Duke Lesley 1A-LR071019
Rone En2==
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 301349
Project No.: 0713408
Date of Service: 10/08/2007
Report Date: 10/19/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
Report of Inspection
D rille r: Auger Drilling
Pie r Id e ntifica tio n D /1 D /2 D /3
PierDiameter(in) 24 24 24
BeIIDiameter(in) 72 72 72
Required Minimum Depth (ft) 17.00 17.00 17.00
Depth of Pier Prior to Underreaming (ft) 17.50 18.20 17.90
Depth of Pier After Underreaming (ft) . NA NA 17.90
Condition of Bottom (wet/drv) NA NA NA
Plumb Within Tolerance (yes /no) NA NA NA
Casing Diameter(in)/Casing LenQth (ft) NA NA NA
NumberofBars /Reinforcing BarSize (#) NA NA NA
LenQth of ReinforcinQ Steel (ft) NA NA NA
Time Drilling was Completed (am /pm) NA NA NA
Time Concrete was Placed (am /pm) NA NA NA
D e p th 0 f Pie r Fro m Top 0 f Con ere te (ft) NA NA NA
Elevation: Surface (ft)" NA NA NA
E Ie vat ion: Top 0 f Pie r (ft).. NA NA NA
Elevation: Bottom of Pier (ft).. NA NA NA
Bearing Stratum (description) Native c la y / s h a Ie y cia y
Not e. See R e port # NA for Compressive Strength Test Specimens.
. Additional Penetration not requested unless noted. .. Elevation by Others.
Remarks: Tested three holes to see if bell would hold - all three caved in.
Technician: Jimmy Hall
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Attn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans
1-cc City of Coppell Attn: Mr. Larry Davis
1-cc City of Coppell Attn: Mr. Lee Stone
Started: 08: 15am Finished: 11 :30am
Rone Engineering
p~~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 1 of 1
Rone Eni==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 301593
Project No.: 0713408
Date of Service: 10/10/2007
Report Date: 10/19/2007
Project: Point West VI
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 3,000 psi @ 28 days
Slump (in.): 5" - 7"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9341
Placement Date: 10/10/2007
Weather Conditions: Clear
Time Sampled: 12:00pm
Temperature - Air: nOF
Truck No: 110
Air Content: NA
Overall Placement Location:
Piers (see report #301592)
Sample Location:
Pier J/2
REPORT OF TESTS
Batch time: 11: 19am
Concrete: 900F
Ticket No: 7881
Unit Weight (pcf): NA
Measured
Slump
(inches)
6.5
Concrete Compressive Cylinder 6" x 12"
Maximum
Load
(Ibs)
76,870
Cylinder
Marked Date
Set No. Tested
1 1 10/17/2007
1 2 11/07/2007
1 3 11/07/2007
4 12/05/2007
Age
(days)
7
Diameter
(in)
6.00
28
28
56
Remarks: Water added at site: 20 gallons
Area
(in')
28.27
Compressive
Strength
(psi)
2,720
Fracture
Type
Cone/Split
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Alln: Mr. Emmit Coots (1-ec copy)
1-cc Poller Concrete Alln: Mr. Ryan Skelly
1-cc Pacheco Koch Consulting Engineers Alln: Mr. Jack Evans
1-cc City of Coppell Alln: Mr. Larry Davis
1-cc City of Coppell Alln: Mr. Lee Stone
Rone Engineering
See Report 301592 'oct,,"";,''" um./*, ~
K. Scott Watson, AET
Project Manager
Technician: Jimmy Hall
;::;>
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 1 of 1
Rone Eni==
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (2141630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 302019
Project No.: 0713408
Date of Service: 10/12/2007
Report Date: 10/19/2007
Project: Point West VI
Coppell, Texas
Services: Perform In-Place Density Testing
PROJECT DATA
Contractor: Duke Construction, LP
Test Method: ASTM D-6938
Gauge: Troxler 3430
Gauge Serial No: 35518
Test Mode: DT
Standard Counts
Moisture Density
Current: 740 Current: 2501
Previous: 738 Previous: 2518
MOISTURE DENSITY RELATIONS
Maximum
Moisture Density Project Requirements
MID No. Description % (pet) Moisture Density
299552 Lime Treated Brown & Tan I Sandy Clay 30.3 85.7 Optimum +4 95 min
272998 Brown I Silty Clay wI Organics 22.5 96.5 Optimum +4 95 min
FIELD DENSITY TESTS
Test Probe MID Moisture Wet Density Dry Density Density
No Test Location Depth No. % (pet) (pet) (% maxi
-
Lime Treated Subgrade
Building pad A.5/34 6" 299552 22.5* 111.1 90.7 106
Lime Treated Subgrade
2 Building pad C.5/34 6" 299552 24.0* 111.5 89.9 105
Lime Treated Subgrade
3 Building pad E.5/34 6" 299552 25.9* 114.1 90.6 106
Lime Treated Subgrade
4 Building pad G.5/34 6" 299552 30.4 116.3 89.2 104
Lime Treated Subgrade
5 Building pad J.5/34 6" 299552 26.6* 120.5 95.2 111
Utility backfill
6 Storm line drain G, Station 0+50, final 6" 272998 24.6 102.9 82.6 86*
Utility backfill
7 Storm line drain G, Station 3+50, final 6" 272998 25.4 98.7 78.7 82*
An asterisk (*) appears next to results which do NOT meet the project specifications.
