Duke Lesley 1A-LR071025
Rone Eni~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 301525
Project No.: 0713408
Date of Service= 10/09/2007
Report Date: 10/25/2007
Project: Point West VI
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: LMC
Plant: 7
Specification Requirements
Strength: 4,200 psi @ 28 days
Slump (in.): 2" - 4"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT OAT A
Mix Design 1.0.: 1851
Placement Date: 10/09/2007
Weather Conditions: Sunny, partly cloudy
Time Sampled: 01:50pm Batch time: 12:02pm
Temperature - Air: 900F Concrete: 960F
Truck No: 7183344 Ticket No: 1080
Air Content: NA Unit Weight (pet): NA
Overall Placement Location:
Manhole
Measured
Slump
(inches)
3.0
Sample Location:
Station 26+65.04
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 10/16/2007 7 6.00 28.27 126,370 4,470 Cone/Split
1 2 11/06/2007 28
1 3 11/06/2007 28
4 12/04/2007 56
Started: 11 :15am Finished: 02:45pm
Technician: Montreal Bailey
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Alln: Mr. Emmit Coots (1-ec copy)
1-cc Potter Concrete Alln: Mr. Ryan Skelly
1-cc Pacheco Koch Consulting Engineers Alln: Mr. Jack Evans
1-cc City of Coppell Attn: Mr. Larry Davis
1-cc City of Coppell Alln: Mr. Lee Stone
Rone Engineering
P-~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/KW) Page 1 of 1
Rone En~~
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 302435
Project No.: 0713408
Date of Service: 10/19/2007
Report Date: 10/25/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
I
D rille r: Au g e r D ri IIi n g
Pie r Id e ntifica tio n J/4 J/3 K 14 K/3 K 12
Pier Diameter (in) 24/30 actua 4/30 actua 24/30 actual 24/30 actual t14/30 actual
Deoth of Pier From Surface (ft) 40.40 40.50 41.80 41.80 40.40
D e p th 0 f B e a ri noS tra tu m From Surface (ft) 34.10 35.50 35.30 36.30 35.40
Reo uire d P e netra tio n (ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft)* 6.30 5.00 6.50 5.50 5.00
Condition of Bottom (wet/drv) D rv D rv D rv Dry D rv
Plumb Within Tolerance (yes I no) Yes Yes Yes Yes Yes
Casino Diameter (in) ICasinQ LenQth (ft) 2 8 13 7 2 8 I'!. 7 2 8 13 6 28/37 2 8/3 6
NumberofBars IReinforcino BarSize 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6
LenQth of ReinforcinQ Steel (ft) 39.00 39.10 40.40 40.40 39.00
Time DrillinQ was Completed (am Ipm) 11:10AM 11:30AM 12:00 PM 12:35 PM 1 :45 PM
Tim e Con c re te was P la c e d (a m I pm) 1 :40 PM 2 :00 PM 2 :30 P M 2 :45 P M 3:15 PM
Depth of Pier From Top of Concrete (ft) 39.90 40.00 41.30 41.30 39.90
Elevation: Surface (ft)u 99.50 99.50 99.50 99.50 99.50
Elevation: Too of Pier (ft)U 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft)u 59.10 59.00 57.70 57.70 59.10
Elevation: Top of BearinQ Stratum (ft.)'" 65.40 64.00 64.20 63.20 64.10
Bearino Stratum (description) Native clay I shalev clay
Note: See re port # NA for Compressive Strength Test Specimens.
* Additional Penetration not requested un Ie s s note d . uE levation by others
Report of Inspection
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we halle no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 1 of 5
Rone En2==
8908 Ambassador Row, Dallas, TX 75247
nIDi W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 302435
Project No.: 0713408
Date of Service: 10/19/2007
Report Date: 10/25/2007
Project: Point West VI
Coppell , Texas
Services: Straight Shaft Pier Inspection
D rille r: AugerDrillina
Pier Identification F 14 G 13 G 14 H/3 H 14
Pier Diameter (in) 24/30 actual 24/30 actual 24/30 actual 24/30 actual 24130 actual
Deoth of Pier From Surface (ft) 39.70 40.60 41.00 40.60 41.90
D e 0 th 0 f B e a ri n Q S tra tu m Fro m S urfa ce (ft) 34.00 35.50 35.50 35.00 36.70
Reauired Penetration (ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft). 5.70 5.10 5.50 5.60 5.20
Condition of Bottom (wet/dry) D rv D rv D rv D rv D rv
Plumb Within Tolerance (ves Ino) Ves Yes Ves Ves Ves
Casina Diameter{in)/Casina Lenath (ft) 2 8 13 6 2 8 13 5 2 8 13 6 2 8/3 5 2 8/3 7
NumberofBars IReinforcina BarSize 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6
Lenath of Reinforcina Steel (ft) 38.30 39.20 39.60 39.20 40.50
Time Drillina was Comoleted (am 10m) 9 :4 5 AM 10:00 AM 10:25 AM 1 1 :00 AM 1 0 :48 A M
Time Concrete was Placed (am 10m) 11:35AM 1 2 :0 5 P M 1 2 :2 5 P M 12:50 PM 1 :1 5 PM
Deoth of Pier From Too of Concrete (ft) 39.20 40.10 40.50 40.10 41.40
Elevation: Surface (fll" 99.50 99.50 99.50 99.50 99.50
Elevation:Too ofPier{ft).. 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier {ft\.. 59.80 58.90 58.50 58.90 57.60
Elevation: Too of Bear in a Stratum (ft.).. 65.50 64.00 64.00 64.50 62.80
Bearina Stratum (descriotion) G ra v s h a Ie
Note: See re port # NA fo reo m p re s s i ve SIre n 9 t h T e s I S P e c i men s .
