Report of Reinforcing Steel Inspection
Report No.: 300209
Project No.: 0712932
Date of Service: 09/27/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Reinforcing Steel Inspection
Report of Inspection
Locations and Items Inspected:
Approach, southeast corner of job site from Beltline, 15' west and aporoach at
northeast corner of site from Beltline, 60' west
Items Inspected Conforming Non Items Inspected: Conforming Non "ems Inspected: Co nfo rm ing Non
Co nform ing Conforming Co nfo rm ing
P lacing Drawings Bar Length Column Ties Properly
Appro ved x and Shape x Tied and Spaced NA
Bar Size x P roper Bar Placement x Stirrup Spacing NA
Bar Grade x Pro perly Tied x Stirrup Type NA
Bars Clean x DowelBars in Place x Lapped Splices x
Form Clean x Pro per Bar Suppo rts x CornerBars NA
Numberof Bars x ProperCover x Mechanical Splices NA
Discrepancies I Comments:
No apparent discrepancies were noted at the locations listed above.
Technician: Chris Harbour Rone Engineering
See Report 300102 for technician time~ ~
Report Distribution: ~
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne .' ..' .
(1-ec copy)
1-cc City of Coppell Attn: Mr. Lee Stone K. Scott Watson AET
1-cc City of Coppell Attn: Mr. Larry Davis Project Manager
~
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMIKW) Page 1 of 1
Rone Eni~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 298992
Project No.: 0712932
Date of Service: 09/18/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349 PW
Placement Date: 09/18/2007
Weather Conditions: Cloudy, calm
Time Sampled: 03:50am Batch time: 03:36am
Temperature - Air: 740F Concrete: 860F
Truck No: 120 Ticket No: 13443
Air Content: NA Unit Weight (pcf): NA
Overall Placement Location:
Line E, F, G
Measured
Slump
(inches)
3.0
Sample Location:
Line E, F, G, (1-1.8)
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
1 1 09/25/2007 7 6.00 28.27 112,950 3,990 Shear
1 2 10/16/2007 28 6.00 28.27 149,630 5,290 Cone/Split
1 3 10/16/2007 28 6.00 28.27 150,170 5,310 Cone/Split
Average 5,300
4 11/13/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd.
(CH/KW) Page 1 of 10
Rone Eni=:=
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 298992
Project No.: 0712932
Date of Service: 09/18/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349 PW
Placement Date: 09/18/2007
Weather Conditions: Cloudy, calm
Time Sampled: 05:10am Batch time: 04:53am
Temperature - Air: 740F Concrete: 840F
Truck No: 138 Ticket No: 13452
Air Content: NA Unit Weight (pcf): NA
Overall Placement Location:
Line E, F, G
Measured
Slump
(inches)
6.0
Sample Location:
Line E, F, G, (1.8-2.4)
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
2 1 09/25/2007 7 6.00 28.27 109,060 3,860 Cone/Split
2 2 10/16/2007 28 6.00 28.27 139,020 4,920 Cone/Shear
2 3 10/16/2007 28 6.00 28.27 140,500 4,970 Cone/Split
Average 4,940
2 4 11/13/2007 56
LIMITATION S: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 2 of 10
Rone Eni~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 298992
Project No.: 0712932
Date of Service: 09/18/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349 PW
Placement Date: 09/18/2007
Weather Conditions: Cloudy, calm
Time Sampled: 06:05am Batch time: 05:53am
Temperature - Air: 740F Concrete: 840F
Truck No: 126 Ticket No: 13462
Air Content: NA Unit Weight (pet): NA
Overall Placement Location:
Line E, F, G
Measured
Slump
(inches)
5.0
Sample Location:
Line E, F, G, (2.4-3.4)
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
3 1 09/25/2007 7 6.00 28.27 103,040 3,640 Cone/Split
3 2 10/16/2007 28 6.00 28.27 135,280 4,780 Shear
3 3 10/16/2007 28 6.00 28.27 137,910 4,880 Shear
Average 4,830
3 4 11/13/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 3 of 10
Rone Eni~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 298992
Project No.: 0712932
Date of Service: 09/18/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349 PW
Placement Date: 09/18/2007
Weather Conditions: Sunny, windy
Time Sampled: 07:45am Batch time: 06:56am
Temperature - Air: 780F Concrete: 880F
Truck No: 120 Ticket No: 13472
Air Content: NA Unit Weight (pcf): NA
Overall Placement Location:
Line E, F, G
Measured
Slump
(inches)
5.0
Sample Location:
Line E, F, G, (3.4-4.5)
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
4 1 09/25/2007 7 6.00 28.27 110,950 3,920 Cone/Split
4 2 10/16/2007 28 6.00 28.27 138,860 4,910 Cone/Shear
4 3 10/16/2007 28 6.00 28.27 134,700 4,760 Cone/Split
Average 4,840
4 4 11/13/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 4 of 10