Technician: Joe Jernigan
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Alln: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Alln: Mr. Jack Evans
1-cc City of Coppell Alln: Mr. Larry Davis
1-cc City of Coppell Alln: Mr. Lee Stone
Started: 12:15pm Finished: 03:30pm
Rone Engineering
,~~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 1 of 1
Rone En2~
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Pulverization/Gradation Testing
Report No.: 302020
Project No.: 0713408
Date of Service: 10/12/2007
Report Date: 10/19/2007
Project: Point West VI
Coppell, Texas
Services: Pulverization/Gradation Testing
Report of Tests
Specifications:
passing
passing
1/2" sieve
#4 sieve
100%
60%
A B C D E
W e ig h t Percent W e ig h t Percent
Sam pie Retained Passing Retained Passing
Location We ig h t 1 1 12 " S ie v e 1 1 12 .. S ie v e #4 S ie v e #4 S ie v e
1 Building pad,grid Iln e A .5/36 10.3 0 1 00% 4.0 61 .1 %
2 Building pad,grid lin e C .5136 1 0 .0 0 1 00% 3.8 62.0 %
3 Building pad, grid Iln e E .5/36 10.5 0 1 00% 4.1 60.9 %
4 Building pad,grid lin e G .5136 1 0 .8 0 1 00% 4.2 61 .1 %
5 Building pad,grid line J.5/36 1 0 .7 0 100% 4 .2 60.7%
Technician: Joe Jernigan
Rone Engineering
See Report 302019 to' Ie,""";" IIm"p ~
Mr. Jack Evans K. Scott Watson, AET
Project Manager
~
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Attn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Altn:
1-cc City of Coppell Altn: Mr. Larry Davis
1-cc City of Coppell Altn: Mr. Lee Stone
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/KW) Page 1 of 1
Rone Eni~
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection Cancellation
Report No.: 302113
Project No.: 0713408
Date of Service: 10/15/2007
Report Date: 10/19/2007
Project: Point West VI
Coppell, Texas
Services: Drilled Pier Inspection Cancellation
Report of Cancellation
On this date a Rone Engineering Services, Ltd. representative arrived on site as scheduled. Upon arrival, our
representative was informed that testing/inspection was cancelled for the day.
Technician: Jimmy Hall Started: 06:15am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Altn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Altn: Mr. Jack Evans
1-cc City of Coppell Altn: Mr. Larry Davis
1-cc City of Coppell Altn: Mr. Lee Stone
Finished: 08:15am
Rone Engineering
P-~~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality
(composition. appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd.
(CH/KW) Page 1 of 1
Rone En2==
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection Cancellation
Report No.: 302163
Project No.: 0713408
Date of Service: 10/16/2007
Report Date: 10/19/2007
Project: Point West VI
Coppell, Texas
Services: Drilled Pier Inspection Cancellation
Report of Cancellation
On this date a Rone Engineering Services, Ltd. representative arrived on site as scheduled. Upon arrival, our
representative was informed that testing/inspection was cancelled for the day.
