Duke Lesley 2A-LR070920
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Reinforcing Steel Inspection
Report No.: 299107
Project No.: 0712932
Date of Service: 09/18/2007
Report Date: 09/20/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Reinforcing Steel Inspection
Report of Inspection
Locations and Items Inspected:
Building pad slab on grade, grid lines 1.1-11/A.1-C.
Item s Inspected: Co nfo rming Non Items Inspected: Co nfo rm ing Non Items Inspected: Conforming Non
Co nfo rming Co nfo rm Ing Co nfo rm ing
P lacing Drawings Bar Length Column Ties Properly
Appro ved x and Shape x Tied and Spaced NA
8 ar Size x Pro per Bar P laeem ent x Stirrup Spacing NA
8 ar Grade x Properly Tied x Stirrup Type NA
Bars Clean x Dowel Bars in Place x Lapped Splices x
Form Clean x Proper 8 ar Suppa rts NA Comer Bars NA
NumberofBars x ProperCover NA Mechanical Splices NA
Discrepancies / Comments:
1. Chairs to be added during placement.
Technician: Chris Harbour Rone Engineering
See Report 298977 for technician time~~
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne.. . .. '. .........
(1-ec copy)
1-cc City of Coppell Attn: Mr. Lee Stone K Scott Watson AET
1-cc City of Coppell Attn: Mr. Larry Davis . Project Manager
~
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMlKW) Page 1 of 1
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 296402
Project No.: 0712932
Date of Service: 08/22/2007
Report Date: 09/20/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 3,000 psi @ 28 days
Slump (in.): NA
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 7751PW
Placement Date: 08/22/2007
Weather Conditions: Overcast
Time Sampled: 01 :25pm
Temperature - Air: 980F
Truck No: 142
Air Content: 1.8%
Overall Placement Location:
Piers (see report #296401)
Batch time: 12:54pm
Concrete: 930F
Ticket No: 13125
Unit Weight (pet): NA
Measured
Slump
(inches)
5.5
Sample Location:
Pier 8/5
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
1 1 08/29/2007 7 6.00 28.27 99,160 3,510 Unbonded Cap
2 09/19/2007 28 6.00 28.27 117,660 4,160 Cone/Split
3 09/19/2007 28 6.00 28.27 113,840 4,030 Cone/Split
Average 4,090
1 4 10/17/2007 56
Technician: Chris Harbour Rone Engineering
See Report 296401 for technician time~ ~
Report Distribution: ~ ..---.....
0;" Do" CO"","",,,, LP (D."",, lX) All" MI. P,"' Bym' , . '. . . =--"
(1-ec copy) -
1-cc P~tter Concrete Attn: Mr. Ryan Skelly K. Scott Watson AET
1-cc City of Coppell Attn: Mr. Lee Stone p . t M '
1-cc City of Coppell Attn: Mr. Larry Davis roJec anager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/LB) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 298977
Project No.: 0712932
Date of Service: 09/18/2007
Report Date: 09/20/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
Report of Inspection
D '11
A
rI e r: ug e r
Pier Identification D 1 8 E 1 8 F 1 8 G 1 8 H18
PierDiameter(in) 24 24 24 24 24
Depth of Pier From Surface (ft) 44.20 43.50 43.20 44.10 43.60
Depth of Bearing Stratum Fro m Surface(ft) 38.00 37.20 37.60 38.00 37.70
Required Penetration (ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft)* 6.20 6.30 5.60 6.10 5.90
Condition of Bottom (wet/dry) D rv Dry D rv Dry Dry
Plumb Within Tolerance (ves / no) Yes Yes Yes Ve s Yes
Casinq Diameter(in)/Casinq Lenqth (ft) 2 6 /3 8 26/36.8 2 6 /3 7 2 6 /3 8 26/37.3
NumberofBars /Reinforcing BarSize 6 / #6 6 / #6 6 / #6 6 / #6 6 / # 6
Length of Reinforcina Steel (ft) 43.00 42.20 41.90 42.90 42.30
Time Drillinq was Completed (am /pm) 8:25 AM 8:00 AM 9:15 AM 9:45 AM 10:06 AM
Time Concrete was Placed (am /pm) 10:05 AM 9 :2 5 AM 10:30 AM 11:05AM 11:50AM
Depth of Pier From Top of Concrete (ft) 43.70 43.00 42.70 43.60 43.10
E Ie va ti 0 n: S u rfa c e (ft) ** 98.50 98.50 98.50 98.50 98.50
E Ie va ti 0 n: Top 0 f Pie r (ft) ** 98.00 98.00 98.00 98.00 98.00
Elevation: Bottom of Pier (ft)** 54.30 55.00 55.30 54.40 54.90
E Ie va ti 0 n : Top of Bearing Stratum (ft.)** 60.50 61 .30 60.90 60.50 60.80
Bearinq Stratum (description) Blue shale
Note:See report# NA forCompressive StrengthTestSpecimens.
