Loading...
Duke Lesley 2A-LR071013 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, 8te 600, Houston, TX 77040 4421 Freidrich, 8te 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 301435 Project No.: 0712932 Date of Service: 10/08/2007 Report Date: 10/13/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Building pad, slab on grade, grid lines C-E/21-29.9 Item s Ins peeled: Co nto rming Non Item s Ins peeled: Co nfo rm ing Non Items Inspected: Conforming Non Co nforming Co nfo rm ing Co nfo rming Placing Drawings Bar Lenglh Column Ties Properly Approved x and Shape x Tied and Spaced NA Bar Size x Proper Bar P laeam ant x Stirrup Spacing NA Bar Grade x Properly Tied x Stirrup Type NA Bars Clean x Dowel Bars in Place x Lapped Splices x Form Clean x Pro per B ar Suppo rts NA Co mer Bars NA NumberofBars x ProperCover NA Mechanical Splices NA Discrepancies / Comments: 1, Chairs to be placed during concrete placement. Technician: Chris Harbour Rone Engineering See Report 301290 for technician time~~ Report Distribution:~ Orig: Duke Construction, LP (Dallas, TX) Artn: Mr. Paul Byrne .. ... ... . . ~. (1-ec copy) 1-cc City of Coppell Artn: Mr. Lee Stone K. Scott Watson AET 1-cc City of Coppell Attn: Mr. Larry Davis p . ct M ' rOJe anager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/LB) Page 1 of 1