Duke Lesley 2A-LR071023
Rone En~==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299500
Project No.: 0712932
Date of Service: 09/21/2007
Report Date: 10/23/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349 PW
Placement Date: 09/21/2007
Weather Conditions: Cloudy, calm
Time Sampled: 03:30am Batch time: 02:53am
Temperature - Air: 780F Concrete: 900F
Truck No: 140 Ticket No: 13742
Air Content: NA Unit Weight (pet): NA
Overall Placement Location:
A, B, C I Lines 11-21
Measured
Slump
(inches)
5.0
Sample Location:
A, B, C, Lines 11-12
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
1 1 09/28/2007 7 6.00 28.27 111 , 180 3,930 Cone/Split
2 10/19/2007 28 6.00 28.27 133,990 4,740 Cone/Split
3 10/19/2007 28 6.00 28.27 132,770 4,700 Cone/Split
Average 4,720
4 11/16/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 11
Rone En~~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299500
Project No.: 0712932
Date of Service: 09/21/2007
Report Date: 10/23/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test MethOd: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349 PW
Placement Date: 09/21/2007
Weather Conditions: Cloudy, calm
Time Sampled: 04:38am Batch time:
Temperature - Air: 780F Concrete: 920F
Truck No: 136 Ticket No: 7548
Air Content: NA Unit Weight (pcf): NA
Overall Placement Location:
A, B, C / Lines 11-21
Measured
Slump
(inches)
4.0
Sample Location:
A, B, C, Lines 12-13
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
2 1 09/28/2007 7 6.00 28.27 111,400 3,940 Cone/Split
2 2 10/19/2007 28 6.00 28.27 138,420 4,900 Cone/Split
2 3 10/19/2007 28 6.00 28.27 136,000 4,810 Cone/Split
Average 4,850
2 4 11/16/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 2 of 11
Rone Eni==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299500
Project No.: 0712932
Date of Service: 09/21/2007
Report Date: 10/23/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Req u irements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349 PW
Placement Date: 09/21/2007
Weather Conditions: Cloudy, calm
Time Sampled: 05:10am Batch time: 03:51am
Temperature - Air: 780F Concrete: 880F
Truck No: 117 Ticket No: 7547
Air Content: NA Unit Weight (pcf): NA
Overall Placement Location:
A, S, C I Lines 11-21
Measured
Slump
(inches)
6.0
Sample Location:
A, S, C, Lines 13-14
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
3 1 09/28/2007 7 6.00 28.27 90,840 3,210 Cone/Shear
3 2 10/19/2007 28 6.00 28.27 116,090 4,110 Cone/Split
3 3 10/19/2007 28 6.00 28.27 115,400 4,080 Shear
Average 4,090
3 4 11/16/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 3 of 11
Rone En2~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299500
Project No.: 0712932
Date of Service: 09/21/2007
Report Date: 10/23/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349 PW
Placement Date: 09/21/2007
Weather Conditions: Cloudy, calm
Time Sampled: 06:15am Batch time: 05:09am
Temperature - Air: 800F Concrete: 900F
Truck No: 136 Ticket No: 7534
Air Content: NA Unit Weight (pct): NA
Overall Placement Location:
A, 8, C I Lines 11-21
Measured
Slump
(inches)
6.0
Sam pie Location:
A, 8, C, Lines 14-15
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
4 1 09/28/2007 7 6.00 28.27 96,740 3,420 Cone/Shear
4 2 10/19/2007 28 6.00 28.27 123,090 4,350 Shear
4 3 10/19/2007 28 6.00 28.27 117,210 4,150 Shear
Average 4,250
4 4 11/16/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 4 of 11
Rone En~==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299500
Project No.: 0712932
Date of Service: 09/21/2007
Report Date: 10/23/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349 PW
Placement Date: 09/21/2007
Weather Conditions: Cloudy
Time Sampled: 07:15am
Temperature - Air: 800F
Truck No: 110
Air Content: NA
Overall Placement Location:
A, S, C I Lines 11-21
Batch time: 07:06am
Concrete: 880F
Ticket No: 13775
Unit Weight (pcf): NA
Measured
Slump
(inches)
6.0
Sample Location:
A, S, C, Lines 15-16
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
5 1 09/28/2007 7 6.00 28.27 104,690 3,700 Cone/Shear
5 2 10/19/2007 28 6.00 28.27 123,510 4,370 Cone/Split
5 3 10/19/2007 28 6.00 28.27 130,160 4,600 Cone/Shear
Average 4,490
5 4 11/16/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 5 of 11
Rone Eni==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299500