* Additional Penetration not requested unless noted. **Elevation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 3
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 298977
Project No.: 0712932
Date of Service: 09/18/2007
Report Date: 09/20/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
D ri lie r: Auger
Pie r Id e ntific a tio n H19 G 1 9 F19 E19 D 19
Pie r D i a mete r (i n) 24 24 24 24 24
D eo th 0 f P ie r F ro m S u rfa c e (ft) 43.60 42.00 41.80 42.90 42.90
Deoth of Bear in a Stratum Fro m S u rfa c e (ft) 38.1 0 37.00 36.50 37.10 37.50
Reauired Penetration (ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft)' 5.50 5.00 5.30 5.80 5.40
Condition of Bottom (wet/dry) D rv D rv D rv D rv Dry
Plumb Within Tolerance (ves Ino) Yes Yes Yes Yes Yes
Casing Diameter(inl/Casina Lenath (ft) 26/37.7 2 6 13 7 26/36.5 2 6 13 7 26/36.7
NumberofBars IReinforcina BarSize 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6
Lenath of Reinforcina Steel (ft) 42.30 40.70 40.60 41.80 41 .70
Time Drillina was Comoleted (am Ipm) 10:55AM 1 1 :40 AM 12:15 PM 1:20 PM 1 :50 PM
Tim e Con c re te was P la c e d (a miD m \ 12:10 PM 12 :52 PM 1 :22 PM 2:10 PM 3:00 PM
Deoth of Pier From Top of Cone rete (ft) 43.1 0 41 .50 41.30 42.40 42.40
Elevation: Surface (ft)'. 98.50 98.50 98.50 98.50 98.50
Elevation: Top of Pier (ft)" 9 8.00 98.00 98.00 98.00 98.00
Elevation: Bottom of Pier (fl)" 5 4.90 56.50 56.70 55.60 55.60
Elevation: To p of Be a rina S tra tum (fty' 60.40 61 .50 62.00 61.40 61 .00
Bearina Stratum (description) B lu e s h a Ie
Note: See re port # NA for Compressive Strength Test Specimens.
'Additional Penetration not requested unless noted. ....E levation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 2 of 3
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 298977
Project No.: 0712932
Date of Service: 09/18/2007
Report Date: 09/20/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
o rille r: Auger
Pie r Id e n ti fi c a ti 0 n 020 E20 F20 G 2 0 H2O
Pie r 0 i a mete r (i n) 24 24 24 24 24
D e p th 0 f Pie r Fro m S u rfa c e (ft) 42.10 42.50 42.00 44.60 43.50
Depth of Bearing Stratum Fro m Surface(ft) 37.10 36.90 37.00 38.50 37.60
R e quire d P e netra tio n (ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft)" 5.00 5.60 5.00 6.10 5.90
Con d iti 0 n 0 f B 0 tlo m (wet 1 dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (ves fno) Yes Yes Yes Yes Yes
Casing Diameter(in)fCasing Length (ft) 26/37 2 6 f3 6 .9 26/37 26/38.5 26/37.5
NumberofBars IReinforcing BarSize 6 1 #6 6 1 #6 6 1 #6 6 1 #6 6 1 #6
Length of Reinforcing Steel (ft) 40.90 41.30 40.70 43.30 42.20
Time Orillina was Completed (am fpm) 2 :15 PM 2:35 PM 2 :50 PM 3:20 PM 3:55 PM
Time Concrete was Placed (am fpm) 3 :50 PM 4:15 PM 4 :50 PM 5:10 PM 5:30 PM
Depth of Pier From Top of Cone rete (ft) 41.60 42.00 41.50 44.10 43.00
Elevation: Surface (ft)** 98.50 98.50 98.50 98.50 98.50
Elevation: Top of Pier (ft)** 98.00 98.00 98.00 98.00 98.00
Elevation: Bottom of Pier (ft)** 56.40 56.00 56.50 53.90 55.00
Elevation: Top of Bearing Stratum (ft.)** 61.40 61 .60 61 .50 60.00 60.90
Bearing Stratum (description) B lu e s h a Ie
Note: See report # NA for Compressive Strength Test Specimens.
"Additionai Penetration not requested unles s noted. ""E levation by others
Technician: Chris Harbour Started: 05: 15am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Altn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppel! Altn: Mr. Lee Stone
1-cc City of Coppel! Altn: Mr. Larry Davis
Finished: 05:45pm Rone Engineering
p~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CHfKW) Page 3 of 3
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 298198
Project No.: 0712932
Date of Service: 09/08/2007
Report Date: 09/20/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter
Plant: 01
Specification Requirements
Strength: 3,000 psi @ 28 days
Slump (in.): NA
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 7751 PW
Placement Date: 09/08/2007
Weather Conditions: Partly cloudy
Time Sampled: 02:05pm Batch time: 01 :34pm
Temperature - Air: 880F Concrete: 930F
Truck No: 132 Ticket No: 13428
Air Content: NA Unit Weight (pef): NA
Overall Placement Location:
Building piers K/28, 29, J/27-29, U22-25, B/22-25
Measured
Slump
(inches)
6.75
Sample Location:
Building pier B124
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 09/15/2007 7 6.00 28.27 87,730 3,100 Shear
1 2 09/15/2007 7 6.00 28.27 88,520 3,130 Shear
Average 3,120
3 10/06/2007 28
4 10/06/2007 28
1 5 11/03/2007 56
Technician: Chris Harbour Rone Engineering
See Report 298197 for technician timePz~
Report Distribution: ..---.....
Orig: ~~~ ~oop:~truction, LP (Dallas, TX) Alln: Mr. Paul Byrne . .. ..... .... ....~
1-cc P~ller Concrete Alln: Mr. Ryan Skelly K. Scott Watson, AET
1-cc CIty of Coppell Alln: Mr. Lee Stone. Project Manager
1-cc City of Coppell Alln: Mr. Larry DavIs
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written appnoval of Rone Engineering Services, Ltd.
(JB/JB) Page 1 of 1