Loading...
Duke Lesley 3C-LR071003 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 297758 Project No.: 0711530 Date of Service: 09/04/2007 Report Date: 10/03/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" - 7" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7751 PW Placement Date: 09/04/2007 Weather Conditions: Cloudy Time Sampled: 10:50am Temperature - Air: 800F Truck No: 106 Air Content: NA Overall Placement Location: Pier Station C.9/9.9 Batch time: 10:09am Concrete: 860F Ticket No: 13290 Unit Weight (pcf): NA Measured Slump (inches) 7.0 Sample Location: Grid line C.9/9.9 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 1 1 09/11/2007 7 6.00 28.27 105,900 3,750 Shear 1 2 10/02/2007 28 6.00 28.27 133,400 4,720 Cone/Split 1 3 10/02/2007 28 6.00 28.27 136,080 4,810 Cone/Split Average 4,770 4 10/30/2007 56 Technician: . Denny Harris Rone Engineering See Report 297757 for technician time~~ Report Distribution: O"l' ~~~ :::';,~truct;oo, LP (0,,,",, 1X) Att" M' P,"' .,m' , '. ~ - u.' - -= - - 1-cc P~tter Concrete Attn: Mr Ryan Skelly K. Scott Watson, AET 1-cc City of Coppell Attn: Mr Lee Stone Project Manager 1-cc City of Coppell Attn: Mr Larry Davis ~ LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (JB/LB) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 297519 Project No.: 0711530 Date of Service: 08/31/2007 Report Date: 10/03/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" - 7" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7751 PW Placement Date: 08/31/2007 Weather Conditions: Sunny Time Sampled: 02:00pm Temperature - Air: 960F Truck No: 119 Air Content: NA Overall Placement Location: Piers (see report #297518) Batch time: 01 :28pm Concrete: 960F Ticket No: 13879 Unit Weight (pet): NA Measured Slump (inches) 7.0 Sample Location: Pier AJ1 0 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 09/07/2007 7 6.00 28.27 88,440 3,130 Cone/Shear 1 2 09/28/2007 28 6.00 28.27 123,330 4,360 Cone/Split 1 3 09/28/2007 28 6.00 28.27 120,004 4,240 Cone/Split Average 4,300 -"!" 4 1 0/26/2007 56 Technician: Denny Harris Rone Engineering Report Distribution: seeReport297518forteChniCiantime~.... . .... ~" . ...... . Orig: Duke Construction. LP (Dallas, TX) Attn: Mr. Paul Byrne .. # ..~ . (1-ec copy) 1-cc Potter Concrete Attn: Mr. Ryan Skelly K. Scott Watson, AET 1-cc City of Coppell Attn: Mr. Lee Stone Project Manager 1-cc City of Coppell Attn: Mr. Larry Davis ~ LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 297380 Project No.: 0711530 Date of Service: 08/30/2007 Report Date: 10/03/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" - 7" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7751 PW Placement Date: 08/30/2007 Weather Conditions: Sunny Time Sampled: 12:50pm Temperature - Air: 960F Truck No: 109 Air Content: NA Overall Placement Location: Piers, Station A/15 (see report #297379) Batch time: 12:22pm Concrete: 940F Ticket No: 13261 Unit Weight (pet): NA Measured Slump (inches) 7.0 Sample Location: Same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 09/06/2007 7 6.00 28.27 101,970 3,610 Cone/Split 2 09/27/2007 28 6.00 28.27 133,620 4,730 Cone/Split 3 09/27/2007 28 6.00 28.27 135,160 4,780 Shear Average 4,750 4 10/25/2007 56 Technician: Denny Harris Rone Engineering See Report 297379 for technician time~~ Report Distribution: Orig: ~~:~ ;oop~~truction, LP (Dallas, TX) Altn: Mr. Paul Byrne . . , '. , '. '.' .' , 1-cc Polter Concrete Altn: Mr. Ryan Skelly K. Scott Watson, AET 1-cc City of Coppell Altn: Mr. Lee Stone Pro'eet Manager 1-cc City of Cappel! Altn: Mr. Larry Davis I :::;> LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/LB) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 297226 Project No.: 0711530 Date of Service: 08/29/2007 Report Date: 10/03/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" - 7" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7751 PW Placement Date: 08/29/2007 Weather Conditions: Sunny Time Sampled: 10:25am