Project No.: 0712932
Date of Service: 09/21/2007
Report Date: 10/23/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349 PW
Placement Date: 09/21/2007
Weather Conditions: Sunny, cloudy
Time Sampled: 08: 1 Oam Batch time: 07:40am
Temperature - Air: 800F Concrete: 880F
Truck No: 138 Ticket No: 13781
Air Content: NA Unit Weight (pcf): NA
Overall Placement Location:
A, S, C / Lines 11-21
Measured
Slump
(inches)
7.0
Sample Location:
A, S, C, Lines 16-17
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
6 1 09/28/2007 7 6.00 28.27 91,540 3,240 Cone/Split
6 2 10/19/2007 28 6.00 28.27 113,160 4,000 Cone/Split
6 3 10/19/2007 28 6.00 28.27 123,390 4,360 Cone/Split
Average 4,180
6 4 11/16/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 6 of 11
Rone En~==
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Com pressive Strength Test
Report No.: 299500
Project No.: 0712932
Date of Service: 09/21/2007
Report Date: 10/23/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Req u irements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349 PW
Placement Date: 09/21/2007
Weather Conditions: Sunny
Time Sampled: 08:30am
Temperature - Air: 820F
Truck No: 128
Air Content: NA
Overall Placement Location:
A, B, C I Lines 11-21
Batch time: 08:14am
Concrete: 860F
Ticket No: 13788
Unit Weight (pcf): NA
Measured
Slump
(inches)
7.0
Sample Location:
A, B, C, Lines 18-19
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
7 1 09/28/2007 7 6.00 28.27 108,950 3,850 Cone/Split
7 2 10/19/2007 28 6.00 28.27 132,910 4,700 Cone/Split
7 3 10/19/2007 28 6.00 28.27 136,860 4,840 Cone/Split
Average 4,770
7 4 11/16/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 7 of 11
Rone En~==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299500
Project No.: 0712932
Date of Service: 09/21/2007
Report Date: 10/23/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349 PW
Placement Date: 09/21/2007
Weather Conditions: Sunny
Time Sampled: 09:50am
Temperature - Air: 840F
Truck No: 117
Air Content: NA
Overall Placement Location:
A, B, C I Lines 11-21
Batch time: 09:00am
Concrete: 880F
Ticket No: 7569
Unit Weight (pcf): NA
Measured
Slump
(inches)
5.0
Sample Location:
A, B, C, Lines 19-19.8
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
8 1 09/28/2007 7 6.00 28.27 103,510 3,660 Cone/Split
8 2 10/19/2007 28 6.00 28.27 129,330 4,570 Cone/Split
8 3 10/19/2007 28 6.00 28.27 119,060 4,210 Cone/Split
Average 4,390
8 4 11/16/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 8 of 11
Rone En~==
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 15241
1101 W Little York, Ste 600, Houston, TX 11040
4421 Freldrlch, Ste 195, Austin, TX 18144
Corporate Phone: (214)630-9145
Report of Concrete Compressive Strength Test
Report No.: 299500
Project No.: 0712932
Date of Service: 09/21/2007
Report Date: 10/23/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349 PW
Placement Date: 09/21/2007
Weather Conditions: Sunny
Time Sampled: 1 0:45am
Temperature - Air: 860F
Truck No: 138
Air Content: NA
Overall Placement Location:
A, S, C I Lines 11-21
Batch time: 10:33am
Concrete: 900F
Ticket No: 13801
Unit Weight (pet): NA
Measured
Slump
(inches)
4.0
Sample Location:
A, S, C, Lines 19.8-20.4
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
9 1 09/28/2007 7 6.00 28.27 104,430 3,690 Cone/Split
9 2 10/19/2007 28 6.00 28.27 127,340 4,500 Cone/Split
9 3 10/19/2007 28 6.00 28.27 132,140 4,670 Cone/Split
Average 4,590
9 4 11/16/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 9 of 11
Rone En2=::;
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299500
Project No.: 0712932
Date of Service: 09/21/2007
Report Date: 10/23/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requ i rem ents
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349 PW
Placement Date: 09/21/2007
Weather Conditions: Sunny
Time Sampled: 12:10pm
Temperature - Air: 900F
Truck No: 117
Air Content: NA
Overall Placement Location:
A, B, C I Lines 11-21
Batch time: 12:00pm
Concrete: 900F
Ticket No: 13814
Unit Weight (pet): NA
Measured
Slump
(inches)
4.0
Sample Location:
A, B, C, Lines 20.4-20.9
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (inZ) (Ibs) (psi) Type
10 1 09/28/2007 7 6.00 28.27 104,020 3,680 Cone/Shear
10 2 10/19/2007 28 6.00 28.27 130,080 4,600 Cone/Split
