Duke Lesley 3C-LR070919
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 298903
Project No.: 0711530
Date of Service: 09/17/2007
Report Date: 09/19/2007
Project: Point West Office I
Services: Perform In-Place Density Testing
PROJECT DATA
Contractor: Duke Construction, LP
Test Method: ASTM D-6938
Gauge: Troxler 3430
Gauge Serial No: 35518
Test Mode: DT
Standard Counts
Moisture Density
Current: 739 Current: 2519
Previous: 741 Previous: 2526
MOISTURE DENSITY RELATIONS
MID No.
272998
Description
Brown I Silty Clay wI Organics
Moisture
%
Maximum
Density
(pet)
96.5
Project Requirements
Moisture Density
Minimum +4 92-96
22.5
Test
No
Test Location
FIELD DENSITY TESTS
Probe MID
Depth No.
Moisture Wet Density Dry Density Density
% (pet) (pet) (% maxI
Utility backfill
35' from south end of TXU line, 3' below grade 6" 272998 28.7 118.3 91.9 95
Utility backfill
2 35' from south end of TXU line, 2' below grade 6" 272998 29.7 117.1 90.3 94
Utility backfill
3 35' from south end of TXU line, l' below grade 6" 272998 28.7 117.0 90.9 94
Utility backfill
4 35' from south end of TXU line, final 6" 272998 29.1 116.6 90.3 94
Technician: Joe Jernigan Started: 07:15am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Finished: 10:00am Rone Engineering
p-~.~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, LId
(CH/JS) Page 1 of 1
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 298183
Project No.: 0711530
Date of Service: 09/08/2007
Report Date: 09/19/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 5%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design 1.0.: 7752 PW
Placement Date: 09/08/2007
Weather Conditions: Clear
Time Sampled: 05:20am
Temperature - Air: 790F
Truck No: 108
Air Content: 4.3%
Overall Placement Location:
Paving at Point West 1, building 1 - southern half of east parking
Measured
Slump
(inches)
6.0
Batch time: 05:03am
Concrete: 860F
Ticket No: 7345
Unit Weight (pct): NA
Sample Location:
65' north, 100' west from southeast corner of paving
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Maximum
Load
(Ibs)
88,740
Cylinder
Marked Date
Set No. Tested
3 1 09/15/2007
3 2 10/06/2007
3 3 10/06/2007
3 4 11/03/2007
Age
(days)
7
Diameter
(in)
6.00
28
28
56
Compressive
Strength
(psi)
3,140
Fracture
Type
Cone/Split
Area
(in2)
28.27
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/JB) Page 3 of 7
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 298183
Project No.: 0711530
Date of Service: 09/08/2007
Report Date: 09/19/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 5%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design 1.0.: 7752 PW
Placement Date: 09/08/2007
Weather Conditions: Clear
Time Sampled: 07:15am
Temperature - Air: 800F
Truck No: 135
Air Content: 4.8%
Overall Placement Location:
Paving at Point West 1, building 1 - southern half of east parking
Measured
Slump
(inches)
6.5
Batch time: 06:52am
Concrete: 880F
Ticket No: 7355
Unit Weight (pct): NA
Sample Location:
110' north, 50' west from northeast corner of paving
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Maximum
Load
(Ibs)
91,230
Cylinder
Marked Date
Set No. Tested
4 1 09/15/2007
4 2 10/06/2007
4 3 10/06/2007
4 11/03/2007
Age
(days)
7
Diameter
(in)
6.00
28
28
56
Compressive
Strength
(psi)
3,230
Fracture
Type
Shear
Area
(in')
28.27
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar sUbject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/JB) Page 4 of 7
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 298183
Project No.: 0711530
Date of Service: 09/08/2007
Report Date: 09/19/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 5%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 7752 PW
Placement Date: 09/08/2007
Weather Conditions: Sunny, clear
Time Sampled: 08:15am Batch time: 07:57am
Temperature. Air: 850F Concrete: 920F
Truck No: 108 Ticket No: 7364
Air Content: 4.8% Unit Weight (pcf): NA
Overall Placement Location:
Paving at Point West 1, building 1 - southern half of east parking
Measured
Slump
(inches)
5.25
Sample Location:
150' north, 100' west from southeast corner of paving
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Maximum
Load
(Ibs)
80,190
Cylinder
Marked Date
Set No. Tested
5 1 09/15/2007
5 2 10/06/2007
5 3 10/06/2007
5 4 11/C3/2007
Age
(days)
7
Diameter
(in)
6.00
28
28
56
Remarks: Water added at site: 10 gallons
Compressive
Strength
(psi)
2,840
Fracture
Type
Cone/Split
Area
(in')
28.27
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approyal of Rone Engineering Services, Ltd.