Rone Eni==
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 298992
Project No.: 0712932
Date of Service: 09/18/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349 PW
Placement Date: 09/18/2007
Weather Conditions: Sunny
Time Sampled: 08:45am
Temperature - Air: 800F
Truck No: 103
Air Content: NA
Overall Placement Location:
Line E, F, G
Batch time: 08:24am
Concrete: 860F
Ticket No: 13482
Unit Weight (pet): NA
Measured
Slump
(inches)
5.0
Sample Location:
Line E, F, G, (4.5-5.5)
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Com pressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
5 1 09/25/2007 7 6.00 28.27 117,460 4,150 Cone/Shear
5 2 10/16/2007 28 6.00 28.27 145,050 5,130 Cone/Split
5 3 10/16/2007 28 6.00 28.27 139,760 4,940 Shear
Average 5,040
5 4 11/13/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 5 of 10
Rone En2~
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 298992
Project No.: 0712932
Date of Service: 09/18/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349 PW
Placement Date: 09/18/2007
Weather Conditions: Sunny
Time Sampled: 09:35am
Temperature - Air: 840F
Truck No: 139
Air Content: NA
Overall Placement Location:
Line E, F, G
Sample Location:
Line E, F, G, (5.5-6.4)
REPORT OF TESTS
Batch time: 09:29am
Concrete: 880F
Ticket No: 13494
Unit Weight (pet): NA
Measured
Slump
(inches)
6.0
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
6 1 09/25/2007 7 6.00 28.27 106,790 3,780 Cone/Split
6 2 10/16/2007 28 6.00 28.27 133,210 4,710 Cone/Split
6 3 10/16/2007 28 6.00 28.27 137,980 4,880 Shear
Average 4,800
6 4 11/13/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 6 of 10
Rone Eni=::=
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 298992
Project No.: 0712932
Date of Service: 09/18/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349 PW
Placement Date: 09/18/2007
Weather Conditions: Sunny
Time Sampled: 11:10am
Temperature - Air: 840F
Truck No: 138
Air Content: NA
Overall Placement Location:
Line E, F, G
Batch time: 10:37am
Concrete: 880F
Ticket No: 13506
Unit Weight (pet): NA
Measured
Slump
(inches)
6.0
Sample Location:
Line E, F, G, (6.4-7.5)
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
7 1 09/25/2007 7 6.00 28.27 92,940 3,290 Shear
7 2 10/16/2007 28 6.00 28.27 128,510 4,550 Shear
7 3 10/16/2007 28 6.00 28.27 130,260 4,610 Cone/Split
Average 4,580
7 4 11/13/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 7 of 10
Rone Eni~
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 298992
Project No.: 0712932
Date of Service: 09/18/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349 PW
Placement Date: 09/18/2007
Weather Conditions: Sunny
Time Sampled: 12:30pm
Temperature - Air: 940F
Truck No: 139
Air Content: NA
Overall Placement Location:
Line E, F, G
Batch time: 12:12pm
Concrete: 880F
Ticket No: 13518
Unit Weight (pet): NA
Measured
Slump
(inches)
5,0
Sample Location:
Line E, F, G, (7.5-8.5)
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
8 1 09/25/2007 7 6.00 28.27 106,580 3,770 Cone/Split
8 2 10/16/2007 28 6.00 28.27 142,580 5,040 Shear
8 3 10/16/2007 28 6.00 28.27 142,110 5,030 Cone/Split
Average 5,030
8 4 11/13/2007 56
LIMITATION S: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no controL Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 8 of 10
Rone Eni~
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 298992
Project No.: 0712932
Date of Service: 09/18/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349 PW
Placement Date: 09/18/2007
Weather Conditions: Sunny
Time Sampled: 01 :30pm
Temperature - Air: 920F
Truck No: 125
Air Content: NA
Overall Placement Location:
Line E, F, G
Batch time: 01:14pm
Concrete: 900F
Ticket No: 13529
Unit Weight (pcf): NA
Measured
Slump
(inches)
6.0
Sample Location:
Line E, F, G, (8.5-9.5)
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
9 1 09/25/2007 7 6.00 28.27 95,690 3,380 Cone/Split
9 2 10/16/2007 28 6.00 28.27 124,660 4,410 Cone/Split
9 3 10/16/2007 28 6.00 28.27 132,730 4,690 Cone/Split
Average 4,550
9 4 11/13/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 9 of 10
Rone En2==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 298992
Project No.: 0712932
Date of Service: 09/18/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349 PW
Placement Date: 09/18/2007
Weather Conditions: Sunny
Time Sampled: 02:05pm
Temperature - Air: 920F
Truck No: 139
Air Content: NA
Overall Placement Location:
Line E, F, G
Batch time: 01 :41 pm
Concrete: 900F
Ticket No: 13533
Unit Weight (pet): NA
Measured