10 3 10/19/2007 28 6.00 28.27 130,470 4,610 Cone/Split
Average 4,610
10 4 11/16/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc,) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd,
(CH/KW) Page 10 of 11
Rone En~~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299500
Project No.: 0712932
Date of Service: 09/21/2007
Report Date: 10/23/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1 064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349 PW
Placement Date: 09/21/2007
Weather Conditions: Sunny
Time Sampled: 12:30pm
Temperature - Air: 920F
Truck No: 109
Air Content: NA
Overall Placement Location:
A, S, C / Lines 11-21
Batch time: 12:07pm
Concrete: 900F
Ticket No: 13815
Unit Weight (pet): NA
Measured
Slump
(inches)
4.0
Sample Location:
A, B, C, Lines 20.9-21
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
11 1 09/28/2007 7 6.00 28.27 100,240 3,550 Cone/Split
11 2 10/19/2007 28 6.00 28.27 127,690 4,520 Cone/Split
11 3 10/19/2007 28 6.00 28.27 111 ,700 3,950 Cone/Split
Average 4,230
11 4 11/16/2007 56
Technician: Denny Harris Started: 02:30am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Alln: Mr. Paul Byrne
(1-ec copy)
1-cc Potter Concrete Alln: Mr. Ryan Skelly
1-cc City of Coppell Alln: Mr. Lee Stone
1-cc City of Coppell Alln: Mr. Larry Davis
Finished: 01:15pm Rone Engineering
P-~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 11 of 11
Rone En~==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299482
Project No.: 0712932
Date of Service: 09/21/2007
Report Date: 10/23/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 3,000 psi @ 28 days
Slump (in.): NA
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design 1.0.: 7751 PW
Placement Date: 09/21/2007
Weather Conditions: Clear
Time Sampled: 10:00am
Temperature - Air: 890F
Truck No: 140
Air Content: NA
Overall Placement Location:
Building piers G, H/26, D-H/27, H, G, L.1, K.A128, B/2A
Measured
Slump
(inches)
6.0
Batch time: 09:31am
Concrete: 890F
Ticket No: 13796
Unit Weight (pet): NA
Sample Location:
Building pier H/26
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 09/28/2007 7 6.00 28.27 96,670 3,420 Cone/Split
1 2 09/28/2007 7 6.00 28.27 89,610 3,170 Shear
Average 3,290
1 3 10/19/2007 28 6.00 28.27 119,050 4,210 Cone/Split
1 4 10/19/2007 28 6.00 28.27 122,570 4,340 Cone/Split
Average 4,270
5 11/16/2007 56
Remarks: Water added at site: 10 gallons-before sample
Technician: Chris Harbour Rone Engineering
See Report 299481 for technician time~ ~
Report Distribution: ~ . -----...
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne . . . . .. . · ~
(1-ec copy) -
1-cc Potter Concrete Attn: Mr. Ryan Skelly K. Scott Watson AET
1-cc City of Coppell Attn: Mr. Lee Stone p . t M '
1-cc City of Coppell Attn: Mr. Larry Davis rOJec anager
LIMITATIONS: The test results presented herein were prepared based upon the specifiC samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 1
Rone En~==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 301922
Project No.: 0712932
Date of Service: 10/12/2007
Report Date: 10/23/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 3,000 psi @ 28 days
Slump (in.): NA
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design I.D.: 7751 PW
Placement Date: 10/12/2007
Weather Conditions: Clear
Time Sampled: 11 :20am
Temperature - Air: 760F
Truck No: 125
Air Content: NA
Overall Placement Location:
Building piers A/1.95, 2.4, 3, 3.3, 3.8, 4.2, 4.8, 5.2, 5.8, 6.2
Measured
Slump
(inches)
6.25
Batch time: 10:48am
Concrete: 800F
Ticket No: 14800
Unit Weight (pcf): NA
Sample Location:
Same as above
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 10/19/2007 7 6.00 28.27 89,850 3,180 Shear
1 2 10/19/2007 7 6.00 28.27 93,620 3,310 Shear
Average 3,240
1 3 11/09/2007 28
1 4 11/09/2007 28
1 5 12/07/2007 56
Remarks: Water added at site: 25 gallons (before sample by Potter Concrete)
Technician: Chris Harbour Rone Engineering
See Report 301921 for technician timep ~
Report Distribution: . . ~
Orig: Duke Construction, LP (Dallas, TX) Altn: Mr. Paul Byrne ..
(1-ec copy)
1-cc Polter Concrete Altn: Mr. Ryan Skelly K. Scott Watson, AET
1-cc City of Coppell Altn: Mr. Lee Stone Project Manager
1-cc City of Coppell Altn: Mr. Larry Davis
;::::>
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 1