Loading...
Duke Lesley 2A-LR071017 Rone Eni== Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, 8te 600, Houston, TX 77040 4421 Freidrich, 8te 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 301306 Project No.: 0712932 Date of Service: 10/08/2007 Report Date: 10/17/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,500 psi @ 28 days Slump (in.): 3" - 5" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 9349 PW Placement Date: 10/08/2007 Weather Conditions: Cloudy Time Sampled: 07:55am Temperature - Air: 760F Truck No: 143 Air Content: NA Overall Placement Location: Slab on building, grid lines G-J/26.9-30 Batch time: 07:37am Concrete: 800F Ticket No: 14530 Unit Weight (pet): NA Measured Slump (inches) 5.0 Sample Location: Grid lines G.3/27.5 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 10/15/2007 7 6.00 28.27 109,610 3,880 Cone/Split 1 2 11/05/2007 28 1 3 11/05/2007 28 1 4 12/03/2007 56 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 1 of 4 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas. TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 301306 Project No.: 0712932 Date of Service: 10/08/2007 Report Date: 10/17/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,500 psi @ 28 days Slump (in.): 3" - 5" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 9349 PW Placement Date: 10/08/2007 Weather Conditions: Cloudy Time Sampled: 08:48am Temperature - Air: 760F Truck No: 133 Air Content: NA Overall Placement Location: Slab on building, grid lines G-J/26.9-30 Sample Location: Grid lines G.2/28.6 REPORT OF TESTS Batch time: 08:33am Concrete: 810F Ticket No: 14540 Unit Weight (pet): NA Measured Slump (inches) 4.75 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 123,490 Cylinder Marked Date Set No. Tested 2 1 10/15/2007 2 2 11/05/2007 2 3 11/05/2007 2 4 12/03/2007 Age (days) 7 Diameter (in) 6.00 28 28 56 Area (in2) 28.27 Compressive Strength (psi) 4,370 Fracture Type Cone/Split LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 2 of 4 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 301306 Project No.: 0712932 Date of Service: 10/08/2007 Report Date: 10/17/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,500 psi @ 28 days Slump (in.): 3" - 5" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 9349 PW Placement Date: 10/08/2007 Weather Conditions: Cloudy Time Sampled: 10:30am Temperature - Air: 760F Truck No: 143 Air Content: NA Overall Placement Location: Slab on building, grid lines G-J/26.9-30 Batch time: 10:21am Concrete: 830F Ticket No: 14554 Unit Weight (pet): NA Measured Slump (inches) 4.0 Sample Location: Grid lines H.1/29.8 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 3 1 10/15/2007 7 6.00 28.27 113,500 4,010 Cone/Split 3 2 11/05/2007 28 3 3 11/05/2007 28 3 4 12/03/2007 56 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 3 of 4 Rone En2== Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 301306 Project No.: 0712932 Date of Service: 10/08/2007 Report Date: 10/17/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,500 psi @ 28 days Slump (in.): 3" - 5" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 9349 PW Placement Date: 10/08/2007 Weather Conditions: Cloudy Time Sampled: 1 0:49am Temperature - Air: 810F Truck No: 133 Air Content: NA Overall Placement Location: Slab on building, grid lines G-J/26.9-30 Sample Location: Grid lines G/29.9 REPORT OF TESTS Batch time: 10:34am Concrete: 860F Ticket No: 14556 Unit Weight (pet): NA Measured Slump (inches) 4.5 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 97,890 Cylinder Marked Date Set No. Tested 4 1 10/15/2007 4 2 11/05/2007 4 3 11/05/2007 4 4 12/03/2007 Age (days) 7 Diameter (in) 6.00 28 28 56 Technician: Brad Hickman Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byme (1-ec copy) 1-cc Potter Concrete Attn: Mr. Ryan Skelly 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Area (in') 28.27 Started: 06:15am Finished: 12:15pm Compressive Strength (psi) 3,460 Fracture Type Cone/Split Rone Engineering p~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 4 of 4 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 298875 Project No.: 0712932 Date of Service: 09/17/2007 Report Date: 10/17/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Req uirements Strength: 3,000 psi @ 28 days Slump (in.): NA Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7751 PW Placement Date: 09/17/2007 Weather Conditions: Clear Time Sampled: 09:37am Temperature - Air: 840F Truck No: 117 Air Content: NA Overall Placement Location: Building piers C/26-28, B/26-28, D-H/17 Batch time: 09:20am Concrete: 870F Ticket No: 7399 Unit Weight (pet): NA Measured Slump (inches) 5.5 Sample Location: Building pier C/26 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 09/24/2007 7 6.00 28.27 104,690 3,700 Shear 1 2 10/15/2007 28 6.00 28.27 144,880 5,120 Cone/Shear 1 3 10/15/2007 28 6.00 28.27 135,800 4,800 Shear Average 4,960 1 4 11/12/2007 56 1 5 11/12/2007 56 Remarks: Water added at site: 20 gallons (before sample) Technician: Chris Harbour Rone Engineering See Report 298874 for technician time~~ Report Distribution: ---..... Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne . .. ~ (1-ec copy) - 1-cc Potter Concrete Attn: Mr. Ryan Skelly K, Scott Watson AET 1-cc City of Coppell Attn: Mr. Lee Stone P 'eel M ' 1-cc City of Cop pel! Attn: Mr. Larry Davis ro] anager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 301291 Project No.: 0712932 Date of Service: 10/08/2007 Report Date: 10/17/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): NA Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7751 PW Placement Date: 10/08/2007 Weather Conditions: Partly cloudy Time Sampled: 09:20am Batch time: 09:11am Temperature - Air: 800F Concrete: 890F Truck No: 136 Ticket No: 14599 Air Content: NA Unit Weight (pet): NA Overall Placement Location: Piers (see report #301290) Measured Slump (inches) 6.75 Sample Location: Pier A/12.8 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 10/15/2007 7 6.00 28.27 105,980 3,750 Cone/Split 1 2 10/15/2007 7 6.00 28.27 98,820 3,500 Shear Average 3,620 1 3 11/05/2007 28 1 4 11/05/2007 28 5 12/03/2007 56 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 1 of 2 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 301291 Project No.: 0712932 Date of Service: 10/08/2007 Report Date: 10/17/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): NA Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7751 PW Placement Date: 10/08/2007 Weather Conditions: Partly cloudy Time Sampled: 03:15pm Batch time: 02:48pm Temperature - Air: 860F Concrete: 900F Truck No: 127 Ticket No: 14569 Air Content: NA Unit Weight (pet): NA Overall Placement Location: Piers (see report #301290) Measured Slump (inches) 7.25 Sample Location: Pier A/17.8 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 2 1 10/15/2007 7 6.00 28.27 99,290 3,510 Shear 2 2 10/15/2007 7 6.00 28.27 98,220 3,470 Shear Average 3,490 2 3 11/05/2007 28 2 4 11/05/2007 28 2 5 12/03/2007 56 Technician: Chris Harbour Rone Engineering See Report 301290 for technician time~ ~. Report Distribution: ~ Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne . . . (1-ec copy) 1-cc Potter Concrete Attn: Mr. Ryan Skelly K. Seott Watson, AET 1-cc C~ty of Coppell Attn: Mr. Lee Stone. Pro'eet Manager 1-cc City of Coppell Attn: Mr. Larry DaVIS J ~ LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlKW) Page 2 of 2