(CH/JS) Page 5 of 7
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 298183
Project No.: 0711530
Date of Service: 09/08/2007
Report Date: 09/19/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 5%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 7752 PW
Placement Date: 09/08/2007
Weather Conditions: Sunny, clear
Time Sampled: 10:30am Batch time: 10:09am
Temperature - Air: 850F Concrete: 920F
Truck No: 108 Ticket No: 7381
Air Content: 4.5% Unit Weight (pcf): NA
Overall Placement Location:
Paving at Point West 1, building 1 - southern half of east parking
Measured
Slump
(inches)
5.0
Sample Location:
200' north, 125' west from southeast corner of paving
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
6 1 09/15/2007 7 6.00 28.27 83,530 2,950 Shear
6 2 10/06/2007 28
6 3 10/06/2007 28
6 4 11/03/2007 56
Remarks: Water added at site: 10 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/JB) Page 6 of 7
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 298183
Project No.: 0711530
Date of Service: 09/08/2007
Report Date: 09/19/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 5%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1 064
ASTM C-138
ASTM C-39
Mix Design 1.0.: 7752 PW
Placement Date: 09/08/2007
Weather Conditions: Clear
Time Sampled: 11: 1 Oam
Temperature - Air: 85DF
Truck No: 137
Air Content: 4.5%
Overall Placement Location:
Paving at Point West 1, building 1 - southern half of east parking
Measured
Slump
(inches)
5.0
Batch time: 1 0:42am
Concrete: 95DF
Ticket No: 7387
Unit Weight (pet): NA
Sample Location:
240' north, 75' west from southeast corner of paving
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Maximum
Load
(Ibs)
82,570
Cylinder
Marked Date
Set No. Tested
7 1 09/15/2007
7 2 10/06/2007
7 3 10/06/2007
7 4 11/03/2007
Age
(days)
7
Diameter
(in)
6.00
28
28
56
Remarks: Water added at site: 10 gallons
Compressive
Strength
(psi)
2,920
Fracture
Type
Shear
Area
(in')
28.27
Started: 02:00am Finished: 01 :45pm
Technician: Montreal Bailey
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc Potter Concrete Attn: Mr. Ryan Skelly
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Rone Engineering
p~~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/JB) Page 7 of 7
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630.9745
Report of Concrete Compressive Strength Test
Report No.: 298183
Project No.: 0711530
Date ot Service: 09/08/2007
Report Date: 09/19/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 5%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design I.D.: 7752 PW
Placement Date: 09/08/2007
Weather Conditions: Clear
Time Sampled: 04:40am
Temperature - Air: 790F
Truck No: 144
Air Content: 4.0%
Overall Placement Location:
Paving at Point West 1, building 1 - southern half of east parking
Measured
Slump
(inches)
4.0
Batch time: 04:21am
Concrete: 860F
Ticket No: 7337
Unit Weight (pet): NA
Sample Location:
30' north, 25' west from southeast corner of paving
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Maximum
Load
(Ibs)
132,780
Cylinder
Marked Date
Set No. Tested
2 1 09/15/2007
2 2 10/06/2007
2 3 10/06/2007
2 4 11/03/2007
Age
(days)
7
Diameter
(in)
6.00
28
28
56
Compressive
Strength
(psi)
4,700
Fracture
Type
Cone/Split
Area
(in')
28.27
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/JB) Page 2 of 7
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 298183
Project No.: 0711530
Date of Service: 09/08/2007
Report Date: 09/19/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 5%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design I.D.: 7752 PW
Placement Date: 09/08/2007
Weather Conditions: Clear
Time Sampled: 03:30am
Temperature - Air: 790F
Truck No: 142
Air Content: 4.1 %
Overall Placement Location:
Paving at Point West 1, building 1 - southern half of east parking
Measured
Slump
(inches)
4.5
Batch time: 02:55am
Concrete: 860F
Ticket No: 7325
Unit Weight (pcf): NA
Sample Location:
15' north, 10' west from southeast corner of paving
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Maximum
Load
(Ibs)
140,000
Cylinder
Marked Date
Set No. Tested
1 1 09/15/2007
1 2 10/06/2007
1 3 10/06/2007
1 4 11/03/2007
Age
(days)
7
Diameter
(in)
6.00
28
28
56
Compressive
Strength
(psi)
4,950
Fracture
Type
Cone/Shear
Area
(in2)
28.27
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/JB) Page 1 of 7
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 298031
Project No.: 0711530
Date of Service: 09/07/2007
Report Date: 09/19/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter
Plant: 01
Specification Requirements
Strength: 3,000 psi @ 28 days
Slump (in.): 5" - 7"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 7751 PW
Placement Date: 09/07/2007
Weather Conditions: Sunny
Time Sampled: 09:40am
Temperature - Air: 840F
Truck No: 1063
Air Content: NA
Overall Placement Location:
Piers, Station F.1/9.9
Batch time: 08:49am
Concrete: 860F
Ticket No: 13297
Unit Weight (pet): NA
Measured
Slump
(inches)
5.0
Sample Location:
Station F.1/9.9
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
1 1 09/14/2007 7 6.00 28.27 78,810 2,790 Cone/Split
1 2 10/05/2007 28
1 3 10/05/2007 28
1 4 11/02/2007 56
Technician: Denny Harris Rone Engineering
See Report 298030 for technician time~~
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Alln: Mr. Paul Byrne .' . . .... ." .' . .' .'
