Loading...
Gateway BP(3.1)-LR070920 Rone Engineering . Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 298445 Project No.: 0712786 Date of Service: 09/12/2007 Report Date: 09/20/2007 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Constructors & Associates Concrete Supplier: LMC Plant: LMC Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 1551 Placement Date: 09/12/2007 Weather Conditions: Cloudy, calm Time Sampled: 02:05pm Batch time: 01:13pm Temperature - Air: 850F Concrete: 920F Truck No: 7025 Ticket No: 179325 Air Content: 4.2% Unit Weight (pcf): NA Overall Placement Location: 10' curb inlet, Station 7+00.9, LN A-2 Measured Slump (inches) 4.75 Sample Location: Station 7+00.9 LN A-2 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 09/19/2007 7 6.00 28.27 91,660 3,240 Cone/Split 1 2 09/26/2007 14 3 10/10/2007 28 4 11/07/2007 56 Remarks: Water added at site: 5 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (fM/JB) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630.9745 Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 Report of Structural Steel Re-Inspection Report No.: 606839 Project No.: 0712786 Date of Service: 09/17/2007 Report Date: 09/20/2007 Project: Gateway Business Center Coppell, Texas Services: Structural Steel Re-Inspection Report of Re-Inspection C 0 lu m n Bas e P la te s L 0 c a tio n: Build in 9 2, c.o lu m n an c h 0 r bolt te n s io n re -in s pee tio n, p a rtia I in s pee tio n fro m re port # 6 06823, date d 09/1 2/07. Non Cod e Compliant Compliant AWS D 1 .1 A IS C Jeb Specs Anchor Belt Tension Verificatien x x x Greuted Bas e P la te s x x x C .0 m men ts C .0 lu m n s with 91707 A B G 0 K w ritte n .0 n th e ce lu m n s are com p Iia n t. A II ethers require re-work with re-inspectien. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control: Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/JB) Page 1 of 4 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 Report of Structural Steel Re-Inspection Report No.: 606839 Project No.: 0712786 Date of Service: 09/17/2007 Report Date: 09/20/2007 Project: Gateway Business Center Coppell, Texas Services: Structural Steel Re-Inspection Structural Fram ing Location: Buildling 2, 2nd floor framing, partial bolt tension re-inspection from report #606823, dated 09/12/07, grid lines 1.17/A.E. Non Code Com pliant Com pliant AWS 01.1 AISC Job Specs Bolt Tension Verification: Beam to Beam x x x Bolt Tension Verification: Beam to Colum n x x x Bolt Tension Verification: Girder to Column Weld Profile WQT's Structural Visual Touch-Up Paint Verification Com m ents: Partial inspection perform ed, rem ainder to be inspected at a later date. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/JB) Page 2 of 4 Rone Engineering . Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 Project: Gateway Business Center Cappell, Texas Services: Structural Steel Re-Inspection 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Structural Steel Re-Inspection Report No.: 606839 Project No.: 0712786 Date of Service: 09/17/2007 Report Date: 09/20/2007 Location: She e 1 Dee k A Ita c h men 1 10 S lru c tu ra IF ra m In 9 2nd floor,deck re-Inspection,grid lines t-6/A-E,bulldlng 2,weld and Nelson slud inspection, Ilem 2(blfrom reporl#606796.daled 09/05/07. Non C ode C om plianl C o m P Ii ant AW S D t .3 S D I Job Specs V Isua I V e rlflca lio n P u d d Ie Weld s x X X X V Is u a I V e r I fl c a ti 0 n Pow d erA c tu a Ie d V Is u a I V e rifle a lio n Pneumalic V Is u a I Veri fl c a Ii 0 n Tek Sere w s at Sid e Lao S SheetDeck M e c h a n I cally Fastened with Self Tap pin 9 Sere w s x x x S id e Lap s M echanicallv C rim ped S he e t 0 e c k In te rlo r A lIa c h men I P a lie rn X X X X S he e t D e c k P erim eler AlIachm en I P a tIe rn x x x x N e Is 0 n S lu d Verification X X X X W Q T's She e I S Ie e I Commenls:ltem 2(b)ls cleared from the above referenced report. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/JB) Page 3 of 4 Rone Engineering . Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 296270 Project No.: 0712786 Date of Service: 08/21/2007 Report Date: 09/20/2007 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Constructors & Associates Concrete Supplier: Redi Mix Plant: 88 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Batch time: 03:01 am Concrete: 830F Ticket No: 88053366 Unit Weight (pet): NA Measured Slump (inches) 6.0 Mix Design I.D.: 23601524 Placement Date: 08/21/2007 Weather Conditions: Clear Time Sampled: 04:00am Temperature - Air: 750F Truck No: 1310 Air Content: 5.0% Overall Placement Location: Paving, north 34 degrees, 23', 31" west to 42 degrees, 29' 8" west, pg C2.01 grading plan south Sample Location: Same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 1 1 08/24/2007 3 6.00 28.27 65,640 2,320 Unbonded Cap 2 08/28/2007 7 6.00 28.27 81,110 2,870 Unbonded Cap 1 3 09/18/2007 28 6.00 28.27 104,550 3,700 Shear 1 4 09/18/2007 28 6.00 28.27 107,250 3,790 Cone/Split Average 3,750 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (DMlLB) Page 1 of 5 Rone Engineering . Client: Transwestern Commercial SeNices 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 296270 Project No.: 0712786 Date of Service: 08/21/2007 Report Date: 09/20/2007 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Constructors & Associates Concrete Supplier: Redi Mix Plant: 88 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Batch time: 04:16am Concrete: 870F Ticket No: 88053374 Unit Weight (pet): NA Measured Slump (inches) 5.5 Mix Design I.D.: 23601524 Placement Date: 08/21/2007 Weather Conditions: Clear Time Sampled: 05:00am Temperature - Air: 790F Truck No: 1219 Air Content: 5.3% Overall Placement Location: Paving, north 34 degrees, 23', 31" west to 42 degrees, 29' 8" west, pg C2.01 grading plan south Sample Location: Same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 2 1 08/24/2007 3 6.00 28.27 67,270 2,380 Unbonded Cap 2 2 08/28/2007 7 6.00 28.27 81,360 2,880 Unbonded Cap 2 3 09/18/2007 28 6.00 28.27 106,860 3,780 Cone/Split 2 4 09/18/2007 28 6.00 28.27 115,620 4,090 Cone/Split Average 3,930 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (DM/LB) Page 2 of 5 Rone Engineering . Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 296270 Project No.: 0712786 Date of Service: 08/21/2007 Report Date: 09/20/2007 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Constructors & Associates Concrete Supplier: Redi Mix Plant: 88 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 Batch time: 05:23am Concrete: 870F Ticket No: 88053382 Unit Weight (pet): NA Measured Slump (inches) 5.0 Mix Design 1.0.: 23601524 Placement Date: 08/21/2007 Weather Conditions: Clear Time Sampled: 06:00am Temperature - Air: 780F Truck No: 1260 Air Content: 5.0% Overall Placement Location: Paving, north 34 degrees, 23', 31" west to 42 degrees, 29' 8" west, pg C2.01 grading plan south Sample Location: Same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 3 1 08/24/2007 3 6.00 28.27 72,660 2,570 Unbonded Cap 3 2 08/28/2007 7 6.00 28.27 88,830 3,140 Unbonded Cap 3 3 09/18/2007 28 6.00 28.27 116,360 4,120 Cone/Split 3 4 09/18/2007 28 6.00 28.27 111,750 3,950 Cone/Split Average 4,030 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (DMILB) Page 3 of 5 Rone Engineering . Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 296270 Project No.: 0712786 Date of Service: 08/21/2007 Report Date: 09/20/2007 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Constructors & Associates Concrete Supplier: Redi Mix Plant: 88 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Batch time: 09:48am Concrete: 900F Ticket No: 88053415 Unit Weight (pct): NA Measured Slump (inches) 5.5 Mix Design 1.0.: 23601524 Placement Date: 08/21/2007 Weather Conditions: Clear Time Sampled: 1 0:40am Temperature - Air: 810F Truck No: 1342 Air Content: 5.3% Overall Placement Location: Paving, north 34 degrees, 23', 31" west to 42 degrees, 29' 8" west, pg C2.01 grading plan south Sample Location: Same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 4 1 08/24/2007 3 6.00 28.27 71,250 2,520 Unbonded Cap 4 2 08/28/2007 7 6.00 28.27 89,920 3,180 Unbonded Cap 4 3 09/18/2007 ~8 6.00 28.27 114,810 4,060 Cone/Split 4 4 09/18/2007 28 6.00 28.27 108,750 3,850 Cone/Split Average 3,950 Remarks: Water added at site: 15 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (DM/LS) Page 4 of 5