Loading...
WA9601B-CS 990709.......... ii SHIMEK, JAC OBS & FINKI,EA, L.L.P. ;' CONSULTING ENGINEERS i 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JoE R. CARTER, P.E. July 9, 1999 GARY C. HENDRICKS, P.E. I. C. FINKLEA, P.E. / Mr. Kennet . Griffin, P.E. City of C ppell Post O ~ce Box 478 Co ell, Texas 75019 Sandy Lake Water Line Change Order Number 2 Dear Mr. Griffin: We are enclosing three fully executed copies of Change Order Number 2 to the City' s contract with Fox Contractors, Inc. for the construction of the Sandy Lake Road Water Line. Change Order Number 2 covers the extra work required to connect to the existing 24-inch water line on the east side of Denton Tap Road. These sets are for your files. We are available to discuss this project further at your convenience. Sincerely yours, ~ / .... p . ~;~C. He ,,.E"' Enclosure L//ty6'i Mr. Larry Davis