Duke Lesley 2A-LR071025
Rone Eni==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300683
Project No.: 0712932
Date of Service: 10/02/2007
Report Date: 10/25/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (0/0): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349
Placement Date: 10/02/2007
Weather Conditions: Cloudy
Time Sampled: 03:55pm
Temperature - Air: 780F
Truck No: 102
Air Content: NA
Overall Placement Location:
Slab, gridlines C-E and 11-21
Sample Location:
C,O,E/Line 11-12
REPORT OF TESTS
Batch time: 03:42pm
Concrete: 900F
Ticket No: 14247
Unit Weight (pct): NA
Measured
Slump
(inches)
7.0
Concrete Compressive Cylinder 6" x 12"
Maximum
Load
(Ibs)
101,870
Cylinder
Marked Date
Set No. Tested
1 1 10/09/2007
1 2 10/30/2007
1 3 10/30/2007
4 11/27/2007
Age
(days)
7
Diameter
(in)
6.00
28
28
56
Area
(in2)
28.27
Compressive
Strength
(psi)
3,600
Fracture
Type
Shear
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd.
(KWIKW) Page 1 of 10
Rone Eni~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300683
Project No.: 0712932
Date of Service: 10/02/2007
Report Date: 10/25/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349
Placement Date: 10/02/2007
Weather Conditions: Cloudy
Time Sampled: 05:00am
Temperature - Air: 780F
Truck No: 130
Air Content: NA
Overall Placement Location:
Slab, gridlines C-E and 11-21
Batch time: 04:38am
Concrete: 900F
Ticket No: 14257
Unit Weight (pet): NA
Measured
Slump
(inches)
6.0
Sample Location:
C,D,E/Line 12-12.9
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
2 1 10/09/2007 7 6.00 28.27 101,360 3,580 Cone/Split
2 2 10/30/2007 28
2 3 10/30/2007 28
2 4 11/27/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 2 of 10
Rone En2~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300683
Project No.: 0712932
Date of Service: 10/02/2007
Report Date: 10/25/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349
Placement Date: 10/02/2007
Weather Conditions: Cloudy
Time Sampled: 05:45am
Temperature - Air: 780F
Truck No: 138
Air Content: NA
Overall Placement Location:
Slab, grid lines C-E and 11-21
Sample Location:
C,D,E/Line 12.9-13.8
REPORT OF TESTS
Batch time: 05:34am
Concrete: 880F
Ticket No: 14267
Unit Weight (pcf): NA
Measured
Slump
(inches)
6.0
Concrete Compressive Cylinder 6" x 12"
Maximum
Load
(Ibs)
119,690
Cylinder
Marked Date
Set No. Tested
3 1 10/09/2007
3 2 10/30/2007
3 3 10/30/2007
3 4 11/27/2007
Age
(days)
7
Diameter
(in)
6.00
28
28
56
Area
(in')
28.27
Compressive
Strength
(psi)
4,230
Fracture
Type
Cone/Split
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 3 of 10
Rone En~=:i
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300683
Project No.: 0712932
Date of Service: 10/02/2007
Report Date: 10/25/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1 064
ASTM C-138
ASTM C-39
PROJECT OAT A
Mix Design 1.0.: 9349
Placement Date: 10/02/2007
Weather Conditions: Cloudy
Time Sampled: 07:00am
Temperature - Air: 800F
Truck No: 102
Air Content: NA
Overall Placement Location:
Slab, gridlines C-E and 11-21
Batch time: 06:40am
Concrete: 920F
Ticket No: 14277
Unit Weight (pet): NA
Measured
Slump
(inches)
5.0
Sample Location:
C,D,E/Line 13.8-14.8
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (In) (in') (Ibs) (psi) Type
4 1 10/09/2007 7 6.00 28.27 123,210 4,360 Cone/Split
4 2 10/30/2007 28
4 3 10/30/2007 28
4 4 11/27/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 4 of 10
Rone Eni~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300683
Project No.: 0712932
Date of Service: 10/02/2007
Report Date: 10/25/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Req u irements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349
Placement Date: 10/02/2007
Weather Conditions: Sunny
