Loading...
Duke Lesley 2A-LR070921 Rone Engineering .. 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 299273 Project No.: 0712932 Date of Service: 09/19/2007 Report Date: 09/21/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Perform In-Place Density Testing PROJECT DATA Contractor: Duke Construction, LP Test Method: ASTM D-6938 Gauge: Troxler 3430 Gauge Serial No: 35518 Test Mode: DT Standard Counts Moisture Density Current: 740 Current: 2496 Previous: 739 Previous: 2505 MOISTURE DENSITY RELATIONS Test Location Maximum Moisture Density Project Requirements % (pet) Moisture Density 22.5 96.5 Optimum +4 95 min FIELD DENSITY TESTS Probe MID Moisture Wet Density Dry Density Density Depth No. % (pet) (pet) (%max) 6" 272998 25.7 120.3 95.7 99 6" 272998 25.8 116.2 92.4 96 6" 272998 23.4 117.8 95.5 99 6" 272998 22.6 117.7 96.0 100 MID No. 272998 Description Brown I Silty Clay wI Organics Test No Utility backfill 1 Storm drains SO, 3C, Station 0+50, 3' below grade Utility backfill 2 Storm drains SO, 3C, Station 0+50, 2' below grade Utility backfill 3 Storm drains SO, 3C, Station 0+50, l' below grade Utility backfill 4 Storm drains SO, 3C, Station 0+50, final Technician: Joe Jernigan Started: 01 :OOpm Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Artn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Artn: Mr. Lee Stone 1-cc City of Coppell Artn: Mr. Larry Davis Finished: 02:15pm Rone Engineering P-~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 1 of 1 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 299157 Project No.: 0712932 Date of Service: 09/19/2007 Report Date: 09/21/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Straight Shaft Pier Inspection Report of Inspection D ri lie r: Auger Pier Identification H /21 G /21 F /21 E /21 D /21 Pie r 0 i a mete r (i n) 24 24 24 24 24 Deoth of Pier From Surface (ft) 44.80 43.70 44.00 42.30 42.50 Deoth of Bear in a Stratum Fro m S u rfa c e (ft) 38.00 37.80 38.50 37.00 37.20 Reauired Penetration (ft) 5.00 5.00 5.00 5.00 5.00 Actual Penetration (ft). 6.80 5.90 5.50 5.30 5.30 Condition of Bottom (wet/drv) D rv Dry D rv D rv Dry Plumb Within Tolerance (ves /no) Yes Yes Yes Yes Yes Casina Diameter(in)/Casina Lenath (ft) 2 6 /3 7 2 6/37 .1 26/38.5 26/36.3 26/36.9 N u m b e r 0 f Bar s / Rei n fo r c i naB a r S i z e 6 / # 6 6 / #6 6 / #6 6 / #6 6 / #6 Lenath of Reinforcina Steel (ft) 43.60 42.50 42.90 41.20 41 .30 Time Drillina was Comnleted (am tom) 7 :5 5 AM 8:15 AM 8:30 AM 8:50 AM 9:30 AM Tim e Con c re te was Pia c e d (a m / 0 m ) 9 :00 AM 9:40 AM 1 0 :2 5 A M 11:00AM 11 :45 AM Deoth of Pier From Too of Concrete 1ft) 44.30 43.20 43.50 41.80 42.00 Elevation: Surface (ft).. 98.50 98.50 98.50 98.50 98.50 E Ie va tio n: To 0 of P ie r (ft).. 98.00 98.00 98.00 98.00 98.00 Elevation: Bottom of Pier (ft).. 53.70 54.80 54.50 56.20 56.00 Elevation: Too of Bear in a Stratum (ft.)" 60.50 60.70 60.00 61 .50 61 .30 Bearina Stratum (descriotion) Blue sha Ie Note: See report # NA for Com pressive Strength Test S pecim ens. ,. Additional Penetration not requested unless noted. HE levation by others LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 1 of 3 Rone Engineering .. 