Duke Lesley 1A-LR071031
Rone Eni==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300565
Project No.: 0713408
Date of Service: 10/01/2007
Report Date: 10/31/2007
Project: Point est VI
COpp II, Texas
Services: Obtai samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
sampl s back to the laboratory for curing and testing in accordance with applicable standards.
\
'--
Contractor: Duke Construction, LP
Concrete Supplier: LMC
Plant: 3
Specification Requirements
Strength: 4,200 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): 3% - 5%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT OAT A
Mix Design 1.0.: 1851
Placement Date: 10/01/2007
Weather Conditions: Cloudy, calm
Time Sampled: 09:03am Batch time: 08:27am
Temperature - Air: 730F Concrete: 910F
Truck No: 1046 Ticket No: 3237890
Air Content: 4.3% Unit Weight (pcf): NA
Overall Placement Location:
Manhole at Station 1 +62.87
Measured
Slump
(inches)
3.0
Sample Location:
Same as above
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Maximum
Load
(Ibs)
106,370
Started: 08:30am Finished: 10:45am
Cylinder
Marked Date Age
Set No. Tested (days)
1 1 10/08/2007 7
1 2 10/29/2007 28
1 3 10/29/2007
4
Diameter
(in)
6.00
Technician: David Best
Report Distribution:
Orig: Duke Construction, LP (Dalla X
Altn: Mr. Emmit Coots (1-ec copy)
1-cc Polter Concrete Altn: Mr. Ryan Skelly
1-cc Pacheco Koch Consulting Engineers Altn: Mr. Jack Evans
1-cc City of Coppell Altn: Mr. Larry Davis
1-cc City of Coppell Altn: Mr. Lee Stone
Area
(in')
28.27
Compressive
Strength
(psi)
3,760
Fracture
Type
Cone/Split
6.00
6.00
28.27
28.27
135,110
144,750
4,780
5,120
4,950
Shear
Shear
. Rone Engineering
p~.~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CHIED) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 302904
Project No.: 0713408
Date of Service: 10/25/2007
Report Date: 10/31/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
Report of Inspection
D rille r: Auger Drillina
Pie rid e ntifica tio n K 114 K 115 K 116 K 117 K 118
PierDiameter(in) 24/actual30 24/actual30 24/actual30 24/actual30 24/actual30
Depth of Pier From Surface 1ft) 40.50 41.00 41.00 48.90 39.30
Depth of Bear in a Stratum Fro m S u rfa c e (ft) 35.50 36.00 36.00 43.00 33.70
Required Penetration 1ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft)* 5.00 5.00 5.00 5.90 5.60
Condition ofBotlom (wet/dry) Dry D rv D rv D rv Dry
Plumb Within Tolerance (ves Ino) Yes Yes Yes Yes Yes
Casing Diameter(in)/Casina Lenath (ft) 2 8/3 7 2 8/3 6 2 8/36 2 8 13 7 2 8/3 5
NumberofBars/Reinforcing BarSize 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6
Length of Reinforcing Steel (ft) 40.60 40.00 39.00 47.60 37.60
Time Drillina was Comoleted (am Ipm) 10:05 AM 1 0 :2 0 A M 1 0 :3 5 AM 10:50AM 12:00 PM
Time Concrete was Placed (am 10m) 11:10 PM 11 :20 P M 12:00 PM 3:30 PM 1 :05 PM
Depth of Pier From Too of Concrete (ft) 40.00 40.50 40.50 48.40 38.80
Elevation: Surface (fO** 99.50 99.50 99.50 99.50 99.50
E leva tio n: To p of P ie r (ft).. 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft).. 59.00 58.50 58.50 50.60 60.20
Elevation: Top of Bearing Stratum (ft.) * * 64.00 63.50 63.50 56.50 65.80
Bearina Stratum (description) Gravshale
Note:See report# NA forCompressive StrengthTestSpecimens.
* Additional Penetration not requested unless noted. "Elevation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, ltd.
(GKlKW) Page 1 of 2
Rone Engineering
..