Time Sampled: 08:00am
Temperature - Air: 800F
Truck No: 130
Air Content: NA
Overall Placement Location:
Slab, grid lines C-E and 11-21
Batch time: 07:36am
Concrete: 880F
Ticket No: 14287
Unit Weight (pcf): NA
Measured
Slump
(inches)
5.0
Sample Location:
C,O,E/Line 14.8-15.9
REPORT OF TESTS
Cylinder
Marked Date
Set No. Tested
5 1 10/09/2007
5 2 10/30/2007
5 3 10/30/2007
5 4 11/27/2007
Age
(days)
7
Diameter
(in)
6.00
28
28
56
Concrete Compressive Cylinder 6" x 12"
Maximum
Load
(Ibs)
114,750
Compressive
Strength
(psi)
4,060
Fracture
Type
Cone/Split
Area
(in')
28.27
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 5 of 10
Rone En2~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300683
Project No.: 0712932
Date of Service: 10/02/2007
Report Date: 10/25/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349
Placement Date: 10/02/2007
Weather Conditions: Sunny
Time Sampled: 09:40am
Temperature - Air: 800F
Truck No: 138
Air Content: NA
Overall Placement Location:
Slab, gridlines C-E and 11-21
Batch time: 09:24am
Concrete: 900F
Ticket No: 14299
Unit Weight (pcf): NA
Measured
Slump
(inches)
6.0
Sample Location:
C,D,E/Line 15.9-16.8
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
6 1 10/09/2007 7 6.00 28.27 114,540 4,050 Cone/Split
6 2 10/30/2007 28
6 3 10/30/2007 28
6 4 11/27/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 6 of 10
Rone Eni==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300683
Project No.: 0712932
Date of Service: 10/02/2007
Report Date: 10/25/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349
Placement Date: 10/02/2007
Weather Conditions: Sunny
Time Sampled: 10:30am
Temperature - Air: 840F
Truck No: 138
Air Content: NA
Overall Placement Location:
Slab, grid lines C-E and 11-21
Batch time: 10:22am
Concrete: 880F
Ticket No: 14309
Unit Weight (pet): NA
Measured
Slump
(inches)
6.0
Sample Location:
C,D,E/Line 16.8-18
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (inZ) (Ibs) (psi) Type
7 1 10/09/2007 7 6.00 28.27 109,340 3,870 Cone/Split
7 2 10/30/2007 28
7 3 10/30/2007 28
7 4 11/27/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 7 of 10
Rone En~~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300683
Project No.: 0712932
Date of Service: 10/02/2007
Report Date: 10/25/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349
Placement Date: 10/02/2007
Weather Conditions: Sunny
Time Sampled: 11 :45am
Temperature - Air: 860F
Truck No: 102
Air Content: NA
Overall Placement Location:
Slab, gridlines C-E and 11-21
Batch time: 11 :28am
Concrete: 900F
Ticket No: 14321
Unit Weight (pcf): NA
Measured
Slump
(inches)
7.0
Sample Location:
C,D,E/Line 18-19.2
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
8 1 10/09/2007 7 6.00 28.27 101,180 3,580 Cone/Split
8 2 10/30/2007 28
8 3 10/30/2007 28
8 4 11/27/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 8 of 10
Rone En2~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300683
Project No.: 0712932
Date of Service: 10/02/2007
Report Date: 10/25/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349
Placement Date: 10/02/2007
Weather Conditions: Sunny
Time Sampled: 12:45pm
Temperature - Air: 880F
Truck No: 134
Air Content: NA
Overall Placement Location:
Slab, gridlines C-E and 11-21
Batch time: 12:28pm
Concrete: 900F
Ticket No: 14331
Unit Weight (pcf): NA
Measured
Slump
(inches)
6.0
Sample Location:
C,D,E/Line 19.2-20.4
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (In) (in') (Ibs) (psi) Type
9 1 10/09/2007 7 6.00 28.27 97,930 3,460 Cone/Split
9 2 10/30/2007 28
9 3 10/30/2007 28
9 4 11/27/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 9 of 10
Rone Eni~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300683
Project No.: 0712932
