Loading...
DR9001-CS 901120DATE: TO: FBOM: RE: COPPELL PUBLIC WORKS MEMORANDUM November 20, 1990 Steve Goram, Director of Public Works Acting City Engine~~_.j. Shohre Daneshmand, Connell/Skaggs Drainage/Woodside Village (Tickler 11/30/90) Attached please find a copy of Ginn's response concerning Hinckley,s drainage easement documents. As stated in the letter, Ginn, Inc. confirms what Connell's Engineer has indicated and that Hinckley's tract line is as highlighted in attached sketch. Please note that the only other way to be sure of this matter is for City to conduct a survey independently and the City be reimbursed by affected property owner(s). The estimated cost for such survey is $3,000.00, and according to Ginn, Inc. this is the only way to get a final determination. Staff also has concerns regarding Hinckley,s stipulations made as part of dedicating the easement. Please let me know if you have any questions. Next check dates November 30, 1990. MSD/dg cc~ CONNELL2.msd Larry Davis, Construction Inspector