Report of In-Place Density Testing
Report No.: 301699
Project No.: 0713408
Date of Service: 10/10/2007
Report Date: 10/18/2007
Project: Point West VI
Coppell, Texas
Services: Perform In-Place Density Testing
PROJECT DATA
Contractor: Duke Construction, LP
T est Method: ASTM D-6938
Gauge: Troxler 3430
Gauge Serial No: 35518
Test Mode: DT
Standard Counts
Moisture Density
Current: 739 Current: 2508
Previous: 737 Previous: 2504
MOISTURE DENSITY RELATIONS
Maximum
Moisture Density Project Requirements
MID No. Description % (pet) Moisture Density
299552 Lime Treated Brown & Tan / Sandy Clay 30.3 85.7 Optimum +4 95 min
FIELD DENSITY TESTS
Test Probe MID Moisture Wet Density Dry Density Dens ity
No Test Location Depth No. % (pet) (pet) (%max)
-
Lime Treated Subgrade
Building pad, grid line A.5/28 6" 299552 32.9 111.4 83.8 98
Lime Treated Subgrade
2 Building pad, grid line C.5/28 6" 299552 31.3 111.6 85.0 99
Lime Treated Subgrade
3 Building pad, grid line E.5/28 6" 299552 33.9 111.1 83.0 97
Lime Treated Subgrade
4 Building pad, grid line G.5/28 6" 299552 33.9 111.3 83.1 97
Lime Treated Subgrade
5 Building pad, grid line J.5/28 6" 299552 32.9 111.5 83.9 98
Lime Treated Subgrade
6 Building pad, grid line A.5/3D 6" 299552 31.7 111.7 84.8 99
Lime Treated Subgrade
7 Building pad, grid line C.5/30 6" 299552 33.7 111.6 83.5 97
Lime Treated Subgrade
8 Building pad, grid line E.5/30 6" 299552 33.5 110.9 83.1 97
Lime Treated Subgrade
9 Building pad, grid line G.5/30 6" 299552 30.4 111.9 85.8 100
L1MITA nONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 1 of 2
Rone En~==
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 301699
Project No.: 0713408
Date of Service: 10/10/2007
Report Date: 10/18/2007
Project: Point West VI
Coppell, Texas
Services: Perform In-Place Density Testing
FIELD DENSITY TESTS
Test Probe MID Moisture Wet Density Dry Density Density
No Test Location Depth No. 0/0 (pet) (pet) ("to max)
Lime Treated Subgrade
10 Building pad, grid line J.5/30 6" 299552 30.8 111.6 85.3 100
Technician: Joe Jernigan
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Attn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Alln: Mr. Jack Evans
1-cc City of Coppell Alln: Mr. Larry Davis
1-cc City of Coppell Alln: Mr. Lee Slone
Started: 09:30am Finished: 11 :OOam
Rone Engineering
P'~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 2 of 2
Rone En2==
8908 Ambassador Row, Dallas, TX 75247
7701 W little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 301526
Project No.: 0713408
Date of Service: 10/09/2007
Report Date: 10/18/2007
Project: Point West VI
Coppell, Texas
Services: Perform In-Place Density Testing
PROJECT DATA
Contractor: Duke Construction, LP
Test Method: ASTM 0-6938
Gauge: Troxler 3430
Gauge Serial No: 35518
Test Mode: DT
Standard Counts
Moisture Density
Current: 737 Current: 2504
Previous: 735 Previous: 2507
MOISTURE DENSITY RELATIONS
MID No.