Temperature - Air: 960F Truck No: 117 Air Content: NA Overall Placement Location: Grid lines 0.9/18 Batch time: 09:43am Concrete: 940F Ticket No: 13236 Unit Weight (pet): NA Measured Slump (inches) 4.0 Sample Location: Grid lines 0.9/18 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (inZ) (Ibs) (psi) Type 1 1 09/05/2007 7 6.00 28.27 91,160 3,220 Cone/Split 1 2 09/26/2007 28 6.00 28.27 128,650 4,550 Cone/Split 1 3 09/26/2007 28 6.00 28.27 126,010 4,460 Cone/Split Average 4,500 4 10/24/2007 56 " .t Technician: Denny Harris Rone Engineering See Report 297225 for technician time~~ Report Distribution: . . Orig:~~~~~Oo;y~truction,LP(DallaS,TX)Alln:Mr.paUIByrne .... . . . .. . ........ .... . .' 1-cc Poller Concrete Alln: Mr. Ryan Skelly K. Scott Watson AET 1-cc City of Coppell Alln: Mr. Lee Stone p . ct M ' 1-cc City of Coppell Alln: Mr. Larry Davis rOJe anager ~ LIMITATIONS The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlLB) Page 1 of 1 . Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 299178 Project No.: 0711530 Date of Service: 09/19/2007 Report Date: 10/03/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Req u i rements Strength: 4,000 psi @ 28 days Slump (in.): 5" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7752 PW Placement Date: 09/19/2007 Weather Conditions: Cloudy Time Sampled: 03:10am Temperature - Air: 760F Truck No: 110 Air Content: NA Overall Placement Location: Seltline Road I Highway 635 Sample Location: South section-southeast corner, section 1 REPORT OF TESTS Batch time: 03:03am Concrete: 800F Ticket No: 7420 Unit Weight (pcf): NA Measured Slump (inches) 5.0 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 74,520 Cylinder Marked Date Set No. Tested 1 1 09/26/2007 1 2 10/17/2007 1 3 10/17/2007 1 4 11/14/2007 Age (days) 7 Diameter (in) 6.00 28 28 56 Area (in') 28.27 Compressive Strength (psi) 2,640 Fracture Type Cone/Split LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CHILB) Page 1 of 8 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 299178 Project No.: 0711530 Date of Service: 09/19/2007 Report Date: 10/03/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 5" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7752 PW Placement Date: 09/19/2007 Weather Conditions: Cloudy Time Sampled: 04:00am Temperature - Air: 760F Truck No: 138 Air Content: NA Overall Placement Location: Beltline Road / Highway 635 Sample Location: South section-center, section 1 REPORT OF TESTS Batch time: 03:42am Concrete: 800F Ticket No: 7425 Unit Weight (pct): NA Measured Slump (inches) 5.0 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 73,690 Cylinder Marked Date Set No. Tested 2 1 09/26/2007 2 2 10/17/2007 2 3 10/17/2007 ~. 4 11/14/2007 "- Age (days) 7 Diameter (in) 6.00 28 28 56 Area (in') 28.27 Compressive Strength (psi) 2,610 Fracture Type Cone/Split LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 2 of 8 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630.9745 Report of Concrete Compressive Strength Test Report No.: 299178 Project No.: 0711530 Date of Service: 09/19/2007 Report Date: 10/03/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 5" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTMC-39 PROJECT DATA Mix Design 1.0.: 7752 PW Placement Date: 09/19/2007 Weather Conditions: Cloudy Time Sampled: 05:00am Temperature - Air: 760F Truck No: 109 Air Content: NA Overall Placement Location: Beltline Road I Highway 635 Batch time: 04:51am Concrete: 800F Ticket No: 7437 Unit Weight (pcf): NA Measured Slump (inches) 5.0 Sample Location: South section-southwest corner, section 2 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (lbs) (psi) Type 3 1 09/26/2007 7 6.00 28.27 76,190 2,690 Cone/Split 3 2 10/17/2007 28 3 3 10/17/2007 28 3 4 11/~/2007 56 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 3 of 8 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 299178 Project No.: 0711530 Date of Service: 09/19/2007 Report Date: 