Slump
(inches)
5.0
Sample Location:
Line E, F, G, (9.5-10)
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
10 1 09/25/2007 7 6.00 28.27 89,910 3,180 Cone/Split
10 2 10/16/2007 28 6.00 28.27 123,200 4,360 Cone/Split
10 3 10/16/2007 28 6.00 28.27 120,070 4,250 Cone/Split
Average 4,300
10 4 11/13/2007 56
Started: 02:30am Finished: 03:00pm
Technician: Denny Harris
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc Polter Concrete Altn: Mr. Ryan Skelly
1-cc City of Coppell Altn: Mr. Lee Stone
1-cc City of Coppell Altn: Mr. Larry Davis
Rone Engineering
~~~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 10 of 10
Rone En2~
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 298978
Project No.: 0712932
Date of Service: 09/18/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 3,000 psi @ 28 days
Slump (in.): NA
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 7751 PW
Placement Date: 09/18/2007
Weather Conditions: Clear
Time Sampled: 09:10am
Temperature - Air: 750F
Truck No: 125
Air Content: NA
Overall Placement Location:
Building pier D-H/18-20
Batch time: 08:30am
Concrete: 830F
Ticket No: 13483
Unit Weight (pcf): NA
Measured
Slump
(inches)
6.75
Sample Location:
Building pier E/18
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 09/25/2007 7 6.00 28.27 85,950 3,040 Cone/Split
1 2 09/25/2007 7 6.00 28.27 95,000 3,360 Shear
Average 3,200
1 3 10/16/2007 28 6.00 28.27 111,590 3,950 Shear
1 4 10/16/2007 28 6.00 28.27 109,970 3,890 Shear
Average 3,920
5 11/13/2007 56
Remarks: Water added at site: 10 gallons (before sample)
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(LB/KW) Page 1 of 2
Rone Eni~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 298978
Project No.: 0712932
Date of Service: 09/18/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 3,000 psi @ 28 days
Slump (in.): NA
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 7751 PW
Placement Date: 09/18/2007
Weather Conditions: Partlly Cloudy
Time Sampled: 04:40pm Batch time: 04:30am
Temperature - Air: 920F Concrete: 950F
Truck No: 135 Ticket No: 13537
Air Content: NA Unit Weight (pet): NA
Overall Placement Location:
Building pier D-H/18-20
Measured
Slump
(inches)
6.0
Sample Location:
Building pier F/20
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
2 1 09/25/2007 7 6.00 28.27 82,300 2,910 Shear
2 2 09/25/2007 7 6.00 28.27 72,350 2,560 Cone/Split
Average 2,730
2 3 10/16/2007 28 6.00 28.27 115,430 4,080 Shear
2 4 10/16/2007 28 6.00 28.27 119,560 4,230 Shear
Average 4,160
2 5 11/13/2007 56
Technician: Chris Harbour Rone Engineering
See Report 298977 for technician time~~
Report Distribution:~
0",,' Ook. C'"'t"".~". lP (D."... TX) All", M'. P,"' Bym. . ..' . . .. =--
(1-ec copy)
1-cc Poller Concrete Alln: Mr. Ryan Skelly K. Scott Watson, AET
1-cc City of Coppell Alln: Mr. Lee Stone proJ'ect Manager
1-cc City of Coppell Alln: Mr. Larry Davis
LIMITATIONS: The test results presented herein were prepared based upon the specifiC samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(LB/KW) Page 2 of 2
Rone En~~
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 301763
Project No.: 0712932
Date of Service: 10/11/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
Report of Inspection
D rille r: A ua e r
Pier Identificatio n G .8 13 0 G .2/30 E .8/30 A 19.2 A 18.8
PierDiameter(in) 30 30 30 30 30
Depth of Pier From Surface (ft) 42.80 42.00 43.20 41.00 40.00
Depth of Bear in a Stratum From S urfa ce (ft) 36.00 36.20 38.00 35.00 33.50
Required Penetration 1ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft)" 6.80 5.80 5.20 6.00 6.50
Condition of Bottom (wet/drv) D rv Dry D rv D rv D rv
Plumb Within Tolerance (ves Ino) Yes Yes Yes Yes Yes
Casina Diameter(in)/Casina Lenath (ft) 32 13 6 3 2 13 6 32 13 8 32 134 .7 32/33.2
NumberofBars IReinforcino BarSize 8 1#6 8 1#6 8 1#6 8 1#6 8 1#6
Lenath of Reinforcina Steel (ft) 41.60 40.80 41 .90 39.80 38.70
Time Drillino was Comoleted (am Ipm) 8 :1 0 AM 8 :4 0 AM 9:06 AM 9 :40 A M 10:06 AM
Time Concrete was Placed (am Ipm) 9 :2 0 AM 10:55 AM 12:10 PM 2 :4 0 P M 2 :59 PM
Depth of Pier From Too of Concrete (ft) 42.30 41.50 42.70 40.50 39.50
E Ie va ti 0 n: S u rfa c e (ft).. 98.50 98.50 98.50 95.50 95.50
E Ie va tio n: Top 0 f Pie r (ft)" 9 8 .00 98.00 98.00 95.00 95.00
Elevation: Bottom of Pier 1ft).. 55.70 56.50 55.30 54.50 55.50
Elevation: Top of Bear in a Stratum (ft.)" 62.50 62.30 60.50 60.50 62.00
Bearina Stratum (descriotion) B lu e s h a Ie
Note:See report# NA forCompressive StrengthTestSpecimens.
