ST9905-CS071009 CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: Bethel Road I Project # ST 99-05 CONTRACTOR: Tiseo Paving Company OWNER: City of Coppell CHANGE ORDER NO.: Five (5) DATE: October 9,2007 Page 10f2 Item Description Quantity Unit Unit Price Total Minyard's Development: ADD: Water Line @ Sta 50+06.5 1. Additional Traffic Control 1 LS 750.00 $750.00 2. Additional Staking 1 LS 250.00 $250.00 3. 16" x 8" Tapping Sleeve & Valve 1 EA 3,850.00 $3,850.00 4. Aspha1t/F1exbase Street Repair 1 LS 1,500.00 $1,500.00 5. Bore w / Casing Under Existing 25 LF 230.00 $5,750.00 Street 6. Bore w/o Casing Under Existing 12 LF 115.00 $1,380.00 Box 7. Two 450 Bends & Plug 1 LS 1,750.00 $1,750.00 8. 8" PVC 97 LF 55.25 $5,359.25 9. Testing 1 LS 700.00 $700.00 Sewer Line @ Sta 50+ 18.85 10. Additional Traffic Control 1 LS 750.00 $750.00 11. Additional Staking 1 LS 250.00 $250.00 12. Steel Plate & MH Safety Ring 1 LS 2,200.00 $2,200.00 13. Asphalt/F1exbase Street Repair 1 LS 2,500.00 $2,500.00 14. Bore w/o Casing under Box 12 LF 115.00 $1,380.00 15. 8" Plug 1 EA 200.00 $200.00 16. Testing 1 LS 700.00 $700.00 17. 8" PVC Sewer Line 65 LF 63.75 $4,143.75 18. 4-ft Diameter Manhole 1 EA 4,200.00 $4,200.00 Median Openings 19. 9" Concrete Pavement 357 SY 29.00 $10,353.00 7.5 TON 105.00 $787.50 357 SY 2.95 $1,053.15 2 EA 1,200.00 $2,400.00 67 SY 83.00 $5,561.00 $57,767.65 $7,293,659.00 0 $8,000.00 $8,580.00 $14,247.00 $57,767.65 $7,382,253.65 0 573 Calendar Days 20. Lime @ 42 lbs/SY 21. 8" Stabilized Subgrade 22. Median Noses 23. Stamped Concrete Total Revision to Contract Amount Previous contract amount Net increase in contract amount Change Order #1 Net increase in contract amount Change Order #2 Net increase in contract amount Change Order #3 Net increase in contract amount Change Order #4 Net increase in contract amount Change Order #5 Revised contract amount Net increase in contract time of completion Revised Contract time of completion The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract. rI...u-. ,-f)JJ .0 .9.7 RWt~ nde~ b~Engineer Date g~/~cJ Date Ac Page 2 Of2