Date of Service: 10/02/2007
Report Date: 10/25/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (0/0): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349
Placement Date: 10/02/2007
Weather Conditions: Sunny
Time Sampled: 01 :30pm
Temperature - Air: 880F
Truck No: 134
Air Content: NA
Overall Placement Location:
Slab, gridlines C-E and 11-21
Batch time: 01:19pm
Concrete: 920F
Ticket No: 14338
Unit Weight (pct): NA
Measured
Slump
(inches)
5.0
Sample Location:
C,D,E/Line 20.4-21
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength
Set No. Tested (days) (in) (in') (Ibs) (psi)
10 1 10/09/2007 7 6.00 28.27 109,370 3,870
10 2 10/30/2007 28
10 3 10/30/2007 28
10 4 11/27/2007 56
Fracture
Type
Cone/Split
Started: 02:30am Finished: 02:15pm
Technician: Denny Harris
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Altn: Mr. Paul Byrne
(1-ec copy)
1-cc Potter Concrete Altn: Mr. Ryan Skelly
1-cc City of Coppell Altn: Mr. Lee Stone
1-cc City of Coppell Altn: Mr. Larry Davis
Rone Engineering
p~
::;>
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KWIKW) Page 10 of 10
Rone Eni~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300662
Project No.: 0712932
Date of Service: 10/02/2007
Report Date: 10/25/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 3,000 psi @ 28 days
Slump (in.): NA
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 7751 PW
Placement Date: 10/02/2007
Weather Conditions: Few clouds
Time Sampled: 10:15am Batch time: 09:13am
Temperature - Air: 800F Concrete: 820F
Truck No: 109 Ticket No: 14297
Air Content: NA Unit Weight (pet): NA
Overall Placement Location:
Building piers U9.8, K.7/0.9, K.210.9, J.8/0.9, H.8, H.2, G.8/1
Measured
Slump
(inches)
6.75
Sample Location:
Pier US.8
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
1 1 10/09/2007 7 6.00 28.27 91,690 3,240 Cone/Split
1 2 10/09/2007 7 6.00 28.27 91,480 3,240 Cone/Split
Average 3,240
1 3 10/30/2007 28
1 4 10/30/2007 28
1 5 11/27/2007 56
Technician: Chris Harbour Rone Engineering
See Report 300661 for technician time~ ~
~~~: ....~ ~
Orig: Duke Construction, LP (Dallas, TX) Altn: Mr. Paul Byrne . ~
(1-ec copy) -
1-cc P~tter Concrete Altn: Mr. Ryan Skelly K. Scott Watson AET
1-cc City of Coppel! Altn: Mr. Lee Stone p . t M '
1-cc City of Coppel! Altn: Mr. Larry Davis roJec anager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 1
Rone Eni~
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Reinforcing Steel Inspection
Report No.: 302381
Project No.: 0712932
Date of Service: 10/18/2007
Report Date: 10/25/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Reinforcing Steel Inspection
Report of Inspection
Locations and Items Inspected:
Tilt wall panels P109, P138, P143-P146, P148-P152
Item s Inspected. Conforming Non Items Inspected: Conform ing Non Item sins pected: Co nlo rm ing Non
Conforming Conforming Co nlo rm ing
Placing Drawings B er Length Column Ties Properly
Appro ved x and Shape x Tied and Spaced NA
B sr Size x P fO per B sr P Iscem ent x Stirrup Spacing x
B sr Grade x Properly Tied x Stirrup Type x
Bars Clean x Dowel Bars in Place x Lepped Splices x
Form Clean x ProperBarSupports x CornerBars x
Numberof Bars x ProperCol/er x Mechanical Splices NA
Discrepancies / Comments: 1. Remove loose debris from placement area.
2. Slab dowels are missing.
3. Add chairs.
Discrepancies noted above were corrected prior to concrete placement.
Technician: Jose Villanueva Started: 12:30pm
Report Distribution:
Orig: Duke Construction. LP (Dallas, TX) Alln: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Alln: Mr. Lee Stone
1-cc City of Coppell Alln: Mr. Larry Davis
Finished: 03:00pm Rone Engineering
p~
;:;;>
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/KW) Page 1 of 1