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 302904
Project No.: 0713408
Date of Service: 10/25/2007
Report Date: 10/31/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: AUQerDrillinQ
Pier Identification K 119 K f2 0
PierDiameter(in) 24/actual30 24/actual30
Depth of Pier From Surface (ft) 42.10 36.60
Depth of BearinQ Stratum Fro m Surface(ft) 37.10 31.50
ReQuired Penetration (ft) 5.00 5.00
A ctua I P e ne tra tio n (ft)" 5.00 5.10
Condition of Bottom (wetfdry) Dry Dry
Plumb Within Tolerance (ves Ino) Yes Yes
Casino Diameter(in)fCasinQ LenQth(ft) 2 8 f3 7 2 8/3 2
NumberofBars IReinforcing BarSize 6 f #6 6 1#6
LenQth of Reinforcing Steel (ft) 40.70 35.20
Time Drilling was Completed (am Ipm) 3 :4 5 P M 4:00 PM
Tim e Con c re te was P la c e d (a m I pm) 3 :5 0 P M 4:15 PM
Depth of Pier From Top of Concrete (ft) 41.60 36.10
E Ie va tio n: S urfa ce (ft).. 99.50 99.50
Elevation: Top of Pier (ft).. 99.00 99.00
Elevation: Bottom ofPier(ft).. 57.40 62.90
E Ie va ti 0 n : Top of BearinQ Stratum (ft.)" 62.40 68.00
Bearing Stratum (description) Gravshale
Note: See report # NA for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted. **E levation by others
Technician: Jimmy Hall Started: 06:00am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Altn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Altn: Mr. Jack Evans
1-cc City of Coppell Altn: Mr. Larry Davis
1-cc City of Coppell Altn: Mr. Lee Stone
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(GKlKW) Page 2 of 2
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 303065
Project No.: 0713408
Date of Service: 10/26/2007
Report Date: 10/31/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
Report of Inspection
D rille r: A ua e r D rillina
Pier Identification K 113 K 121 K 122 J 11 3 J 114
Pier Diameter (in) 24/aclual30 24/actual30 24/aclual30 24/aclual30 24/aclual30
Depth of Pier From Surface (ft) 40.90 39.80 42.40 42.80 41.00
Depth of Bear in a Stratum Fro m S u rfa c e (ft) 34.90 34.00 35.00 36.80 36.00
Reauired Penetration (ft) 5.00 5.00 5.00 5.00 5.00
A ctua I P e ne tra tio n (ft)" 6.00 5.80 7.40 6.00 5.00
Condition of Bottom (wet/drv) Dry D rv D rv D rv Dry
Plumb Within Tolerance (ves Ino) Yes Yes Yes Yes Yes
Casina Diameter(in)/Casina Lenath (tt) 28/35 28/36 2 8 13 6 2 8 13 7 28/37
NumberofBars IReinforcina BarSize 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6
Len a th 0 f Rei n fo rc i n a S te e I (ft) 39.10 38.00 40.60 41.00 39.20
Time DrillinQ was Com Dieted (am Ipm) 9:05 AM 8:30 AM 8:45 AM 9 :2 5 AM 9 :4 0 A M
Time Concrete was Placed (am 10m) 11:00AM 10:25 AM 1 0:00 AM 11:25AM 11 :45 AM
DepthofPierFrom Too of Concrete (ft) 40.40 39.30 41.90 42.30 40.50
Elevation: Surface (ft).. 99.50 99.50 99.50 99.50 99.50
Elevation:Top of Pier (ft).. 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft).. 58.60 59.70 57.10 56.70 58.50
Elevation: Top of Bear in a Stratum (ft.)" 64.60 65.50 64.50 62.70 63.50
Bearina Stratum (descriotion) G ra V s h a Ie
Note:See report# NA forCompressive StrengthTestSpecimens.