"Additional Penetration not requested unless noted. "E levation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 2
Rone En~==
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 301763
Project No.: 0712932
Date of Service: 10/11/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: Auaer
Pier Identification F .8/3 0 F .2/30 A /8.2 A /7.8
Pie r D i a mete r (i n ) 30 30 30 30
D e p th 0 f Pie r Fro m Surface(ft) 42.00 45.00 40.10 40.70
Depth of Bear in a Stratum Fro m Surface(ft) 37.00 40.00 34.60 35.70
Required Penetration (ft) 5.00 5.00 5.00 5.00
A ctua I P e netra lio n (ft)' 5.00 5.00 5.50 5.00
Condition of Bottom (wet / dry) D rv Dry Dry Dry
Plum b Within Tolerance (yes / no) Yes Yes Yes Yes
Casino Diameter(in)/Casino Length (ft) 3 2 /3 7 3 2 /3 8 .9 3 2/34 32/34.5
NumberofBars /Reinforcing BarSize 8 / # 6 8 / #6 8 / # 6 8 / # 6
Lenoth of Reinforcing Steel(ft) 40.70 43.80 38.90 39.40
Time DrillinQ was Completed (am /pm) 10:50AM 1 1 :5 1 AM 1 :05 P M 4 :0 5 P M
Tim e Con c re te was P la c e d (a m / pm) 12:30PM 1 :40 P M 3 :2 5 P M 4 :4 5 P M
Depth of Pier From Top of Concrete (ft) 41 .50 44.50 39.60 40.20
Elevation:Surface (ft).. 98.50 98.50 95.50 95.50
Elevation: Top of Pier (ft)" 98.00 98.00 95.00 95.00
Elevation: Bottom of Pier (ft).. 56.50 53.50 55.40 54.80
Elevation: Top ofBearinQ Stratum (ft.)" 61 .50 58.50 60.90 59.80
Bearing Stratum (descriotion) B lu e s h a Ie
Not e: See re port # NA for Com pressive S Irength Test S pecim ens.
, Add ilia n a I Pen e I ra t ion no I re que s led unless naled. uE levatian by alhers
Technician: Chris Harbour Started: 06:00am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Altn: Mr. Lee Stone
1-cc City of Coppell Altn: Mr. Larry Davis
Finished: 05:45pm Rone Engineering
p~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 2 of 2
Rone Eni~
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 301582
Project No.: 0712932
Date of Service: 10/10/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
I
D rille r: A ug e r
Pier Identification A 126.2 A 12 6.8 L .1/2 8 .5 L .1 12 9 .5 L. 1/3 0 .1
Pier Diameter (in) 30 30 30 30 30
D eoth of Pier From Surface (ft) 45.40 45.70 39.40 39.80 41 .30
Deoth of Bear in a Stratum Fro m S urfa ce (ft) 39.50 40.50 33.40 33.40 35.70
Required Penetration (ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft)* 5.90 5.20 6.00 6.40 5.60
C ond ition of Bottom (wet I dry) D rv Dry D rv D rv D rv
Plumb Within Tolerance (yes Ino) Yes Yes Yes Yes Yes
Casing Diameter(in)/Casing Lenath eft) 32/39.5 32/40.5 32/33.4 3 2/3 3 3 2 13 5 .3
NumberofBars/Reinforcina BarSize 8 1#6 8 1#6 8 1#6 8 1#6 8 1#6
Lenath of Reinforcing Steel (ft) 44.20 44.50 44.10 38.60 40.10
Time Drillina was Completed (am 10m) 902 AM 9:29AM 10:12 AM 10:30AM 12:15 PM
Time Concrete was Placed (am Ipm) 10:00AM 12:30 PM 1 :36 PM 2:15 PM 2:45 PM
Depth of Pier From Top of Concrete (ft) 44.90 45.20 38.90 39.30 40.80
Elevation: Surface (ft)** 95.50 95.50 98.50 98.50 98.50
Elevation: Top of Pier (ft)** 95.00 95.00 98.00 98.00 98.00
Elevation: Bottom of Pier (ft)** 50.10 49.80 59.10 58.70 57.20
Elevation: Too 0 f B ear i n g S t rat u m (ft.) * * 56.00 55.00 65.10 65.10 62.80
Bearing Stratum (description) Blue shale
Note: See re port # NA for Compressive Strength Test Specimens.
