Loading...
Duke Lesley 2A-LR071006 Rone En~== 8908 Ambassador Row, Dallas, TX 15241 1101 W Little York, Ste 600, Houston, TX 11040 4421 Freidrich, Ste 195, Austin, TX 18144 Corporate Phone: (214) 630-9145 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 299069 Project No.: 0712932 Date of Service: 09/18/2007 Report Date: 10/06/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Perform In-Place Density Testing PROJECT DATA Contractor: Duke Construction, LP Test Method: ASTM D-6938 Gauge: Troxler 3430 Gauge Serial No: 35518 Test Mode: DT Standard Counts Moisture Density Current: 739 Current: 2505 Previous: 739 Previous: 2519 MOISTURE DENSITY RELATIONS M/D No. 272998 Description Brown I Silty Clay wI Organics Maximum Moisture Density Project Requirements % (pet) Moisture Density 22.5 96.5 Optimum +4 95 min FIELD DENSITY TESTS Probe MID Moisture Wet Density Dry Density Density Depth No. % (pet) (pet) (% max) 6" 272998 24.2 116.4 93.7 97 6" 272998 24.8 115.3 92.4 96 6" 272998 25.5 115.8 92.3 96 6" 272998 22.8 115.7 94.2 98 6" 272998 24.7 115.2 92.4 96 6" 272998 24.1 114.8 92.5 96 6" 272998 24.8 115.2 92.3 96 6" 272998 26.0 115.2 91.4 95 Test No Test Location Trench fill - electric line Station 6+80,3' below grade Trench fill - electric line 2 Station 6+80, 2' below grade Trench fill - electric line 3 Station 6+80, l' below grade Trench fill - electric line 4 Station 6+80, final Trench fill - electric line 5 Station 6+80, 3' below grade Trench fill . electric line 6 Station 6+80, 2' below grade Trench fill - electric line 7 Station 6+80, l' below grade Trench fill - electric line 8 Station 6+80, final Technician: Joe Jernigan Started: 11 :45am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Finished: 01 :30pm Rone Engineering V~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 1 of 1