Alexander Ct-LR071004
I~A TESTING. INe.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
972/6~8911 - 972/263-4937 (Metro)
FAX: 972/406-8023
DAILY FIELD
REPORT
PROJECT
DATE: 10/04/07
TESTED FOR: MIRA MAR DEVELOPMENT CORPORATION
COLLEYVILLE, TEXAS
;'
ALEXANDER COURT /
COPPELL, TEXAS /
OUR REPORT NO.: 070021-7
"
TECHNICIAN: D.
WEATHER: SUNNY
.:\\JJ
TEMPERATURE RANGE: 83 TO 90
THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED SITE TO MONITOR ON-GOING WORK AND
PERFORM FIELD TESTING AS REQUESTED.
SUBGRADE FOR BLOCK A, PADS 1, 2, 6, 7 AND 28 WAS OBSERVED TO VERIFY THAT AREAS HAD BEEN PREPARED IN
ACCORDANCE WITH GEOTECHNICAL RECOMMENDATIONS.
AT THE COMPLETION OF THE SCHEDULED TESTING, THE TECHNICIAN RETURNED TO THE DALLAS OFFICE.
Respectfully Submitted,
~~
Tom Ellis
ALPHA TESTING, INC.
Our test results and reports are for the exclusive use of the Client (and their designated recipients on file In our office) and shall not be reproduced andlor distributed except with express approval of Alpha. The use of
our name and test results must receive our written approvaL Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
Geotechnical Engineering fl; Construction Materials Testing fl; Environmental Engineering fl; Consulting