Loading...
Duke Lesley 3C-LR070914 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 297741 Project No.: 0711530 Date of Service: 09/01/2007 Report Date: 09/14/2007 Project: Point West Office I Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Building slab on grade, grid lines 1.1-8.8/D-J.8. Items Inspected: Co nfo rm ing Non Item s Inspected: Conforming Non Items Inspected: Confonming Non Conforming Conforming Conform ing Placing Drawings Bar Length Column Ties Properly Appro ved x and Shape x Tied and Spaced NA Bar Size x Proper B ar P lacem ent x Stirrup Spacing NA Bar Grade x Pro perly Tied x Stirrup Type NA Bars Clean x Dowel Bars In Place x Lapped Splices x Form Clean x Pro per B ar Suppa rts NA CornerBars NA NumberofBars x Pro per Co ver NA Mechanical Splices NA Discrepancies f Comments: 1. Chairs to be placed during concrete placement. Technician: Chris Harbour Started: 09:30am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Finished: 11 :OOam Rone Engineering P-~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMIKW) Page 1 of 1 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 298162 Project No.: 0711530 Date of Service: 09/07/2007 Report Date: 09/14/2007 Project: Point West Office I Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Southeast parking from Beltline entrance, south 370' and from east edge westward 130' (locations provided by Keith with Duke). Item s Inspected: Conforming Non Items Inspected: Co nfo rm ing Non Item s Inspected: Conforming Non Co nform ing Conforming Co nfo rm ing Placing Drawings Bar Length Co lumn Ties Pro perly Appro ved x and Shape x Tied and Spaced NA 8 ar Size x P fa per Bar P lacem ent x Stirrup Spacing NA Bar Grade x Pro perly Tied x Stirrup Type NA Bars Clean x DowelS ars in Place x Lapped Splices x Form Clean x P roper Bar Suppo rts x Corner Bars NA NumberofBars x P roper Cover x Mechanical Splices NA Discrepancies / Comments: No apparent discrepancies were noted at the locations listed above. Technician: Chris Harbour Started: 04:15pm Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Attn Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Finished: 06:30pm Rone Engineering P-~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMIKW) Page 1 of 1 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 298030 Project No.: 0711530 Date of Service: 09/07/2007 Report Date: 09/14/2007 Project: Point West Office I Services: Straight Shaft Pier Inspection Report of Inspection D rille r: M cK inney Pier Identification F .1 19 .9 H .9/0 1 F .8/0 1 Pier Diameter (in) 3 0 IF 7 30 IF 7 3 0 IF 7 Depth of Pier From Surface(ft) 45.20 46.50 (") III Depth of Bearing Stratum Fro m S u rfa ce (ft) 35.20 36.70 ::> C'l CD Required Penetration (ft) 9.00 9.00 r0- o. Actual Penetration (ft)* 10.00 9.80 , s: Dry Dry CD Condition of Bottom (wet I dry) C'l ::T Yes '" Plumb Within Tolerance (yes Ino) Yes ::> o' Casing Diameter(in)/Casing Length (ft) 33/35.8 33/35.8 ~ N 1:1 NumberofBars IReinforcing BarSize 9 1#6 9 1#6 c;, <3 0 CT Length of Reinforcing Steel (ft) 43.00 44.00 1:1 ro- 3 3 Time Drillinq was Completed (am Ipm) 8 :3 3 AM 10 :5 1 AM '" 0 ::> Time Concrete was Placed (am Ipm) 9 :3 0 AM 1 1 :45 A M ~ D e p th 0 f Pie r Fro m Top 0 f Con c re te (ft) 43.62 44.92 ~ cO' Elevation: Surface (ft)** 99.58 99.58 a E Ie va ti 0 n: Top 0 f Pie r (ft) ** 98.00 98.00 3 ~ of Pier (ft)** N Elevation: Bottom 54.38 53.08 c;, 0 Elevation: Top of Bearing Stratum (ft. ) ** 64.38 62.88 0 Bearing Stratum (description) Grayshale Note: See re po rt # 298031 for C om pressive Strength Test S pecim ens. . Add itio na I P enetratio n not req ue sted unle s s no ted. **E leva tio n by othe rs Technician: Denny Harris Started: 06: 15am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) AUn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell AUn: Mr. Lee Stone 1-cc City of Coppell AUn: Mr. Larry Davis Finished: 03:00pm Rone Engineering P-~ ~ K. Scott Watson, AET Project Manager LIMIT A nONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CHIKW) Page 1 of 1 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Moisture Density Relationship Report No.: 298441 Project No.: 0711530 Date of Service: 09/12/2007 Report Date: 09/14/2007 Project: Point West Office I Services: Obtain a sample of material from the jobsite, bring the sample back to the laboratory and perform a moisture density relationship test in accordance with ASTM Standards. PROJECT DATA Contractor: Duke Construction, LP Test For: Flexible Base Material: Recycled CrushedConcrete Classification: Flexible Base Test Method: ASTM D-698 ASTM D-4318, Method-C Date Sampled: Material Preparation: Rammer Type: Sampled By: Sample Location: On Site, Stockpile 09/12/2007 Dry Mechanical Jernigan, Joe REPORT OF TEST Maximum Dry Density, pcf: Optimum Moisture Content, %: 115.7 13.0 125 100% saturation line I for S8 = 2.7 Estimated i - Liquid Limit: 32 Plastic Limit: 29 Plasticity Index: 3 120 13 i:2. >: ~ c 115 1IJ o e:- o 110 105 9 10 11 12 13 1( 15 Iii 11 1. tvbisture Content. pe",ent Technician: Joe Jernigan Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Altn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Altn: Mr. Lee Stone 1-cc City of Coppell Altn: Mr. Larry Davis Started: 11 :15am Finished: 12:30pm Rone Engineering P-~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (DC/JB) Page 1 of 1 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 298121 Project No.: 0711530 Date of Service: 09/07/2007 Report Date: 09/14/2007 Project: Point West Office I Services: Perform In-Place Density Testing PROJECT DATA Contractor: Duke Construction, LP Test Method: ASTM D-6938 Gauge: Troxler 3430 Gauge Serial No: 35518 Test Mode: DT Standard Counts Moisture Density Current: 730 Current: 2519 Previous: 731 Previous: 2494 MOISTURE DENSITY RELATIONS MID No. 272998 Description Brown I Silty Clay wi Organics Moisture % Maximum Density (pet) 96.5 Project Requirements Moisture Density Optimum+4 95 minimum 22.5 FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pet) (pet) (% maxI - Trench fill 1 25' from north end of electric line, 3' below 6" 272998 24.2 116.4 93.7 97 grade Trench fill 2 25' from north end of electric line, 2' below 6" 272998 24.8 115.3 92.4 96 grade Trench fill 3 25' from north end of electric line, l' below 6" 272998 25.3 114.8 91.6 95 grade Trench fill 4 25' from north end of electric line, final 6" 272998 25.2 115.4 92.2 96 Technician: Joe Jernigan Started: 03:30pm Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Finished: 05:45pm Rone Engineering ~~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (JB/KW) Page 1 of 1