Loading...
ST9905DR-CS070910 PAVING COMPANY P.O. Box 270040 Dallas. Texas 75227-0040 Telephone (972) 289-0723 Fax (972) 216-5637 September 10, 2007 City of Coppell 255 Parkway Coppell, Texas 78019 Attn: Keith Marvin, P .E. Re: Bethel Road ST 99-05 Changes to Line "D" Mr. Marvin, Please review the following costs due to changes with Storm Drain Line "D". We propose boring a temporary 12" PVC temporary drain pipe under the existing pavement at each lateral crossing in order to maintain drainage in Phase I and minimize the impact on traffic. RCP will be placed from the edge of existing pavement to the proposed inlets on the north side. In phase 2 the temporary PVC drain pipe will be removed and the RCP will be tied into the box culvert as shown on the revised plan sheets. There will also be a restocking fee due to Johnson County Pipe for the RCP already on site. Additional Staking Bore Under Existing Street Rock & Dig Receiving Pit 12" SDR 35 Temporary Drain Pipe Connect RCP to Box Culvert Restocking Fee for Unused RCP 5.0 EA@ 250.00 = 1,250.00 200.0 LF @ 125.00 = 25,000.00 5.0 EA @ 1,200.00 = 6,000.00 200.0 LF @ 25.00 = 5,000.00 5.0 EA @ 800.00 = 4,000.00 1.0 LS @ 6,072.00 = 6,072.00 If you have any questions please call me at 972-289-0723 Sincerely, /J ' "" ~ j, IvJ ~eJt 1- _? hv vd J (' o'^ ({v '; & (::-/. r; tf\ 4' 1101&>) :i~~ Lance Smith Project Administrator ~Id 1974