DR9001-CS 901113 (2)COPPELL PUBLIC WORKS
MEMORANDUM
November 13, 1990
Steve Goram, Director of Public Works
M. Shohr ~~and, A. cting City Engineer
Larry Da~p~nstructlon Inspector
Connell/Skaggs Drainage/Woodside village
(Tickler 11-16-90)
As requested, Mr. Jim Koch with Pacheco Koch Co. is submitting six
(6) sets of construction plans for final approval and stamping on
this date.
Also, a meeting with each resident on Shadowdale, to discuss the
construction of the proposed drainage project, is being scheduled
before the contractor begins construction.
The preconstruction meeting is scheduled for Tuesday, November 27,
1990 at 2~30 p.m., as requested from the project engineer.
If I can be of further assistance, please let me know.
Next Check Dates November 30, 1990
LCD/bd
CONNELL.LCD