. Additional Penetration not requested unless noted. uE levation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 2 of 5
Rone Eni==
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 302435
Project No.: 0713408
Date of Service: 10/19/2007
Report Date: 10/25/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: A UQ er D rillinQ
Pier Identification D 13 D 14 E /3 E 14 F /3
PierDiameter(in) 24/30 actual 24/30 actual 24/30 actual 24/30 actual 24/30 actual
Depth of Pier From Surface (ft) 40.30 41.00 41.00 39.70 40.80
Depth ofBearina Stratum From Surface(ft} 35.00 33.50 34.30 34.40 35.60
Required Penetration (ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetra~ion (ft)* 5.30 7.50 6.70 5.30 5.20
Condition of Bottom (wet/drv) Dry D rv D rv D rv Dry
Plumb Within Tolerance (ves Ino) Yes Yes Yes Yes Yes
CasinQ Diameter(in)/CasinQ LenQth(ft) 2 8/3 7 2 8/3 5 2 8/3 5 2 8/3 3 2 8 13 5
NumberofBars IReinforcinQ BarSize 6 1#6 6 1#6 6 / #6 6 1#6 6 1#6
Length of Reinforcina Steel (ft) 38.80 39.60 39.60 38.30 39.40
Time Drillina waS"Comoleted (am /om) 8 :2 0 AM 8:40 AM 9:00 AM 9:15 AM 9 :57 AM
Time Concrete was Placed (am Ipm) 9:09 AM 10:05 AM 1 0 :4 0 A M 10:55AM 11:05AM
Deoth of Pier From Top of Concrete (f!) 39.80 40.50 40.50 39.20 40.30
Elevation: Surface (ft).. 99.50 99.50 99.50 99.50 99.50
Elevation:Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft).. 59.20 58.50 58.50 59.80 58.70
Elevation: Too of Bearina Stratum (ft.)** 64.50 66.00 65.20 65.10 63.90
BearinQ Stratum (description) Gravshale
Note:See report# NA forCompressive StrengthTestSpecimens.
* Additional Penetration not requested unless noted. "Elevation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KWIKW) Page 3 of 5
Rone En2~
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214)630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 302435
Project No.: 0713408
Date of Service: 10/19/2007
Report Date: 10/25/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: A u 0 e r D ri iii n 0
Pier Identification K 12 K 15 K/6 K 17 J/5
PierDiameter(in) 2 4 13 0 a c tu a I 24/30 actual 24 13 0 a c tu a I 24/3 0 a c tu a I 24/30 actual
DepthofPierFrom Surface (ft) 40.70 39.70 40.80 40.20 38.00
Depth of Bearino Stratum Fro m S u rfa c e (ft) 35.00 34.30 35.80 35.00 31.90
Required Penetration (ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft). 5.70 5.40 5.00 5.20 6.10
Condition of Bottom (wet/drv) Dry Dry Dry Dry Dry
Plumb Within Tolerance (ves Ino) Yes Yes Yes Yes Yes
Casino Diameter(in)/Casino Lenoth (ft) 2 8 13 6 2 8/3 5 2 8/3 7 2 8 13 5 28/32
NumberofBars IReinforcino BarSize 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6
Length of Reinforcino Steel (ft) 39.30 38.30 39.40 38.80 36.60
Time Drillino was Completed (am Ipm) 1 :25 P M 2:15 PM 2:05 PM 2 :4 5 P M 3 :0 5 P M
Time Concrete was Placed (am 10m) 3:30 PM 3:50 PM 4 :0 0 PM 4 :2 0 PM 4 :4 5 P M
Depth of Pier From Top of Concrete (ft) 40.20 39.20 40.30 39.70 37.50
Elevation: Surface (ft).. 99.50 99.50 99.50 99.50 99.50
Elevation: Top of Pier (ft).. 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft).. 58.80 59.80 58.70 59.30 61.50
Elevation: Too of Bearino Stratum (ft.)" 64.50 65.20 63.70 64.50 67.60
Bearino Stratum (description) Grav shale
Note: See report # NA for Compressive Strength Test Specimens.
