Loading...
Duke Lesley-LR071015 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 297814 Project No.: 0612510 Date of Service: 09/04/2007 Report Date: 10/05/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: Southern Star Plant: 111 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 4" maximum Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Batch time: 11 :50am Concrete: 870F Ticket No: 1077749 Unit Weight (pet): NA Measured Slump (inches) 1.75 Mix Design I.D.: 9607 SA Placement Date: 09/04/2007 Weather Conditions: Light rain Time Sampled: 02:40pm Temperature - Air: 800F Truck No: 1084 Air Content: NA Overall Placement Location: Concrete poured for light pole bases, Stations 1 +45, 3+15, 4+85, 6+54, 8+23 Sample Location: Station 1 +45 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 09/11/2007 7 6.00 28.27 133,470 4,720 Cone/Split 1 2 10/02/2007 28 6.00 28.27 163,260 5,770 Cone/Split 1 3 10/02/2007 28 6.00 28.27 167,870 5,940 Cone/Split f;> Average 5,860 4 10/30/2007 56 -e Started: 01 :OOpm Finished: 03:30pm Rone Engineering p~.~ Technician: Ryan Rawlinson Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-ec Lacy Construction Attn: Mr. Kevin Briles 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 1 of 1