Loading...
DR9001-CS 901127The City With A Beautiful Future PRE-CONSTRUCTION PA~2KET P.O. Box 478 Coppell, Texas 75019 214 - 462 - 0022 PROJECT NAME: C,~ ~4~/F/.~/_~,,,~,~ A'ri'~NDANCE SHEET COMPANY: PHONE: (i) ,~ CITY OF COPPW. T.L PRE-CONSTRUCTION CONFERENCE PROJECT NA~: DATE: ASSIGNED INSPECTOR: I. RI"r~NDANCE: II. PLANS FURNISHED TO: (See AttJched List) A) CITY B ) CONTRACTOR C) OWNER III. UTILITY COMPANIES NOTIFIED: IV. YES A) TELEPHONE B) GAS C ) ELECTRIC D) CABLE T.V. E ) OTHER STATUS OF RIGHT-OF-WAY AND/OR LAND ~NTS: HIG}{4AY PERMIT YES RAILROAD PERMIT YES STREET CUT PERMIT YES BORING PERMIT YES INSPECTION: A. B. DAILY INSPECTION BY ASSIGNED INSPECTOR A~'i%R HOURS AND W~F.k'ENDS (OVERTIME) TO BE PAID BY THE CONTRACTOR "AT OVERTI~d~ CONTRACTOR AND SUB-CONTRACTORS TO NOTIFY INSPECTOR AT LEAST TWENTY-FOUR (24) HOURS BEFORE WATER/SANITARY SEWER/STORM Sl~_J{/ PAVING CCNSTRUCTION BEGINS. (2) VI. TESTING OF MATERIALS: ~. DENSITIES .~n~APPROVED CONCRETE BATCH DESIGN ~ CONCRETE PAVING INCLUDING CORES 4. APPROVED ASPHALT BATCH DESI(~N SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR STREET CLOSING REQUIRED: YES IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE AND FIRE DEPART~N~f SEVENTY-%%{O (72) HOURS IN ADVANCE. VIII. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL: ~ REQUIRED B. TRAFFIC DETOUR C. WARNING LIGHTS IF STREET DEPARTS~/NT HAS TO CC~E OUT TO MOVE THE BARRICADES AND/OR REPLACE ANY BARRICADES, THE CONTRACTOR WILL BE CHARGED FOR THEIR TI~. IX. Xo AS-BUILT PLANS: CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR SUBMIT~flNG THE CORRECT "AS-BUILT" PLANS TO THE CITY. INFORMATION: DEVELOPER: NAME: ADDRESS: PHONE: PROJECT MANAGER: CCNSULTING ENGINEER: NA~: ADDRESS: PHONE: PROJECT ENGINEER: (3)