unit Weight (pet): NA Measured Slump (inches) 7.0 Sample Location: Grid line H/14 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 08/29/2007 7 6.00 28.27 87,720 3,100 Unbonded Cap 1 2 09/19/2007 28 6.00 28.27 111,660 3,950 Cone/Split 1 3 09/19/2007 28 6.00 28.27 116,510 4,120 Cone/Split Average 4,030 1 4 10/17/2007 56 Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Brian Pierce (1-cc copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Rone Engineering See Report 296399 fm techo;"," umep~ ~ K. Scott Watson, AET Project Manager Technician: Denny Harris LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar sUbject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 296252 Project No.: 0711530 Date of Service: 08/21/2007 Report Date: 09/20/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" - 7" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 7751 PW Placement Date: 08/21/2007 Weather Conditions: Partly cloudy Time Sampled: 11 :35am Batch time: 11 :04am Temperature - Air: 870F Concrete: 920F Truck No: 127 Ticket No: 13101 Air Content: NA Unit Weight (pet): NA Overall Placement Location: See Drilled Pier inspection Measured Slump (inches) 6.5 Sample Location: Pier PIg REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 1 1 08/28/2007 7 6.00 28.27 65,650 2,320 Unbonded Cap 1 2 09/18/2007 28 6.00 28.27 85,180 3,010 Cone/Split 1 3 09/18/2007 28 6.00 28.27 82,190 2,910 Cone/Split Average 2,960 * 4 10/16/2007 56 * Does not comply with specified strength Technician: Gary Kamrath Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Brian Pierce (1-cc copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Rone Engineering 500 Report 296251 toctecho'o''" 1imep~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, ltd. (CH/LB) Page 1 of 1