Technician: Jimmy Hall
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Alln: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Alln: Mr. Jack Evans
1-cc City of Coppell Alln: Mr. Larry Davis
1-cc City of Coppell Alln: Mr. Lee Stone
Started: 05:45am Finished: 07:45am
Rone Engineering
p~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 1
Rone En2==
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 301919
Project No.: 0713408
Date of Service: 10/12/2007
Report Date: 10/19/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
D ri lie r: A ua e r Drilling
Pier Identification C /1 1 B /1 2 C /1 2 D /1 1 D /1 2
PierDiameter(in) 24 24 24 24 24
De 0 th 0 f P ie r Fro m Surface (ft) 41 .00 42.00 41 .50 41.00 38.50
Deoth of Bear in a Stratum Fro m S u rfa c e (ft) 35.40 36.40 36.20 35.40 33.30
Reo u ire d Pen e tra ti 0 n (ft) 5.00 5.00 5.00 5.00 5.00
A ctua I P e ne tra tio n (ft)" 5.60 5.60 5.30 5.60 5.20
Condition of Bottom (wet/dry) Wet Wet Wet Wet Wet
Plumb Within Tolerance (yes /no\ Yes Yes Yes Yes Yes
Casino D iam eter (in) I Casino Lenoth (ft) 28137 2 8 /3 7 2 7 /3 6 2 8 /3 6 2 8 13 3
N u m b e r 0 f Bar s / Rei n fo rei n 0 Bar S i z e 6 1#6 6 / # 6 6 / # 6 6 / # 6 6 / # 6
Lenath of Reinforcina Steel (ft) 39.60 40.60 39.1 0 39.30 37.00
Time Drillina was Completed (am 10m) 10:50AM 11:35AM 1 1 :57 A M 12:50PM 1 :05 PM
Tim e Con ere te was P la c e d (a m 10m) 12:15 PM 1 2 :0 0 P M 1 :00 PM 1 :15 PM 2 :00 PM
Deoth of Pier From Top of Concrete (ft) 40.50 41 .50 41.00 40.50 38.00
Elevation: Surface (ft).. 99.50 99.50 99.50 99.50 99.50
Elevation: Too of Pier (ft)" 9 9.00 99.00 99.00 99.00 99.00
Elevation: Bottom of P ie r (ft).. 58.50 57.50 58.00 58.50 61 .00
Elevation: Too 0 f B ear i n a S t rat u m (ft.) " " 64.1 0 63.1 0 63.30 64.10 66.20
Bearina Stratum (description) Native cia v / s h a Ie vela v
Not e: See re port # NA for Com pressive Strength Test Specimens.
. Additional Penetration not requested unless noted HE levation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CHIKW) Page 2 of 4
Rone Eni==
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 301919
Project No.: 0713408
Date of Service: 10/12/2007
Report Date: 10/19/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
I
o rille r: A ug e r Drilling
Pier Identification E 112 E /1 1 E 110 D 110 D 19
Pie r D i am e te r (i n) 24 24 24 24 24
Depth of Pier From Surface (ft) 42.40 41.70 41.00 41 .00 41 .50
Depth of Bearing Stratum Fro m S urfa ce (ft) 36.70 35.20 35.20 35.00 35.70
Required Penetration (ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft)* 5.70 6.50 5.80 6.00 5.80
Condition of Bottom (wet/drv) Wet Wet Wet Wet Wet
Plumb Within Tolerance (ves Ino) Yes Yes Yes Yes Yes
Casinq Diameter(in)/Casinq Lenqth(ft) 2 8/3 7 28/35 2 8 13 5 2 8 13 7 2 8 13 6
NumberofBars IReinforcina BarSize 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6
Length of Reinforcing Steel (fO 40.60 40.00 39.60 39.60 39.80
Time Drillinq was Completed (am Ipm) 1 :50 PM 2:15 PM 2:40 PM 3:00 PM 3:45 PM
Tim e Con c re te was P la c e d (a m I pm) 2:10 PM 3:05 PM 3:20 PM 3:50 PM 4:05 PM
DepthofPierFrom Too of Concrete (ft) 41 .90 41 .20 40.50 40.50 41.00
Elevation: Surface (ft)** 99.50 99.50 99.50 99.50 99.50
Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft)** 57.10 57.80 58.50 58.50 58.00
Elevation: Too 0 f B ear in a S t rat u m (ft.) ** 62.80 64.30 64.30 64.50 63.80
B e a ri n q S tra tu m (d e s c ri p ti 0 n) Native clay I shalev clav
Note: See re port # NA for Com pressive Strength Test S pecim ens.