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 299157 Project No.: 0712932 Date of Service: 09/19/2007 Report Date: 09/21/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Straight Shaft Pier Inspection D rille r: A ug e r Pier Identification D /22 E /2 2 F /22 G /2 2 H /2 2 Pier Diameter (in) 24 24 24 24 24 De p th 0 f P ie r Fro m S urfa ce (ft) 43.20 44.70 46.00 42.80 42.50 Depth of Bearing Stratum Fro m Surface(ft) 38.00 38.50 40.50 37.00 37.00 Required Penetration (ft) 5.00 5.00 5.00 5.00 5.00 Actual Penetration (ft)' 5.20 6.20 5.50 5.80 5.50 Condition of Bottom (wet/dry) Dry Dry Dry D rv Dry Plumb Within Tolerance (yes /no) Yes Yes Yes Yes Yes C asina Diameter (in) / C asina LenQth (ft) 26/38 26/38.5 26/40.5 2 6/37 2 6 /3 7 NumberofBars /Reinforcing BarSize 6 / #6 6 / #6 6 / #6 6 / #6 6 / # 6 Lenqth of Reinforcina Steel (ft) 42.10 43.50 44.80 41.70 41.30 Time Drillina was Completed (am /pm) 10:18AM 10:50AM 11:35AM 12:15 PM 1:00 PM Time Concrete was Placed (am /pm) 12:15 PM 1 :00 PM 2 :0 0 P M 2 :40 P M 3 :2 5 P M Depth of Pier From Top of Concrete (ft) 42.70 44.20 45.50 42.30 42.00 Elevation: Surface (ft).. 98.50 98.50 98.50 98.50 98.50 Elevation: Top of Pier (ft).. 98.00 98.00 98.00 98.00 98.00 Elevation: Bottom ofPier(ft)" 5 5.30 53.80 52.50 55.70 56.00 E Ie va tio n: Top of Bear in a Stratum (ft. ) .. 60.50 60.00 58.00 61.50 61 .50 Bearina Stratum (description) Blue shale Not e: See re port # NA for Compressive Strength Test Specimens. ... Additional Penetration not requested unless noted. HE ievation by others LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 2 of 3 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 299157 Project No.: 0712932 Date of Service: 09/19/2007 Report Date: 09/21/2007 Project: Hemisphere's at Point West Cappell, Texas Services: Straight Shaft Pier Inspection D rille r: Auqer Pie rid e ntifica tio n H 12 3 G 12 3 F 12 3 E 12 3 D 123 PierDiameter(in) 24 24 24 24 24 Depth of Pier From Surface(ft) 42.00 43.00 43.1 0 42.20 42.50 Depth ofBearinq Stratum Fro m S u rfa c e (ft) 37.00 38.00 37.50 37.00 37.00 R e q uired P e ne tra tio n (ft) 5.00 5.00 5.00 5.00 5.00 Actual Penetration (ft)' 5.00 5.00 5.60 5.20 5.50 Condition of Bottom (wet 1 dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes Ino) Yes Yes Yes Yes Yes Casing D iam eter (in) 1 C asinq Length (ft) 26/37 26/38 26/37.5 2 6 13 7 26/37 NumberofBars IReinforcing BarSize 6 1 #6 6 1 # 6 6 1 #6 6 1 #6 6 1 #6 Length of Reinforcing Steel (ft) 40.80 41.90 42.00 41 .00 41.20 Time Drillinq was Completed (am Ipm) 1 :20 PM 1 :20 PM 2 :30 PM 3 :0 0 PM 3:35 PM Tim e Con c re te was P la c e d (a m 1 pm) 3:50 PM 4 :15 PM 4:30 PM 4:50 PM D e p th 0 f Pie r Fro m Top 0 f Con c re te (ft) 41.50 42.50 42.60 41 .70 42.00 Elevation: Surface (ft)** 98.50 98.50 98.50 98.50 98.50 Elevation:Top of Pier (ft)** 98.00 98.00 98.00 98.00 98.00 E Ie va ti 0 n: Botto m 0 f Pie r (ft)" 56.50 55.50 55.40 56.30 56.00 Elevation: Top of Bearing Stratum (ft.) ** 61.50 60.50 61.00 61 .50 61.50 Bearing Stratum (description) Blue sha Ie Note: See report # NA for Com pressive Strength Test Specim ens. * Additional Penetration not requested unless noted HE levation by others Technician: Chris Harbour Started: 06:00am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Altn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Altn: Mr. Lee Stone 1-cc City of Coppell Altn: Mr. Larry Davis Finished: 06:15pm Rone Engineering p-~.~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CHfKW) Page 3 of 3