WA9601B-CS 990709.......... ii SHIMEK, JAC OBS & FINKI,EA, L.L.P.
;' CONSULTING ENGINEERS
i 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900
ROSS L. JACOBS, P.E.
RONALD V. CONWAY, P.E.
JOHN W. BIRKHOFF, P.E.
JoE R. CARTER, P.E. July 9, 1999
GARY C. HENDRICKS, P.E.
I. C. FINKLEA, P.E.
/
Mr. Kennet . Griffin, P.E.
City of C ppell
Post O ~ce Box 478
Co ell, Texas 75019
Sandy Lake Water Line
Change Order Number 2
Dear Mr. Griffin:
We are enclosing three fully executed copies of Change Order Number 2 to the City' s contract with Fox
Contractors, Inc. for the construction of the Sandy Lake Road Water Line. Change Order Number 2 covers the
extra work required to connect to the existing 24-inch water line on the east side of Denton Tap Road. These
sets are for your files.
We are available to discuss this project further at your convenience.
Sincerely yours,
~ /
.... p .
~;~C. He ,,.E"'
Enclosure
L//ty6'i Mr. Larry Davis