10/03/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 5" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7752 PW Placement Date: 09/19/2007 Weather Conditions: Cloudy Time Sampled: 06: 15am Temperature - Air: 780F Truck No: 109 Air Content: NA Overall Placement Location: Bellline Road I Highway 635 Batch time: 06:05am Concrete: 820F Ticket No: 7447 Unit Weight (pct): NA Measured Slump (inches) 5.0 Sample Location: South section-southeast corner, section 2 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 4 1 09/26/2007 7 6.00 28.27 95,000 3,360 Cone/Split 4 2 10/17/2007 28 4 3 10/17/2007 28 ,~~ 4 . '4 11/14/2007 56 os;. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 4 of 8 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 299178 Project No.: 0711530 Date of Service: 09/19/2007 Report Date: 10/03/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 5" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7752 PW Placement Date: 09/19/2007 Weather Conditions: Cloudy Time Sampled: 08:00am Temperature - Air: 780F Truck No: 110 Air Content: NA Overall Placement Location: Beltline Road I Highway 635 Batch time: 07:51am Concrete: 830F Ticket No: 7457 Unit Weight (pcf): NA Measured Slump (inches) 5.0 Sample Location: Center section-center, 3rd section REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 103,560 Cylinder Marked Date Set No. Tested 5 1 09/26/2007 5 2 10/17/2007 5 3 10/17/2007 5 4 11/14/200'" Age (days) 7 Diameter (in) 6.00 28 28 56 Compressive Strength (psi) 3,660 Fracture Type Cone/Split Area (in') 28.27 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 5 of 8 Rone Engineering .. Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630.9745 Report of Concrete Compressive Strength Test Report No.: 299178 Project No.: 0711530 Date of Service: 09/19/2007 Report Date: 10/03/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 5" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7752 PW Placement Date: 09/19/2007 Weather Conditions: Cloudy Time Sampled: 09:05am Temperature - Air: 820F Truck No: 140 Air Content: NA Overall Placement Location: Beltline Road I Highway 635 Sample Location: Center section.north, northwest corner REPORT OF TESTS Batch time: 08:58am Concrete: 850F Ticket No: 7468 Unit Weight (pct): NA Measured Slump (inches) 5.0 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 106,800 Cylinder Marked Date Age Set No. Tested (days) 6 1 09/26/2007 7 6 2 10/17/2007 28 6 3 10/17/2007 28 6 4 11/14/2007 56 Diameter (in) 6.00 .""r Area (in') 28.27 Compressive Strength (psi) 3,780 Fracture Type Cone/Split LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 6 of 8 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 299178 Project No.: 0711530 Date of Service: 09/19/2007 Report Date: 10/03/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 5" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7752 PW Placement Date: 09/19/2007 Weather Conditions: Cloudy Time Sampled: 10:27am Temperature - Air: 860F Truck No: NA Air Content: NA Overall Placement Location: Beltline Road I Highway 635 Sample Location: North section-northeast corner REPORT OF TESTS Batch time: 09:51am Concrete: 910F Ticket No: 59014101 Unit Weight (pet): NA Measured Slump (inches) 5.0 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 73,980 Cylinder Marked Date Age Set No. Tested (days) - 7 1 09/26/2007 7 7 2 10/17/2007 28 7 3 10/17/2007 28 7 4 11/14/2007 56 Diameter (in) 6.00 Area (in2) 28.27 ,'" Compressive Strength (psi) 2,620 Fracture Type Cone/Split LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 7 of 8 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 299178 Project No.: 0711530 Date ot Service: 09/19/2007 Report Date: 10/03/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 5" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7752 PW Placement Date: 09/19/2007 Weather Conditions: Cloudy Time Sampled: 11:21am Temperature - Air: 900F Truck No: 140 Air Content: NA Overall Placement Location: Beltline Road I Highway 635 Batch time: 11: 14am Concrete: 950F Ticket No: 7473 Unit Weight (pet): NA Measured Slump (inches) 5.0 Sample Location: North section-northwest corner REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 8 1 09/26/2007 7 6.00 28.27 73,320 2,590 Cone/Split 8 2 10/17/2007 28 8 3 10/17/2007 28 8 4 11/14/2007 56 Technician: Jason Shipe Started: 02:30am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc Potter Concrete Attn: Mr. Ryan Skelly 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Finished: 01 :OOpm Rone Engineering p~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 8 of 8 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 299641 Project No.: 0711530 Date of Service: 09/22/2007 Report Date: 10/03/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 9701 PW Placement Date: 09/22/2007 Weather Conditions: Sunny Time Sampled: 04:02am Temperature - Air: 760F Truck No: 119 Air Content: NA Overall Placement Location: Beltline Road/Highway 635 Batch time: 03:55am Concrete: 800F Ticket No: 7579 Unit Weight (pct): NA Measured Slump (inches) 5.0 Sample Location: Grid 0/10.5 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) 1 1 09/29/2007 7 6.00 28.27 82,900 2,930 1 2 10/20/2007 28 1 3 10/20/2007 28 ~ '", 1 :4 11/17/2007 56 Fracture Type Cone/Split LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 1 of 4 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 299641 Project No.: 0711530 Date of Service: 09/22/2007 Report Date: 10/03/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 9701 PW Placement Date: 09/22/2007 Weather Conditions: Sunny Time Sampled: 04:50am Temperature - Air: 760F Truck No: 120 Air Content: NA Overall Placement Location: Beltline Road/Highway 635 Sample Location: Grid 12/G REPORT OF TESTS Batch time: 04:42am Concrete: 800F Ticket No: 7585 Unit Weight (pcf): NA Measured Slump (inches) 5.0 Cylinder Marked Set No. - - 2 1 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 87,730 Date Tested 09/29/2007 Age (days) 7 Diameter (in) 6.00 2 2 2 3 10/20/2007 10/20/2007 28 28 2 11/17/2007" 56 4 Area (in') 28.27 Compressive Strength (psi) 3,100 Fracture Type Cone/Split LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CHILB) Page 2 of 4 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 299641 Project No.: 0711530 Date ot Service: 09/22/2007 Report Date: 10/03/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 9701 PW Placement Date: 09/22/2007 Weather Conditions: Sunny Time Sampled: 06:25am Temperature - Air: 780F Truck No: 110 Air Content: NA Overall Placement Location: Beltline Road/Highway 635 Batch time: 06: 18am Concrete: 800F Ticket No: 7597 Unit Weight (pet): NA Measured Slump (inches) 5.0 Sample Location: Grid 14/G REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 3 1 09/29/2007 7 6.00 28.27 103,120 3,650 Cone/Split 3 2 10/20/2007 28 3 3 10/20/2007 28 3 4 11/17/2007 56 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 3 of 4 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 299641 Project No.: 0711530 Date of Service: 09/22/2007 Report Date: 10/03/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 9701 PW Placement Date: 09/22/2007 Weather Conditions: Sunny Time Sampled: 07:21am Temperature - Air: 820F Truck No: 120 Air Content: NA Overall Placement Location: Beltline Road/Highway 635 Batch time: 07:14am Concrete: 860F Ticket No: 7605 Unit Weight (pcf): NA Measured Slump (inches) 5.0 Sample Location: Grid 16/G REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 98,610 Cylinder Marked Date Set No. Tested 4 1 09/29/2007 4 2 10/20/2007 4 3 10/20/2007 4 4 11/17/2007 Age (days) 7 Diameter (in) 6.00 28 28 56 Compressive Strength (psi) 3,490 Fracture Type Cone/Split Area (in2) 28.27 Technician: Jason Shipe Started: 03:30am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc Potter Concrete Attn: Mr. Ryan Skelly 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Finished: 09:30am Rone Engineering