* Additional Penetration not requested u n Ie s s note d . **E levation by others
Report of Inspection
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 2
Rone En2==
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 301582
Project No.: 0712932
Date of Service: 10/10/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: Auger
Pie rid e ntifica tio n K.6/30.1 K.2/30.1 J .8/3 0 .1 H .8/30 H .2/3 0
Pier Diameter (in) 30 30 30 30 30
De p th 0 f Pie r Fro m Surface (ft) 41 .90 41.50 41 .00 39.70 43.50
Depth of Bearing Stratum Fro m Surface (ft) 36.10 36.00 34.90 34.30 38.00
Required Penetration (ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft)" 5.80 5.50 6.1 0 5.40 5.50
Condition of Bottom (wet/dry) Dry D rv Dry Dry Dry
Plum b Within Tolerance (yes 1 no) Yes Ye s Yes Yes Yes
Casing Diameter(in)/Casing Length (ft) 3 2 13 6 3 2 13 6 3 2 13 4 .5 3 2 13 4 .3 32/38
NumberofBars IReinforcing BarSize 8 1 # 6 8 1 #6 8 1 #6 8 1 # 6 8 1 #6
Length of Reinforcing Steel (ft) 40.70 40.20 39.80 38.50 42.30
Time Drilling was Completed (am Ipm) 1 :05 PM 1 :37 PM 2 :05 PM 2 :4 7 P M 3 :4 0 P M
Tim e Con c re te was P la c e d (a m 1 pm) 5 :2 0 P M 4: 1 1 PM 4:50 PM 5 :4 5 P M 6 :2 0 P M
Depth of Pier From Top of Concrete (ft) 41.40 41 .00 40.50 39.20 43.00
Elevation: Surface (ft).. 98.50 98.50 98.50 98.50 98.50
Elevation: Top of Pier (ft).. 98.00 98.00 98.00 98.00 98.00
Elevation: Bottom of P ie r (ft).. 56.60 57.00 57.50 58.80 55.00
Elevation: Top of Bearing Stratum (ft.)' . 62.40 62.50 63.60 64.20 60.50
Bearina Stratum (description) Blue shale
Not e: See re port # NA for Compressive Strength Test Specimens.
. Additional Penetration not requested unless noted. "E levation by others
Technician: Chris Harbour Started: 06:00am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Alln: Mr. Lee Stone
1-cc City of Coppell Alln: Mr. Larry Davis
Finished: 07:00pm Rone Engineering
p~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd.
(CH/KW) Page 2 of 2
Rone Eni=:=
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 301290
Project No.: 0712932
Date of Service: 10/08/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
Report of Inspection
D rille r: Auger
Pier Identification A /1 2 .8 A /1 2.2 A /1 1 .8 A /1 1 .2 A 110.8
Pier Diameter (in) 30 30 30 30 30
D e p th 0 f Pie r F ro m Surface(ft) 38.70 38.80 41 .00 42.00 43.00
Depth of Bearing Stratum Fro m Surface(ft) 32.90 33.00 35.00 36.00 36.50
ReQuired Penetration 1ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft)' 5.80 5.80 6.00 6.00 6.50
Condition of Bottom (wet/drv) D rv D rv D rv Dry Dry
Plumb Within Tolerance (ves Ino) Yes Yes Yes Yes Ye s
Casing Diameter(in)/Casing Length (fl) 32/32.5 32/33 3 2 13 4 3 2 13 5 .7 32/36.5
NumberofBars IReinforcina BarSize 8 1#6 8 1#6 8 1#6 8 1#6 8 1#6
Length of Reinforcina Steel 1ft) 37.50 37.60 39.70 40.80 41 .80
Time Drillina was Comoleted lam 10m) 8 :2 8 AM 8:57 AM 9 :30 AM 1 0 :0 0 A M 1 0 :21 AM
Time Concrete was Placed (am Ipm) 9 :3 0 AM 10:15AM 10 :45 AM 1 1 :20 A M 1 1 :40 A M
Depth of Pier From Too of Concrete (ft) 38.20 38.30 40.50 41 .50 42.50
E leva tio n: S urfa ce (to" 95.50 95.50 95.50 95.50 95.50
Elevation:Top of Pier (ft).. 95.00 95.00 95.00 95.00 95.00
Elevation: Bottom of Pier (fl)" 5 6 .80 5 6.70 54.50 53.50 52.50
Elevation: Top of Bear in a Stratum (ft,)" 6 2 .60 6 2.50 60.50 59.50 59.00
Bearing Stratum (description) B lu e s h a Ie
Note: See re port # NA for Compressive Strength Test Specimens.