. Additional Penetration nol requested unless noted. **E levation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 4 of 5
Rone Eni==
8908 Ambassador Row, Dallas, TX 75247
77G1 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 302435
Project No.: 0713408
Date of Service: 10/19/2007
Report Date: 10/25/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: A ug e r Drilling
Pie r Id e n ti fi c a ti 0 n K 18 J/6 K 19
Pier D iam eter (in) 24/30 actual 24/30 a c tu a I 24/30 actual
De p th 0 f P ie r Fro m S u rfa c e (ft) 40.90 40.30 40.20
Depth of Bearing Stratum From S urfa ce (ft) 35.00 35.00 35.00
Required Penetration (ft) 5.00 5.00 5.00
Actual Penetration (ft)" 5.90 5.30 5.20
Condition of Bottom (wet/dry) Dry Dry Dry
Plumb Within Tolerance (yes /no) Ves Ves Ves
Casing Diameter(in)/Casing Length (ft) 28/36 2 8 13 7 2 8/3 7
NumberofBars IReinforcing BarSize 6 1#6 6 1#6 6 1#6
Length of Reinforcing Steel (ft) 39.50 38.90 38.80
Time Drilling was Completed (am Ipm) 4:35 PM 3:20 PM 3 :4 5 P M
Time Concrete was Placed (am Ipm) 5 :0 0 P M 5:15 PM 5:30 PM
DepthofPierFrom Top of Concrete (ft) 40.40 39.80 39.70
Elevation: Surface (ft).. 99.50 99.50 99.50
Elevation: Top of Pier (ft).. 99.00 99.00 99.00
Elevation: Bottom of Pier (fl)" 5 8 .60 5 9 .20 5 9.30
E Ie va ti 0 n: Top of Bearing Stratum (fl.)"" 64.50 64.50 64.50
Bearing Stratum (description) G ra v s h a Ie
No Ie: See re port # NA fo reo m pre s s ive Sire n 9 I h T e s I S pee i men $ .
. Additional Penetralion not requested unless noled. HE levation by others
Remarks: Pier location K/2 noted on sheet 3 and sheet 4 are corrective action piers. Reference RFI No. X101 dated
10/10/2007.
Technician: Jimmy Hall
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Altn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Altn: Mr. Jack Evans
1-cc City of Coppell Altn: Mr. Larry Davis
1-cc City of Coppell Altn: Mr. Lee Stone
Started: 06:15am Finished: 06:15pm
Rone Engineering
p~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 5 of 5
Rone En~==
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 302589
Project No.: 0713408
Date of Service: 10/20/2007
Report Date: 10/25/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
Report of Inspection
D rille r: A ua e r
Pie r Id e n ti fi c a ti 0 n K 110 K /1 1 J/7 K 112 J/8
PierDiameter(in) 24 24 24 24 24
Depth of Pier From Surface (ft) 41.50 42.50 41.40 43.30 42.30
Deoth of Bear in a Stratum From Surface (ft) 36.40 37.00 36.10 38.00 37.00
Reauired Penetration (ft) 5.00 5.00 5.00 5.00 5.00
A c tu a I Pen e tra ti 0 n (ft). 5.10 5.50 5.30 5.30 5.30
Condition of Bottom (wet/dry) D rv Dry Dry Dry D rv
Plumb Within Tolerance (yes Ino) Ves Ves Ves Ves Ves
Casina Diameter(in)/Casing Length (ft) 2 6/3 5 2 6/3 7 26/35 2 6/3 6 2 6 13 7
NumberofBars /Reinforcing BarSize 6 / #6 6 1#6 6 / #6 6 1#6 6 1#6
Lenath of Reinforcina Steel (ft) 39.80 41.00 39.90 42.00 39.90
Time Drillina was Completed (am Ipm) 8:00 AM 8 :2 5 AM 8:50 AM 8 :4 0 A M 9:00 AM
Time Concrete was Placed (am Ipm) 9:15 AM 9 :4 5 A M 1 :00 P M 10:15 AM 11:35AM
Deoth of Pier From Top of Concrete (ft) 41.00 42.00 40.90 42.80 41.80
Elevation: Surface (ft)" 99.50 99.50 99.50 99.50 99.50
Elevation: Top of Pier (ft).. 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft).. 58.00 57.00 58.10 56.20 57.20
Elevation: Top of Bearing Stratum (ft.)" 63.10 62.50 63.40 61.50 62.50
Bearina Stratum (description) G ra y s h a Ie
Note:See report# 302590 forCompressive StrengthTestSpecimens.