"Additional Penetration not requested unless noted. "Elevation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 4
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 303065
Project No.: 0713408
Date of Service: 10/26/2007
Report Date: 10/31/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: AuqerDrillinq
Pier Identification J /1 5 J /1 6 J /17 J /18 J /19
Pier Diameter (in) 24/actual30 24/actual30 24/actual30 24/actual30 24/actual30
Depth of Pier From S urfa ce (ft) 39.30 42.70 40.40 39.00 36.50
Depth ofBearinq Stratum Fro m Surface(ft) 33.90 36.80 34.60 34.00 31.40
Required Penetration (ft) 5.00 5.00 5.00 5.00 5.00
A ctua I P e netra tio n (ft)* 5.40 5.90 5.80 5.00 5.10
Condition of Boll om (wet/dry) D rv Dry D rv Dry D rv
Plumb Within Tolerance (ves /no) Yes Yes Yes Yes Yes
Casinq Diameter(in)/Casinq Lenqth(ft) 2 8/3 5 28/37 2 8 13 5 2 8 13 5 2 8/3 2
NumberofBars /Reinforcing BarSize 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6
Length of Reinforcing Steel (ft) 37.50 40.90 38.60 37.20 34.70
Time Drilling was Completed (am Ipm) 9:50 AM 10:10 AM 1 0:45 AM 11:15AM 1 1 :40 AM
Time Concrete was Placed (am Ipm) 12:15 PM 1 2 :40 P M 1 :05 PM 1 :30 P M 2 :00 P M
Depth of Pier From Top of Concrete (ft) 38.80 42.20 39.90 38.50 36.00
Elevation: Surface (ft)** 99.50 99.50 99.50 99.50 99.50
Elevation:Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
E Ie va tio n: Bolio m 0 f P ie r (ft)** 60.20 56.80 59.10 60.50 63.00
Elevation: Top ofBearinq Stratum (fl.)** 65.60 62.70 64.90 65.50 68.10
Bearina Stratum (description) G ra v s h a Ie
Note: See re port # NA for Compressive Strength Test Specimens.
. Additional Penetration not requested unless noted. HE levation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 2 of 4
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 303065
Project No.: 0713408
Date of Service: 10/26/2007
Report Date: 10/31/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: AugerDrillina
Pie rid e ntifica tio n J /2 0 J /2 1 J /2 2 H /13 H 114
Pier Diameter (in) 24/actual30 24/actual30 24/actual30 24/actual30 24/actual30
D e p th 0 f Pie r Fro m S u rfa c e (ft) 39.00 41.70 42.60 39.30 41.50
D e p th 0 f B e a ri n aStra tu m Fro m S u rfa ce (ft) 34.00 35.70 35.00 33.90 35.20
Reauired Penetration (ft) 5.00 5.00 5.00 5.00 5.00
k ctua I P e netra tio n (ft)* 5.00 6.00 7.60 5.40 6.30
Condition of Bottom (wet/dry) D rv D rv D rv Dry D rv
Plumb Within Tolerance (yes /no) Ves Ves Ves Ves Ves
Casing Diameter(in)/Casina Lenath (ft) 2 8 /3 5 28/37 2 8/3 7 2 8/3 5 2 8 /3 7
NumberofBars IReinforcinQ BarSize 6 / #6 6 / #6 6 1 #6 6 / #6 6 1 #6
Length of Reinforcina Steel (ft) 37.20 39.90 40.80 37.50 39.70
Time Drillina was Completed (am /pm) 1 2 :4 0 P M 1 :20 PM 1 :4 0 P M 2:00 PM 2 :45 P M
Time Concrete was Placed (am /pm) 2 :30 PM 2 :5 0 PM 3:15 PM 3:50 PM 4:10 PM
Depth of Pier From Top of Concrete (ft) 38.50 41.20 42.10 38.80 41 .00
E Ie va ti 0 n: S u rfa c e (ft) * * 99.50 99.50 99.50 99.50 99.50
E Ie va ti 0 n: Top 0 f Pie r (ft) ** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom ofPier(ft)** 60.50 57.80 56.90 60.20 58.00
Elevation: Top of Bearina Stratum (ft.) * * 65.50 63.80 64.50 65.60 64.30
Bearing Stratum (description) G ra v s h a Ie
Note: See report # NA for Compressive Strength Test Specimens.
. Additional Penetration not requested unless noted. HE levation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, ltd.
(CH/KW) Page 3 of 4
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 303065
Project No.: 0713408
Date of Service: 10/26/2007
Report Date: 10/31/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: A u a e r D ri IIi n a
Pier Identification H 115
Pie r D i am e te r (i n) 24/actual30
D e p th 0 f Pie r F ro m S u rfa c e (ft) 41.60
Depth of Bearing Stratum Fro m S urfa ce (ft) 34.10
Required Penetration (ft) 5.00
Actual Penetratic..n (ft)' 7.50
Condition of Bolt om (wetfdry) D rv
Plumb Within Tolerance (yes Ino) Yes
Casing Diameter(in)/Casina Lenath (ft) 2 8 f3 5
NumberofBarsfReinforcinq BarSize 6 f #6
Lenath of Reinforcing Steel (ft) 39.80
Time Drillino was Completed (am 10m) 3:10 PM
Tim e Con c re te was P la c e d (a m f pm) 4 :35 P M
DeothofPierFrom Top of Concrete (ft) 41 .10
Elevation: Surface (ft)" 99.50
Elevation:Top of Pier (ft)" 99.00
Elevation: Boltom of Pier (fl)" 57.90
E Ie va ti 0 n: Too ofBearinq Stratum (ft. ) .. 65.40
Bearino Stratum (description) G ra v s h a Ie
Note: See report # NA for Com pressive Strength Test Specim ens.