* Additional Penetration not requested un Ie s s note d . **E levation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 3 of 4
Rone En~==
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 301919
Project No.: 0713408
Date of Service: 10/12/2007
Report Date: 10/19/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: AugerDrilling
Pie rid e ntifica tio n D /8
PierDiameter(in) 24
Depth of Pier From Surface(ft) 37.50
Depth of Bearing Stratum Fro m Surface(ft) 31.40
Required Penetration (ft) 5.00
Actual Penetration (ft)' 6.1 0
Condition of Bottom (wet/dry) Wet
Plum b Within Tolerance (yes 1 no) Yes
Casing Diameter(in)/Casing Length (ft) 28/33
NumberofBars IReinforcing BarSize 6 / # 6
Length of Reinforcing Steel (ft) 36.10
Time Drillina was Completed (am /om) 3 :5 5 PM
Tim e Con c re te was P la c e d (a m 1 pm) 4:10 PM
Depth of Pier From Top of Cone rete (ft) 37.00
E Ie va tio n: S urfa ce (ft).. 99.50
Elevation: Top of Pier (ft).. 99.00
Elevation: Boltom of Pie r (ft)" 6 2.00
E Ie va ti 0 n : Top of Bearing Stratum (ft.)" 68.1 0
Bearing Stratum (descriotion) Native clay / shaley clav
Not e: See re port II NA for Compressive Strength Test Specimens.
. Additional Penetration not requested unless noted HE levation by others
Technician: Jimmy Hall Started: 06:15am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Alln: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Alln: Mr. Jack Evans
1-cc City of Coppell Alln: Mr. Larry Davis
1-cc City of Coppell Alln: Mr. Lee Stone
Finished: 06:15pm Rone Engineering
p~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, LId.
(CH/KW) Page 4 of 4
Rone En2=:=
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 301919
Project No.: 0713408
Date of Service: 10/12/2007
Report Date: 10/19/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
Report of Inspection
D rille r: AuaerDrillina
Pie r Id e ntifica tio n C 19 C 110 B 19 B 110 B 11 1
Pie r D i a mete r (i n) 24 24 24 24 24
Deoth of Pier From Surf ace (ft) 41 .70 41 .00 40.80 38.60 41 .1 0
Depth of Bear in a Stratum Fro m Surface(ft) 36.70 35.70 35.00 33.00 35.00
Required Penetration (fO 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft)' 5.00 5.30 5.80 5.60 6.10
Condition of Bottom (wet/dry) Dry Wet Wet Wet Wet
Plumb Within Tolerance (yes Ino) Yes Yes Yes Yes Yes
Casing Diameter(in)/Casing Lenath (ft) 2 8/3 7 2 7/37 2 7 13 6 28/33 27/36
NumberofBars IReinforcina BarSize 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6
Length of Reinforcing Steel (ft) 40.00 39.00 39.40 36.90 39.60
Time Drilling was Comoleted (am 10m) 8:00 AM 8 :30 AM 9 :0 0 A M 9 :30 AM 10:15AM
Time Concrete was Placed (am Ipm) 9 :05 AM 9:20 AM 1 0 :3 0 A M 10:50 AM 11:15AM
D e p th 0 f Pie r F ro m Top 0 f Con c re te ( ft) 41 .20 40.50 40.30 38.1 0 40.60
Elevation: Surface (ft).. 99.50 99.50 99.50 99.50 99.50
Elevation:Top of Pier (ft).. 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pie r (ft)" 5 7.80 58.50 58.70 60.90 58.40
Elevation: Top of Bearina Stratum (ft.) .. 62.80 63.80 64.50 66.50 64.50
Bearina Stratum (descriotion) Native clay I shaley clay
Note:See report# NA forCompressive StrengthTestSpecimens.
. Additional Penetration not requested unless noted. "Elevation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 4