... Additional Penetration not requested unless noted. "''''E lavation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/KW) Page 1 of 3
Rone Eni==
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 301290
Project No.: 0712932
Date of Service: 10/08/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: Auaer
Pie r Id e ntifica tio n A 110.2 A 19.8 A 11 6.2 A 11 6.8 A 11 7.2
Pier Diameter (in) 30 30 30 30 30
De p th 0 f P ie r Fro m Surface(ft) 41 .80 40.00 43.40 40.30 38.60
Deoth of Bear in a Stratum Fro m Surface (ft) 34.70 34.00 37.00 35.00 33.00
Reauired Penetration (ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft)' 7.10 6.00 6.40 5.30 5.60
Condition ofBotlom (wet! dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes Ino) Yes Yes Yes Ye s Yes
Casina Diameter(in)/Casing Length (ft) 3 2 13 4 .5 32/34 32/36.5 3 2 13 4 32/3 3
N u m b e r 0 f Bar siR e info r c i n g Bar S i z e 8 1#6 8 1#6 8 1#6 8 1#6 8 1#6
Len 9 th 0 f Rei n fo rc i noS te e I (ft) 40.60 38.80 42.20 39.00 37.40
Time Drillina was Comoleted (am I pm) 1 0 :48 A M 11:34AM 12:15 PM 1 :05 PM 2:15 PM
Time Concrete was Placed (am Ipm) 12 :0 5 PM 1 2 :40 P M 1 :40 P M 2 :3 5 PM 3:10 PM
Depth of Pier From Top of Concrete ( ft) 41 .30 39.50 42.90 39.80 38.1 0
Elevation: Surface (ft).. 95.50 95.50 95.50 95.50 95.50
Elevation:Too of Pier (ft).. 95.00 95.00 95.00 95.00 95.00
Elevation: Bottom of Pier (ft).. 53.70 55.50 52.1 0 55.20 56.90
Elevation: Too of Bearing Stratum ( ft. ) H 60.80 61 .50 58.50 60.50 62.50
Bearina Stratum (d e s c ri 0 ti 0 n) B lu e s h a Ie
Note:See report# NA forCompressive StrengthTestSpecimens.
'Additional Penetration not requested unless noted. HElevation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/KW) Page 2 of 3
Rone Eni~
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 301290
Project No.: 0712932
Date of Service: 10/08/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: Auger
Pie rid e ntifica tio n A /1 7.8 A /1 8.2 A /1 8 .8
PierDiameter(in) 30 30 30
D eoth of Pier From S u rfa c e (ft) 38.00 41.40 38.80
Depth of Bearing Stratum Fro m S u rfa ce (ft) 33.00 35.20 33.20
Required Penetration (ft) 5.00 5.00 5.00
A ctua I P e netra tio n (fl)* 5.00 6.20 5.60
Condition of Boll om (wet/dry) Dry Dry Dry
Plum b Within Tolerance (ves / no) Yes Yes Yes
Casing Diameter(in)/Casing Length (ft) 3 2 /3 3 3 2 /3 5 32/33.2
NumberofBars /Reinforcing BarSize 8 / #6 8 / # 6 8 / # 6
Length of Reinforcing Steel (ft) 36.80 40.20 37.50
Time Drilling was Comoleted (am /0 m) 2 :4 0 P M 3:00 PM 4:10 PM
Tim e Con c re te was P la e e d (a m / pm) 3 :2 5 P M 4:20 PM
De p th 0 f Pie r Fro m Top of C onerete (ft) 37.50 40.90 38.30
Elevation: Surface (ft)" 9 5.50 95.50 95.50
Elevation: Top of Pier (ft).. 95.00 95.00 95.00
E Ie va tio n: Bolio m of Pie rift).. 57.50 54.1 0 56.70
Elevation: Top of Bearing Stratum (ft.)" 62.50 60.30 62.30
Bearing Stratum (description) B lu e s h a Ie
Not e. See re port # NA for Compressive Strength Test Specimens.