. Additional Penetration not requested unless noted. uE levation by others
Technician: Jimmy Hall Started: 06:00am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Attn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans
1-cc City of Coppell Attn: Mr. Larry Davis
1-cc City of Coppell Attn: Mr. Lee Stone
Finished: 05:30pm Rone Engineering
p~~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 4 of 4
Rone Engineering
..
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 303268
Project No.: 0713408
Date of Service: 10/27/2007
Report Date: 10/31/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
Report of Inspection
Driller: AuOerDrillinO
Pie rid e ntifica tio n H /16 H /17 H /18 H /19 H/20
Pier Diameter (in) 24/actual30 24/actual30 2 4/a c tu a I 30 24/actual30 24/actual30
D e 0 th 0 f Pie r F ro m S u rfa c e (ft) 41.20 41.50 39.00 37.00 39.50
Depth ofBearino Stratum Fro m S urfa ce (ft) 35.50 36.00 33.30 31 .10 34.00
R e qui re d Pen e tr a ti 0 n (ft) 5.00 5.00 5.00 5.00 5.00
A ctua I P e ne tra tio n (ft)" 5.70 5.50 5.70 5.90 5.50
Condition of Bottom (wet/drv) D rv D rv D rv D rv D rv
P I u m b With i n Tole ran c e (v e sIn 0 ) Ves Ves ves Ves ves
Casino Diameter(in)/Casino Lenoth (ft) 2 8 13 7 2 8/3 6 2 8/3 5 28/32.6 2 8 13 5
NumberofBars IReinforcino BarSize 6 1#6 6 1#6 6 1#6 6 / #6 6 1#6
Length of Reinforcing Steel (ft) 39.40 39.70 37.20 35.20 37.70
Time Drilling was Completed (am Ipm) 8 :2 5 AM 8 :4 5 AM 9:00 AM 9 :2 0 AM 9 :4 0 A M
Time Concrete was Placed (am I pm) 9:10 AM 9 :3 0 AM 10:00AM 1 0 :2 0 AM 1 0:40 AM
Depth of Pier From Top of Concrete (ft) 40.70 41.00 38.50 36.50 39.00
Elevation: Surface (ft)"" 99.50 99.50 99.50 99.50 99.50
Elevation: Top of Pier (ft).. 99.00 99.00 99.00 99.00 99.00
E Ie va tio n: Botto m 0 f Pie r (ft).. 58.30 58.00 60.50 62.50 60.00
Elevation: ToO of Bearing Stratum (ft.)" " 64.00 63.50 66.20 68.40 65.50
Bearina Stratum (description) G ra y s h a Ie
Note: See report # NA fo reo m p re s s i ve S t re n 9 t h T est S pee i men s .
. Additional Penetration not requested unless noted. uE levation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(GKlKW) Page 1 of 2
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 303268
Project No.: 0713408
Date of Service: 10/27/2007
Report Date: 10/31/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: AugerDrilling
Pie rid e ntifica lio n H 121 H/22 G 114
PierDiameter(in), 24/actual30 24/actual30 24/actual30
Depth of Pier From Surface (ft) 40.60 41.50 41 .50
Deoth of Bear in a Stratum Fro m S urfa ce (ft) 34.40 35.60 35.30
Reauired Penetration (ft) 5.00 5.00 5.00
Actual Penetration (ft)" 6.20 5.90 6.20
Condition of Bottom (wet/dry) Dry Dry Dry
Plum b Within Tolerance (yes I no) Yes Yes Yes
Casing Diameter(in)/Casing Length (ft) 2 8/3 7 2 8 13 7 2 8/3 7
NumberofBars/Reinforcing BarSize 6 1#6 6 1#6 6 1#6
Length of Reinforcina Steel (ft) 38.80 39.70 39.70
Time Drillina was Comoleted (am 10m) 1 0:00 A M 1 0 :2 5 AM 1 0:40 AM
Time Concrete was Placed (am Ipm) 1 1 :00 AM 1 1 :25 AM 1 1 :40 AM
Depth of Pier From Top of Concrete (ft) 40.10 41.00 41.00
Elevation: Surface (ft).. 99.50 99.50 99.50
Elevation:Top of Pier (ft)" 9 9 .00 9 9.00 99.00
Elevation: Bottom of Pier (ft).. 58.90 58.00 58.00
Elevation: Top of Bearina Stratum (ft.)" 65.10 63.90 64.20
Bearing Stratum (description) G ra v s h a Ie
Not e: See re port # NA for Com pressive Strength Test Specim ens.