p~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/lB) Page 4 of 4 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 / 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 oncrete Compressive Strength Test Report No.: 299353 Project No.: 0711530 Date of Service: 09/20/2007 Report Date: 10/03/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement 10 , perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 9701 PW Placement Date: 09/20/2007 Weather Conditions: Sunny Time Sampled: 04:15am Temperature - Air: 760F Truck No: 144 Air Content: NA Overall Placement Location: Beltline Road/Highway 635 Sample Location: Grid line 8.9 REPORT OF TESTS Batch time: 04:04am Concrete: 800F Ticket No: 7484 Unit Weight (pet): NA Measured Slump (inches) 5.0 Cylinder Marked Set No. - - 1 1 Date Tested 09/27/2007 Age (days) 7 Diameter (in) 6.00 1 1 2 3 10/18/2007 1 0/18/20. a.1-~.. -~ 28 28. 1 11/15/20F~ 56 ..*1:;) .~\ f(( II 4 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 90,570 Area (in') 28.27 [,''to- Compressive Strength (psi) 3,200 Fracture Type Cone/Split LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LBfLB) Page 1 of 4 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 299353 Project No.: 0711530 Date of Service: 09/20/2007 Report Date: 10/03/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 9701 PW Placement Date: 09/20/2007 Weather Conditions: Sunny Time Sampled: 05:02am Temperature - Air: 760F Truck No: 125 Air Content: NA Overall Placement Location: Beltline Road/Highway 635 Sample Location: Grid line JIB REPORT OF TESTS Batch time: 04:55am Concrete: 800F Ticket No: 7490 Unit Weight (pcf): NA Measured Slump (inches) 5.0 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 75,930 Cylinder Marked Date Set No. Tested 2 1 09/27/2007 2 2 10/18/2007 2 3 10/18/2007 2 4 11/15/2007 Age (days) 7 Diameter (in) 6.00 28 28 56 Area (in2) 28.27 Compressive Strength (psi) 2,690 Fracture Type Cone/Split i t L1Mrr A TIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 2 of 4 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 299353 Project No.: 0711530 Date of Service: 09/20/2007 Report Date: 10/03/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 9701 PW Placement Date: 09/20/2007 Weather Conditions: Sunny Time Sampled: 06:36am Temperature - Air: 780F Truck No: 135 Air Content: NA Overall Placement Location: Beltline Road/Highway 635 Sample Location: Grid line J/5 REPORT OF TESTS Batch time: 06:26am Concrete: 800F Ticket No: 7501 Unit Weight (pet): NA Measured Slump (inches) 5.0 Cylinder Marked Date Set No. Tested 3 1 09/27/2007 3 2 10/18/2007 3 3 10/18/2007 3 4 11/15/2007 Age (days) 7 Diameter (in) 6.00 28 28 56 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 86,130 Area (in2) 28.27 Compressive Strength (psi) 3,050 Fracture Type Shear 1. -.. ~: LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 3 of 4 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 299353 Project No.: 0711530 Date of Service: 09/20/2007 Report Date: 10/03/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations. perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 9701 PW Placement Date: 09/20/2007 Weather Conditions: Sunny Time Sampled: 08:35am Temperature - Air: 800F Truck No: 142 Air Content: NA Overall Placement Location: Beltline Road/Highway 635 Batch time: 08:26am Concrete: 850F Ticket No: 7511 Unit Weight (pcf): NA Measured Slump (inches) 5.0 Sample Location: Grid line J/3 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 4 1 09/27/2007 7 6.00 28.27 83,780 2,960 Shear 4 2 10/18/2007 28 4 3 10/18/2007 28 4 4 11/15/2007 56 ,~ '. F Finished: 11 :30am Technician: Jason Shipe Started: 03:30am Report Distribution: Orig: Duke Construction. LP (Dallas. TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc Potter Concrete Attn: Mr. Ryan Skelly 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Altn: Mr. Larry Davis Rone Engineering P-~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd. (LB/LB) Page 4 of 4