Loading...
Duke Lesley-LR071010 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Concrete Compressive Strength Test Report No.: 300148 Project No.: 0612510 Date of Service: 09/27/2007 Report Date: 10/10/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: TXI Plant: 131 Specification Requirements Strength: Slump (in.): Air (%): Test Method: NA NA ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 88274 Placement Date: 09/27/2007 Weather Conditions: Clear, warm, humid Time Sampled: 09:40am Batch time: 08:49am Temperature - Air: 820F Concrete: 910F Truck No: 1815 Ticket No: 539988 Air Content: 3.7% Unit Weight (pet): NA Overall Placement Location: Sidewalk paving east and west ends of 2nd traffic median of Divident Street heading west Measured Slump (inches) 4.75 Sample Location: East end of 2nd median REPORT OF TESTS Diameter (in) 6.00 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 118,290 Area (in') 28.27 Compressive Strength (psi) 4,180 Fracture Type Cone/Split Cylinder Marked Date Age Set No. Tested (days) 1 1 10/04/2007 7 1 2 10/25/2007 28 1 3 1 O/25/200I . 28 ~L 4 11/22/2007~ 56 ~~ " fill/. /0/11/ ~ Remarks: Water added at site: 15+15 gallons over 3 yards Technician: Randy Nudge Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-ec Lacy Construction Attn: Mr. Kevin Briles 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 08: 15am Finished: 11 :OOam Rone Engineering p~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 297994 Project No.: 0612510 Date ot Service: 09/06/2007 Report Date: 10/10/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: Southern Star Plant: 105 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 4" maximum Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 9607BA Placement Date: 09/06/2007 Weather Conditions: Cloudy Time Sampled: 02:15pm Temperature - Air: 850F Truck No: 31 Air Content: NA Overall Placement Location: Light pole bases, Stations 9+92,11+62,23+52,25+48,27+44 Measured Slump (inches) 3.25 Batch time: 01:35pm Concrete: 880F Ticket No: 1079010 Unit Weight (pet): NA Sample Location: Station 9+92 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 09/13/2007 7 6.00 28.27 114,800 4,060 Cone/Shear 1 2 10/04/2007 28 6.00 28.27 136,220 4,820 Cone/Split 1 3 10/04/2007 28 6.00 28.27 142,440 5,040 Cone/Split Average 4,930 p 1 4 11/01/2007 56 Remarks: Water added at site: 10 gallons Started: 01:00pm Finished: 03:15pm Rone Engineering p~~ Technician: Ryan Rawlinson Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-ec Lacy Construction Attn: Mr. Kevin Briles 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (JB/LB) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 298112 Project No.: 0612510 Date of Service: 09/07/2007 Report Date: 10/10/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: Southern Star Plant: 110 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 3" - 5" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Batch time: 02:17pm Concrete: 1010F Ticket No: 1080408 Unit Weight (pet): NA Measured Slump (inches) 5.0 Mix Design 1.0.: 9607 SA Placement Date: 09/07/2007 Weather Conditions: Clear Time Sampled: 02:45pm Temperature - Air: 950F Truck No: 26 Air Content: NA Overall Placement Location: Light pole on Dividend Drive and Stations 29+39. 33+31, 35+22. 37+17. 41+13, 43+10 and 48+88 Sample Location: Station 29+39 REPORT OF TESTS Cylinder Marked Set No. - - 1 1 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 103,740 Compressive Strength (psi) 3,670 Fracture Type Cone/Shear Date Tested 09/14/2007 Age (days) 7 Diameter (in) 6.00 2 3 10/05/2007 28 10/05/20.. 28 11/02/2007;';;'~ .. 56 . 4 Remarks: Water added at site: 5 gallons Area (in') 28.27 6.00 6.00 28.27 28.27 142,830 147,030 Average 5,050 5,200 5,130 Shear Cone/Split ~ -r Technician: Jose Villanueva Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-ec Lacy Construction Attn: Mr. Kevin Briles 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 01: 15pm Finished: 03:45pm Rone Engineering p~-~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd. (KW/LB) Page 1 of 1