Loading...
Duke Lesley 2A-LR070922 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 299394 Project No.: 0712932 Date of Service: 09/20/2007 Report Date: 09/22/2007 Project: Hemisphere's at Point West Cappell, Texas Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Building pad, slab on grade, grid lines A.1-C/11-21. nem s Inspected: Co nfo rm ing Non Items Inspected: Co nfo rm ing Non Items Inspected: Conforming Non Co nfo rm ing Co nfo rm ing Co nfo rm ing Placing Drawings Bar Length Column Ties Properly Approved x and Shape x Tied and Spaced NA B af Size x Pro per B ar P lacem ent x Stirrup Spacing NA Bar Grade x Pro perly Tied x Stirrup Type NA Bars Clean x Dowel Bars in Place x Lapped Splices x Form Clean x Pro per Bar Suppa rts NA Corner Bars NA Numberof Bars x Pro per Cover NA Mechanical Splices NA Discrepancies / Comments: 1. Chairs to be added during concrete placement. Technician: Chris Harbour Rone Engineering See Report 299334 for technician time~ ~ Report Distribution: . ~. . ". Orig: Duke Construction, LP (Dallas, TX) Artn: Mr. Paul Byrne . ..' . . . (1-ec copy) '. . 1-cc City of Coppell Attn: Mr. Lee Stone K Scott Watson AET 1-cc City of Coppell Attn: Mr. Larry Davis . Project Manager ~ LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 1 of 1 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 299260 Project No.: 0712932 Date of Service: 09/19/2007 Report Date: 09/22/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Building pad, slab on grade, grid lines J-K.9/11-21. Item s Inspected: Co nfo rm ing Non Item s Inspected: Conforming Non Item sins pected: Conforming Non Confonming Conforming Co nfo rming P lacing Drawings Bar Length Co lum n Ties Pro perly Appro ved x and Shape x Tied and Spaced NA Bar Size x Pro per Bar P lacem ent x Stirrup Spacing NA Bar Grade x Pro perly Tied x Stirrup Type NA Bars Clean x Dowel Bars in Place x Lapped Splices x Form Clean x P roper Bar Suppa rts NA Corner Bars NA Numberof Bars x ProperCover NA Mechanical Splices NA Discrepancies / Comments: 1. Chairs to be added during concrete placement. Technician: Chris Harbour Rone Engineering S"'R'Port299157fo'toclm;'i,"lime~.... ...... ~.' ........ '.' . Paul Byrne .' ~ K. Scott Watson, AET Project Manager ~ Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Altn: Mr. (1-ec copy) 1-cc City of Coppell Altn: Mr. Lee Stone 1-cc City of Coppell Altn: Mr. Larry Davis LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 1 of 1