Loading...
Duke Lesley 2A-LR070924 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Cancellation Report No.: 298269 Project No.: 0712932 Date of Service: 09/10/2007 Report Date: 09/24/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Drilled Pier Inspection Cancellation Report of Cancellation On this date a Rone Engineering Services, Ltd. representative arrived on site as scheduled. Upon arrival, our representative was informed that testing/inspection was cancelled for the day. Technician: Chris Harbour Started: 05:45am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Finished: 07:45am Rone Engineering p~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/JB) Page 1 of 1 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 299334 Project No.: 0712932 Date of Service: 09/20/2007 Report Date: 09/24/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Straight Shaft Pier Inspection Report of Inspection D '11 A rl e r: UQ e r Pier Identification D /24 E /2 4 F /24 G /24 H /24 PierDiameter(in) 24 24 24 24 24 Depth of Pier From Surface (ft) 45.10 44.00 43.00 44.00 43.20 Depth of Bearing Stratum Fro m Surface(ft) 37.50 37.30 37.00 38.00 38.00 Required Penetration (ft) 5.00 5.00 5.00 5.00 5.00 Actual Penetration (ft)" 7.60 6.70 6.00 6.00 5.20 Condition of Bottom (wet/dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes I no) Yes Yes Yes Yes Yes Casing Diameter(in)/Casing Length (ft) 26/37.5 26/37.3 2 6 /3 7 26/37.5 2 6/3 8 NumberofBars IReinforcing BarSize 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6 Length of Reinforcing Steel (ft) 43.90 42.80 41.70 42.80 42.00 Time Drilling was Completed (am Ipm) 8 :2 0 AM 8:50 AM 9:30 AM 10:00 AM 11:03AM Time Concrete was Placed (am Ipm) 9:10 AM 9:55 AM 1 0 :4 5 AM 11:10AM 1 1 :40 A M Depth of Pier From Top of Concrete (ft) 44.60 43.50 42.50 43.50 42.70 Elevation: Surface (ft).. 98.50 98.50 98.50 98.50 98.50 Elevation: Top of Pier (ft).. 98.00 98.00 98.00 98.00 98.00 Elevation: Bottom of Pier (ft).. 53.40 54.50 55.50 54.50 55.30 E Ie va ti 0 n : Top of Bearing Stratum (ft. )" 6 1 .00 61 .20 61 .50 60.50 60.50 BearinQ Stratum (description) B lu e s h a Ie Note:See report# NA forCompressive StrengthTestSpecimens. . Additional Penetration not requested unless noted. "Elevation by others LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CHIKW) Page 1 of 3 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 299334 Project No.: 0712932 Date of Service: 09/20/2007 Report Date: 09/24/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Straight Shaft Pier Inspection D ri lie r: Auger Pie rid e ntifica tio n H 12 5 G 12 5 F 12 5 E 12 5 D 125 PierDiameterlin) 24 24 24 24 24 Deoth of Pier From S u rfa c e 1ft) 42.70 42.60 45.30 43.00 42.80 Deoth of Bear in a Stratum Fro m S urfa ce 1ft) 37.00 37.00 39.40 38.00 37.30 Reauired Penetration (ft) 5.00 5.00 5.00 5.00 5.00 Actual Penetration (ft)' 5.70 5.60 5.90 5.00 5.50 Condition of Bottom (wet/drv) D rv D rv D rv D rv D rv Plumb Within Tolerance Ives Ino) Yes Yes Yes Yes Yes Casina Diameterlin)/Casina Lenoth 1ft) 26/37 26/37 2 6/3 9 2 6 13 7 .4 26/37 NumberofBars IReinforcina BarSize 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6 Len 0 th 0 f Rei n fo rc i noS te e I 1ft) 41 .60 41.40 44.20 41.80 41 .60 Time Drillina was Completed (am Ipm) 11:50AM 1:10 PM 1 :55 PM 2 :3 5 P M 3:00PM Time Concrete was Placed (am 10m) 1 :00 P M 1 :40 PM 2 :30 PM 3 :0 0 P M 3:50 PM Deoth of Pier From Top of Concrete (ft) 42.20 42.10 44.80 42.50 42.30 Elevation: Surface (ft).. 98.50 98.50 98.50 98.50 98.50 Elevation:Too ofPier(ft).. 98.00 98.00 98.00 98.00 98.00 E Ie va tio n: Bolio m 0 f P ie rift).. 55.80 55.90 53.20 55.50 55.70 Elevation: To 0 0 f Be a rino S tra tum (fty' 61.50 61.50 59.1 0 60.50 61.20 Bearino Stratum (descriotion) B lu e s h a Ie Note: See report # NA to reo m pre s s ive S t re n 9 t h T est S pee i men s . .. Additional Penetration not requested unless noted. HE levation by others LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the dients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 2 of 3 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 299334 Project No.: 0712932 Date of Service: 09/20/2007 Report Date: 09/24/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Straight Shaft Pier Inspection D rille r: A Uq e r Pie r Id e n ti fi c a ti 0 n D 126 E 12 6 F 126 PierDiameter(in) 24 24 24 D e p th 0 f Pie r Fro m S u rfa c e (ft) 45.20 44.30 43.70 Depth ofBearinq Stratum Fro m Surface(ft) 38.00 39.00 38.50 Required Penetration (ft) 5.00 5.00 5.00 Actual Penetration (ft)" 7.20 5.30 5.20 Condition of Bottom (wet 1 dry) Dry Dry Dry Plumb Within Tolerance (yes Ino) Yes Yes Yes Casinq Diameter(in)/Casinq Lenqth (ft) 26/38 26/39 26/38.5 NumberofBars IReinforcing BarSize 6 1 #6 6 1 #6 6 1 #6 Length of Reinforcing Steel (ft) 44.10 43.10 42.50 Time Drilling was Completed (am Ipm) 4:10 PM 3 :58 PM 4:55 PM Tim e Con c re te was P la c e d (a m 1 pm) 4 :30 PM 5:00PM 5 :2 0 P M Depth of Pier From Top of Concrete (ft) 44.70 43.80 43.20 E Ie va ti 0 n: S u rfa c e (ft)"" 98.50 98.50 98.50 E Ie va ti 0 n: Top 0 f Pie r (ft)" 9 8 .00 9 8.00 98.00 E Ie va ti 0 n: Bot tom 0 f Pie r (ft).. 53.30 54.20 54.80 E Ie va ti 0 n : Top of Bearing Stratum (ft.)" 60.50 59.50 60.00 Bearinq Stratum (description) Blue shale Not e: See re port # NA fo reo m pre s s ive S tre n 9 th Test S pecim ens. . Additional Penetration not requested un Ie s s not e d . HE levation by others Technician: Chris Harbour Started: 05:45am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Finished: 05:45pm Rone Engineering P-~ :~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 3 of 3