. Additional Penetration not requested unless noted. "Elevation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 3
Rone En~~
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 302589
Project No.: 0713408
Date of Service: 10/20/2007
Report Date: 10/25/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: A ua e r
Pier Identification J 112 J /1 1 J 19 H 112 H /11
PierDiameter(in) 24 24 24 24 24
Depth of Pier From Surface (ft) 43.80 42.80 42.20 43.30 41.30
Depth of Bear in a Stratum From S urfa ce (ft) 38.60 37.20 37.00 37.10 36.00
ReQuired Penetration (ft) 5.00 5.00 5.00 5.00 5.00
A ctua I P e ne tra tio n (ft)* 5.20 5.60 5.20 6.20 5.30
Condition of Bottom (wet/dry) Dry Dry Dry Dry D rv
Plumb Within Tolerance (ves I no) Ves Ves Ves Ves Ves
Casina Diameter(in)/Casina Lenath (ft) 2 6 13 6 26/37 2 6/3 5 26/36 2 6/3 6
NumberofBars IReinforcing Bar Size 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6
Length of Reinforcing Steel (ft) 42.50 41.30 40.70 41.80 39.50
Time DrillinQ was Completed (am Ipm) 9 :2 0 AM 9:35 AM 9 :5 0 AM 1 1 :00 AM 1 1 :30 AM
Time Concrete was Placed (am Ipm) 1 0 :5 0 AM 1 1 :25 AM 1 1 :45 A M 1 :20 PM 1 :4 0 P M
Depth of Pier From Top of Concrete (ft) 43.30 42.30 41.70 42.80 40.80
Elevation: Surface (ft)** 99.50 99.50 99.50 99.50 99.50
Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft)** 55.70 56.70 57.30 56.20 58.20
Elevation: Top of Bear in a Stratum (ft.) ** 60.90 62.30 62.50 62.40 63.50
Bearina Stratum (description) G ray shale
Note: See report # 302590 for Compressive Strength Test Specimens.
. Additional Penetration not requested unless noted. HE Ie va tio n by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 2 of 3
Rone Eni=:=
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 302589
Project No.: 0713408
Date of Service: 10/20/2007
Report Date: 10/25/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
D dlle r: Auaer
Pier Identification J 11 0 H 110 H 18 H 19 H 17
Pier Diameter (in) 24 24 24 24 24
DeothofPierFrom Surface (ft) 42.10 43.00 42.70 41.70 42.70
Deoth of Bear in a Stratum From Surface(ft) 37.00 38.00 36.90 36.00 36.00
Required Penetration (ft) 5.00 5.00 5.00 5.00 5.00
A ctua Ire ne tra tio n (ft). 5.1 0 5.00 5.80 5.70 6.70
Condition of Boll om (wet/drv) Dry Dry Dry Dry Dry
Plumb Within Tolerance (ves Ino) Yes Yes Yes Yes Yes
Casina Diameler(in)/Casina Lenath(ft) 2 6/3 7 2 6/3 6 26/35 2 6 13 6 26/35
NumberofBars IReinforcing BarSize 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6
Length of Reinforcing Steel (ft) 40.60 41.90 41.00 40.00 41.00
Time Drilling was Completed lam 10m) 10:15AM 1 1 :50 AM 1 :00 PM 1 2 :20 P M 1 :50 PM
Tim e Con c re te was P la c e d (a m 10m) 12:15 PM 1 :40 PM 3:00 PM 2:45 P M 3 :30 P M
D e p th 0 f Pie r F ro m Top 0 f Con c re te (ft) 41.60 42.50 42.20 41.20 42.20
Elevation: Surface (fO" 9 9 .50 9 9.50 99.50 99.50 99.50
Elevation: Top of Pier (ft).. 99.00 99.00 99.00 99.00 99.00
E Ie va tio n: Bolio m 0 f Pie r (fO" 57.40 56.50 56.80 57.80 56.80
Elevation: Top of Bearing Stratum (ft.)" 62.50 61 .50 62.60 63.50 63.50
Bearina Stratum (descriotion) G ra y s h a Ie
Note: See report # 302590 for Compressive Strength Test Specimens.
. Additional Penetration not requested unless noted. "Elevation by others
Remarks: 3 rigs - drilled at 30", penetrated with 24" auger
Technician: Bruce Eberts
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Attn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans
1-cc City of Coppell Attn: Mr. Larry Davis
1-cc City of Coppell Attn: Mr. Lee Stone
Started: 05:45am Finished: 03:00pm
Rone Engineering
V~~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by pensons or conditions over which we have no control. Our lettens and reports are
for the exclusive use of the clients to whom they are addressed and shall nol be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 3 of 3