(1-ec copy) -
1-cc p~ller Concrete Alln: Mr. Ryan Skelly K. Scott Watson, AET
1-cc City of Coppell Alln: Mr. Lee Stone p . t M
.' roJec anager
1-cc City of Coppell Alln: Mr. Larry DaVIS
~
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/JB) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 298872
Project No.: 0711530
Date of Service: 09/17/2007
Report Date: 09/19/2007
Project: Point West Office I
Services: Straight Shaft Pier Inspection
Report of Inspection
D rille r: M cK inney
Pier Identification F .8/01 H 118 F .2/1 8
PierDiameter(in) 3 0 IF 7 30 IF 7 30 IF 7
Depth of Pier From Surface(ft) 46.00 43.40 44.00
Depth ofBearinq Stratum Fro m Surface (ft) 37.00 33.00 34.00
Required Penetration (ft) 9.00 9.00 9.00
A ctua I P e ne tra tio n (ft)* 9.00 10.40 10.00
Con d i ti 0 n 0 f Botto m (wet/dry) Dry Dry Dry
Plumb Within Tolerance (yes Ino) Yes Yes Yes
Casinq Diameter(in)/Casing Lenqth (ft) N/A N/A N/A
NumberofBars IReinforcing BarSize 33/35.8 33/35.8 33/35.8
Le ng th of R e info rcing S tee I (ft) 44.00 41.00 42.00
Time Drilling was Completed (am I pm) 8 :2 0 AM 1 1 :30 AM 1 :20 P M
Time Concrete was Placed (am Ipm) 10:20 AM 12:45 PM 2:15 PM
De p th 0 f Pie r Fro m Top 0 f Con c re te (ft) 44.42 41.82 42.42
E leva tio n: S urfa ce (ft)** 99.58 99.58 99.58
Elevation:Top of Pier (ft)** 98.00 98.00 98.00
Elevation: Bottom ofPier(ft)** 53.58 56.18 55.58
Elevation: Top ofBearinq Stratum (ft.) ** 62.58 66.58 65.58
Bearinq Stratum (description) Gray shale
Note: See report # 298904 for Compressive Strength Test Specimens.
. Additional Penetration not requested unless noted. HE levation by others
Technician: Denny Harris Started: 06:15am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Finished: 03:00pm Rone Engineering
P-ad- ~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 1
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295798
Project No.: 0711530
Date of Service: 08/16/2007
Report Date: 09/19/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Redi-Mix
Plant: 136
Specification Requirements
Strength: 3,000 psi @ 28 days
Slump (in.): 5" - 7"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 830J1521
Placement Date: 08/16/2007
Weather Conditions: Clear
Time Sampled: 11 :32am
Temperature - Air: 930F
Truck No: 1039
Air Content: NA
Overall Placement Location:
Piers (see report #295797)
Batch time: 10:50am
Concrete: 950F
Ticket No: 13694307
Unit Weight (pet): NA
Measured
Slump
(inches)
5.75
Sample Location:
Pier P/5.S
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 08/23/2007 7 6.00 28.27 92,550 3,270 Unbonded Cap
1 2 09/13/2007 28 6.00 28.27 115,280 4,080 Cone/Split
1 3 09/13/2007 28 6.00 28.27 114,000 4,030 Shear
Average 4,050
4 10/11/2007 56
Remarks: Water added at site: 10 gallons
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Attn: Mr. Brian Pierce (1-cc copy)
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Rone Engineering
$e, R",ort 295797 foc"clm;aoo tim'p~ ~
K. Scott Watson, AET
Project Manager
Technician: Gerry Graham
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar SUbject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(LB/LB) Page 1 of 1