. Additional Penetration not requested unless noted. HE levation by others
Technician: Jimmy Hall Started: 06:00am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Attn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans
1-cc City of Coppell Attn: Mr. Larry Davis
1-cc City of Coppell Attn: Mr. Lee Stone
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(GKlKW) Page 2 of 2
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Pulverization/Gradation Testing
Report No.: 303162
Project No.: 0713408
Date of Service: 10/26/2007
Report Date: 10/31/2007
Project: Point West VI
Coppell, Texas
Services: Pulverization/Gradation Testing
Report of Tests
Specifications:
passing
passing
1/2" sieve
#4 sieve
100%
60%
A B C D E
W e ig h t Percent W e ig h t Percent
Sam pie Retained Passing Retained Passing
Location W e ig h t 1 1 /2 " S ie v e 1 1/2" Sieve #4 S ie v e #4 S ie v e
1 Building pad, grid lineA.5/38 1 0 .7 0 100% 4.1 61.6 %
2 Building pad, grid line C.5/38 1 0 .3 0 1 00% 4.0 61 .1 %
3 Buildin9 pad, grid line E.5/38 1 1 .0 0 100% 4.3 60.9 %
4 Building pad, grid lin e G .5/38 1 1 .1 0 1 00% 4.2 62.1 %
5 Building pad, grid line J.5/38 1 0 .5 0 100% 4.1 60.9 %
Technician: Joe Jernigan
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Attn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans
1-cc City of Coppell Attn: Mr. Larry Davis
1-cc City of Coppell Attn: Mr. Lee Stone
Started: 01 :OOpm Finished: 02:45pm
RoneEngineering
p~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, ltd.
(TM/ED) Page 1 of 1
Rone Eni==
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 303023
Project No.: 0713408
Date of Service: 10/25/2007
Report Date: 10/31/2007
Project: Point West VI
Coppell, Texas
Services: Perform In-Place Density Testing
PROJECT DATA
Contractor: Duke Construction, LP
Test Method: ASTM D-6938
Gauge: Troxler 3430
Gauge Serial No: 35518
Test Mode: DT
Standard Counts
Moisture Density
Current: 742 Current: 2473
Previous: 741 Previous: 2445
MOISTURE DENSITY RELATIONS
MID No.
272998
Description
Brown I Silty Clay wI Organics
Moisture
%
Maximum
Density
(pet)
96.5
Project Requirements
Moisture Density
Optimum +4 95 min
22.5
Test
No
Test Location
FIELD DENSITY TESTS
Probe MID
Depth No.
Moisture Wet Density Dry Density Density
% (pet) (pet) (% max)
Utility backfill
6" Sanitary sewer line 2, Station 0+50, 2' below 6" 272998 24.2 116.4 93.7 97
grade
Utility backfill
2 6" Sanitary sewer line 2, Station 0+50, final 6" 272998 24.8 115.3 92.4 96
Technician: Joe Jernigan
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Attn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans
1-cc City of Coppell Attn: Mr. Larry Davis
1-cc City of Coppell Attn: Mr. Lee Stone
Started: 12:45pm Finished: 02:30pm
Rone Engineering
p~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/ED) Page 1 of 1
Rone En~~
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 302828
Project No.: 0713408
Date of Service: 10/24/2007
Report Date: 10/31/2007
Project: Point West VI
Coppell, Texas
Services: Perfonn In-Place Density Testing
PROJECT DATA
Contractor: Duke Construction, LP
Test Method: ASTM 0-6938
Gauge: Troxler 3430
Gauge Serial No: 35518
Test Mode: DT
Standard Counts
Moisture Density
Current: 741 Current: 2445
Previous: 748 Previous: 2573
MOISTURE DENSITY RELATIONS
Test
No
Test Location
Maximum
Moisture Density Project Requirements
% (pct) Moisture Density
22.5 96.5 Optimum +4 95min
FIELD DENSITY TESTS
Probe MID Moisture Wet Density Dry Density Density
Depth No. % (pct) (pct) (% maxI
6" 272998 24.8 115.3 92.4 96
6" 272998 24.2 116.4 93.7 97
6" 272998 25.5 115.8 92.3 96
6" 272998 22.8 115.7 94.2 98
6" 272998 24.7 115.2 92.4 96
MID No.