'Additional Penetration not requested unless noted uE levation by others
Technician: Chris Harbour Started: 06:00am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) AUn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Altn: Mr. Lee Stone
1-cc City of Coppell Altn: Mr. Larry Davis
Finished: 05:30pm Rone Engineering
P-~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/KW) Page 3 of 3
Rone En2==
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 301460
Project No.: 0712932
Date of Service: 10/09/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
Report of Inspection
o rille r: Auaer
Pie rid e ntifica tio n A 115.8 A 119.2 A 11 9.8 A 12 0 .2 A /2 0 .8
Pie r D i a mete r (i n) 30 30 30 30 30
Deoth of Pier From Surface(ft) 43.00 38.00 39.70 43.00 41 .30
Depth of Bear in a Stratum Fro m S urfa ce (ft) 36.20 32.50 34.20 37.00 35.00
Rea uire d P e ne tra tio n (ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft)' 6.80 5.50 5.50 6.00 6.30
Condition of Bottom (wet/dry) Dry Dry Dry Dry Dry
Plumb WithinTolerance (yes/no) Yes Yes Yes Yes Ye s
Casina Diameter(in)ICasina Lenath (fl) 32136 38/32.5 3 2 /3 4 .2 32/3 5 .5 32/35
NumberofBars IReinforcina BarSize 8 / # 6 8 1#6 8 / #6 8 1#6 8 1#6
Length of Reinforcing Steel (ft) 41.80 36.80 38.40 41 .90 40.1 0
Time Drillina was Completed (am 10m) 8 :2 7 AM 9 :2 0 A M 8 :44 A M 10:06AM 1 0 :2 4 AM
Time Concrete was Placed (am /pm) 9:30 AM 10:15AM 1 0 :50 AM 11:15AM 11:55AM
D e p th 0 f P ie r F ro m Top 0 f Con c re te ( ft) 42.50 37.50 39.20 42.50 40.80
Elevation: Surface (ft)** 95.50 95.50 95.50 95.50 95.50
Elevation: Top of Pier (ft)** 95.00 95.00 95.00 95.00 95.00
Elevation: Bottom of Pier (ft)** 52.50 57.50 55.80 52.50 54.20
Elevation: Top of Bearing Stratum (ft.)** 59.30 63.00 61 .30 58.50 60.50
Searina Stratum (descriotion) B lu e s h a Ie
Note:See report# NA forCompressive StrengthTestSpecimens.
'Additional Penetration not requested unless noted. **Elevation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 3
Rone Eni==
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 301460
Project No.: 0712932
Date of Service: 10/09/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
D ri lie r: Auger
Pier Identification A 121.2 A 121 .8 A 12 2.2 A 12 2 .8 A 12 3.2
PierDiameterlinl 30 30 30 30 30
Depth of Pier From Surface 1ft) 40.00 40.50 38.70 40.30 40.50
Depth of Bear in a Stratum Fro m Surface Ift\ 34.90 35.00 33.20 35.00 34.50
Reauired Penetration Ift\ 5.00 5.00 5.00 5.00 5.00
A ctua I P e ne tra tio n (fll' 5.1 0 5.50 5.50 5.30 6.00
Condition of Bottom Iwet/drv) D rv Dry D rv D rv D rv
Plumb Within Tolerance Ives Ino) Yes Yes Yes Yes Yes
Casing Diameterlin\/Casina Length (ft) 32/34.5 32/35 3 2 13 3 .2 32/34.7 3 2 13 4
NumberofBars IReinforcina BarSize 8 1#6 8 1#6 8 1#6 8 1#6 8 1#6
Length of Reinforcina Steel 1ft) 38.80 39.30 37.50 39.00 39.20
Time Drillina was Comoleted lam loml 10:43AM 11:09AM 1 1 :29 A M 11:55AM 1 2 :2 5 P M
Tim e Con c re te was P la c e d (a miD m ) 1 2 :24 PM 1 :20 P M 2 :00 PM 2:13 PM 2 :40 P M
Depth of Pier From Too of Concrete (ft) 39.50 40.00 38.20 39.80 40.00
E Ie va tio n: S u rfa ce (ft).. 95.50 95.50 95.50 95.50 95.50
Elevation: Too of Pier (ft)" 9 5.00 95.00 95.00 95.00 95.00
Elevation: Bottom of Pier 1m" 55.50 55.00 56.80 55.20 55.00
E Ie va ti 0 n: Too of Bear in a Stratum (ft.)" 60.60 60.50 62.30 60.50 61 .00
Bearina Stratum (descrintion\ B lu e s h a Ie
Note: See re port /I NA for Com pressive Strength Test Specimens.
'Additional Penetration not requested unless noted. UE levation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 2 of 3
Rone En~==
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 301460
Project No.: 0712932
Date of Service: 10/09/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: Auaer
Pie rid e ntifica tio n A 12 3.8 A /2 4.2 A /2 4 .8 A /2 5 .2 A /2 5 .8
PierDiameter(in) 30 30 30 30 30
Depth of Pier From Surface(ft) 39.30 40.80 41 .30 43.30 44.20
Depth of Bearing Stratum Fro m Surface(ft) 34.30 34.20 36.20 37.50 37.00
R e qui red Pen e t rat ion (ft) 5.00 5.00 5.00 5.00 5.00
A ctua I P e ne tra tio n (ft)" 5.00 6.60 5.10 5.80 7.20
Condition of Bottom (wet/dry) Dry Dry Dry Dry Dry
Plum b Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter(in)/Casing Length (ft) 32/34 32/34.2 3 2 /3 6 .1 32/36 32/37
NumberofBars /Reinforcing BarSize 8 1 #6 8 1 # 6 8 / # 6 8 / # 6 8 / #6
Le n~llh of R e info rcing S te e I (ft) 38.10 39.60 40.00 42.1 0 43.00
Tim e Drilling was Com oleted lam 1 pm) 1:27 PM 1 :50 PM 2 :2 7 P M 2:54 PM 3 :3 0 P M
Tim e Con c re te was P la c e d (a m / pm) 3 :00 PM 3:34 PM 4 :0 9 PM 4 :4 0 P M 5:10 PM
Depth of Pier F rom Top of Concrete (ft) 38.80 40.30 40.80 42.80 43.70
Elevation: Surface (ft).. 95.50 95.50 95.50 95.50 95.50
Elevation: Top of Pier (ft)"" 95.00 95.00 95.00 95.00 95.00
E Ie va tio n: Bolla m of Pier 1ft).. 56.20 54.70 54.20 52.20 51.30
Elevation: Top of Bearing Stratum (ft.)" " 61 .20 61 .30 59.30 58.00 58.50
Bearina Stratum Idescription) Blue shale
Note See re port # NA fo reo m pre s s ive S t re n 9 t h T est S pee i men s .