272998
Description
Brown I Silty Clay wi Organics
Utility backfill
Retest - test # ,report #6, 302019
Utility backfill
2 Retest - test # ,report #7 302019
Utility backfill
3 Storm drain line G, Station 6+50, final
Utility backfill
4 Storm drain line G, Station 9+50, final
Utility backfill
5 Storm drain line G, Station 11 +50, final
Technician: Joe Jernigan
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Attn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans
1-cc City of Coppell Attn: Mr. Larry Davis
1-cc City of Coppell Attn: Mr. Lee Stone
Started: 11 :30am Finished: 01 :45pm
Rone Engineering
P-~~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/ED) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Reinforcing Steel Inspection
Report No.: 303187
Project No.: 0713408
Date of Service: 10/26/2007
Report Date: 10/31/2007
Project: Point West VI
Coppell, Texas
Services: Reinforcing Steel Inspection
Report of Inspection
Locatio ns and Ite m s Inspected:
Building slab on grade, column lines J-L/2-12
"em s Inspected: Conforming Non Items Inspected: Co nfo rm ing Non Items Inspected: Conforming Non
Conforming Conforming Co nfo rm ing
P lacing Drawings Bar Length Column Ties Properly
Approved x and Shape x Tied and Spaced NA
Bar Size x P roper Bar Placement x Stirrup Spacing NA
Bar Grade x Pro perty Tied x Stirrup Type NA
Bars Clean x Dowel Bars in P iace x Lapped Splices x
Form Clean x Pro per B ar Suppo rts x Corner Bars NA
Numberof Bars x Proper Cover x Mechanical Splices NA
Discrepancies I Comments:
1. Chairs to be placed during concrete placement.
Technician: Clayton Snyder Started: 02:00pm
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Alln: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Alln: Mr. Jack Evans
1-cc City of Coppell Alln: Mr. Larry Davis
1-cc City of Coppell Alln: Mr. Lee Stone
Finished: 04:00pm Rone Engineering
p~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/ED) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In..Place Density Testing
Report NiO.: 303371
Project No.: 0713408
Date of Service: 10/29/2007
Report Date: 10/31/2007
Project: Point West VI
Coppell, Texas
Services: Perform In-Place Density Testing
PROJECT DATA
Contractor: Duke Construction, LP
Test Method: ASTM D-6938
Gauge: Troxler 3430
Gauge Serial No: 35518
Test Mode: DT
Standard Counts
Moisture Density
Current: 747 Current: 2537
Previous: 741 Previous: 2566
MOISTURE DENSITY RELATIONS
MID No.
299552
Description
Lime Treated Brown & Tan / Sandy Clay
Moisture
%
Maximum
Density
(pet)
85.7
Project Requirements
Moisture Density
Optimum +4 95 min
30.3
FIELD DENSITY TESTS
Test Probe MID Moisture Wet Density Dry Density Density
No Test Location Depth No. % (pet) (pet) (% max)
-
Building pad
1 Grid line A.5/36 6" 299552 32.1 111.1 84.1 98
Building pad
2 Grid line C.5/36 6" 299552 31.0 112.0 85.5 100
Building pad
3 Grid line E.5/36 6" 299552 32.3 111.4 84.2 98
Building pad
4 Grid line G.5/36 6" 299552 32.9 111.6 84.0 98
Building pad
5 Grid line J.5/36 6" 299552 30.6 111.5 85.4 100
Technician: Joe Jernigan
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Artn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Artn: Mr. Jack Evans
1-cc City of Coppell Attn: Mr. Larry Davis
1-cc City of Coppell Artn: Mr. Lee Stone
Started: 09:15am Finished: 10:45am
Rone Engineering
P-~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, ltd.
(CH/ED) Page 1 of 1