. Additional Penetration not requested unless noted. UE levation by others
Technician: Chris Harbour Started: 06:00am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Alln: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Alln: Mr. Lee Stone
1-cc City of Coppell Alln: Mr. Larry Davis
Finished: 06:00pm Rone Engineering
~~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 3 of 3
Rone En~~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Com pressive Strength Test
Report No.: 301461
Project No.: 0712932
Date of Service: 10/09/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 3,000 psi @ 28 days
Slump (in.): NA
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 7751 PW
Placement Date: 10/09/2007
Weather Conditions: Clear
Time Sampled: 09:05am
Temperature - Air: 820F
Truck No: 129
Air Content: NA
Overall Placement Location:
Piers (see report #301460)
Batch time: 08:27am
Concrete: 850F
Ticket No: 14623
Unit Weight (pet): NA
Measured
Slump
(inches)
6.0
Sample Location:
Pier A/15.8
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 10/16/2007 7 6.00 28.27 83,560 2,960 Shear
1 2 10/16/2007 7 6.00 28.27 87,030 3,080 Cone/Split
Average 3,020
1 3 11/06/2007 28
1 4 11/06/2007 28
1 5 12/04/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/KW) Page 1 of 2
Rone En~==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 301461
Project No.: 0712932
Date of Service: 10/09/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 3,000 psi @ 28 days
Slump (in.): NA
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 7751 PW
Placement Date: 10/09/2007
Weather Conditions: Clear
Time Sampled: 04:10pm
Temperature - Air: 870F
Truck No: 129
Air Content: NA
Overall Placement Location:
Piers (see report #301460)
Batch time: 03:23pm
Concrete: 880F
Ticket No: 14668
Unit Weight (pcf): NA
Measured
Slump
(inches)
6.75
Sample Location:
Pier A/29.8
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
2 1 10/16/2007 7 6.00 28.27 92,610 3,280 Cone/Shear
2 2 10/16/2007 7 6.00 28.27 97,560 3,450 Shear
Average 3,360
2 3 11/06/2007 28
2 4 11/06/2007 28
2 5 12/04/2007 56
Technician: Chris Harbour Rone Engineering
See Report 301460 for technician time~ ~
Report Distribution: ~
Orig: Duke Construction, LP (Dallas, TX) Altn: Mr. Paul Byrne .
(1-ec copy)
1-cc Polter Concrete Altn: Mr. Ryan Skel!y K. Scott Watson, AET
1-cc City of Coppel! Altn: Mr. Lee Stone Project Manager
1-cc City of Coppel! Altn: Mr. Larry Davis
~
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd.
(TM/KW) Page 2 of 2
Rone Eni~
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Reinforcing Steel Inspection
Report No.: 301901
Project No.: 0712932
Date of Service: 10/11/2007
Report Date: 10/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Reinforcing Steel Inspection
Report of Inspection
Locations and Items Inspected:
Paving, north truck parking from northwest corner of parking
lot 500' east and 90' south
Item s Inspected: Conforming Non Item s Inspected Co nfo rm ing Non Items Inspected Co nfo rming Non
Conforming Conforming Co nfo rm ing
Placing Drawings Bar Length Column Ties Properly
Appro ved x and Shape x Tied and Spaced NA
Bar Size x Pro per B ar P lacament x Stirrup Spacing NA
Bar Grade x Pro perly Tied x Stirrup Type NA
Bars Clean x Dowel Bars in Place x Lapped Splices x
Form Clean x Pro per B ar Suppa rts NA CamerBars NA
N urn bar of Bars x ProparCovar NA Mechanical Splices NA
Discrepancies / Comments:
1. Chairs to be placed during concrete placement.
Technician: Chris Harbour Rone Engineering
See Report 301763 for technician time~~
Report Distribution:~
0';'0 ~"~~ ::p~~"uct;O", LP (0,,,.., TX) AU, M'. P,"' Bym. .. '.. . - - -- . -=--
1-cc City of Coppell Altn: Mr. Lee Stone K Scott Watson AET
1-cc City of Coppell Altn: Mr. Larry Davis . Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/KW) Page 1 of 1