299552
Description
Lime Treated Brown & Tan / Sandy Clay
Moisture
%
Maximum
Density
(pct)
85.7
Project Requirements
Moisture Density
Optimum +4 95 min
30.3
FIELD DENSITY TESTS
Test Probe MID Moisture Wet Density Dry Density Density
No Test Location Depth No. % (pct) (pct) (%max)
- -
Lime Treated Subgrade
Building pad, grid line A.5/26 6" 299552 32.1 111.1 84.1 98
Lime Treated Subgrade
2 Building pad, grid line A.C/26 6" 299552 31.0 112.0 85.5 100
Lime Treated Subgrade
3 Building pad, grid line A.E/26 6" 299552 32.3 111.4 84.2 98
Lime Treated Subgrade
4 Building pad, grid line A.G/26 6" 299552 32.9 111.6 84.0 98
Lime Treated Subgrade
5 Building pad, grid line A.J/26 6" 299552 30.6 111.5 85.4 100
Technician: Joe Jernigan
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Alln: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Alln: Mr. Jack Evans
1-cc City of Coppell Alln: Mr. Larry Davis
1-cc City of Coppell Alln: Mr. Lee Stone
Started: 01 :OOpm Finished: 03:00pm
Rone Engineering
p~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 1 of 1
Rone Eni==
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 301385
Project No.: 0713408
Date of Service: 10/08/2007
Report Date: 10/18/2007
Project: Point West VI
Coppell, Texas
Services: Perform In-Place Density Testing
PROJECT DATA
Contractor: Duke Construction, LP
Test Method: ASTM D-6938
Gauge: Troxler 3430
Gauge Serial No: 35518
Test Mode: DT
Standard Counts
Moisture Density
Current: 735 Current: 2507
Previous: 742 Previous: 2502
MOISTURE DENSITY RELATIONS
MID No.
299552
Description
Lime Treated Brown & Tan / Sandy Clay
Moisture
%
Maximum
Density
(pet)
85.7
Project Requirements
Moisture Density
Optimum +4 95 min
30.3
FIELD DENSITY TESTS
Test Probe MID Moisture Wet Density Dry Density Density
No Test Location Depth No. % (pet) (pet) (% max)
-
Lime Treated Subgrade
Building pad, grid line A.5/20 6" 299552 30.3 109.7 84.2 98
Lime Treated Subgrade
2 Building pad, grid line C.5/20 6" 299552 32.7 109.6 82.6 96
Lime Treated Subgrade
3 Building pad, grid line E.5/20 6" 299552 32.4 110.0 83.1 97
Lime Treated Subgrade
4 Building pad, grid line G.5/20 6" 299552 31.1 110.1 84.0 98
Lime Treated Subgrade
5 Building pad, grid line J.5/20 6" 299552 31.8 109.8 83.3 97
Technician: Joe Jernigan Rone Engineering
Report O;striOulloe, S.. Report 301,... to, I.ohe'o'oo Iim. ~. ~~..
Orig: Duke Construction, LP (Dallas, TX) . ~
Altn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Altn: Mr. Jack Evans K. Scott Watson, AET
1-cc City of Coppell Altn: Mr. Larry Davis Project Manager
1-cc City of Coppell Altn: Mr. Lee Stone
~
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 1 of 1
Rone En2==
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Pulverization/Gradation Testing
Report No.: 301527
Project No.: 0713408
Date of Service: 10/09/2007
Report Date: 10/18/2007
Project: Point West VI
Coppell, Texas
Services: Pulverization/Gradation Testing
Report of Tests
Specifications:
passing
passing
112" sieve
#4 sieve
100%
60%
A B C 0 E
W e ig h t Percent W e ig h t Percent
Sam pie Retained Passing Retained Passing
Location We ig h t 1 112 " S ie v e 1 112 " S ie v e #4 S ie v e #4 S ie v e
1 Building pad, grid lin es A .5126 1 0 .0 0 100% 3 .2 68.0 %
2 Building pad,grld lin e s C .5/26 10.0 0 100% 3.6 64.0 %
3 Building pad, grid I in e s E .5/26 1 0 .0 0 100 % 3.0 70.0 %
4 Building pad,grid lin es G .5126 1 0 .0 0 1 00% 3.1 69.0 %
5 Building pad,grid lines J.5126 1 0 .0 0 1 00% 2.9 71.0 %
Technician: Joe Jernigan
Rone Engineering
800 Report 301526 ro, te,h"~;," t;me~ ~
Mr. Jack Evans K. Scott Watson, AET
Project Manager
~
Report Distribution:
Orig: Duke Construction. LP (Dallas, TX)
AUn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Attn:
1-cc City of Coppell AUn: Mr. Larry Davis
1-cc City of Coppell AUn: Mr. Lee Stone
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/KW) Page 1 of 1
Rone En2==
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Pulverization/Gradation Testing
Report No.: 301870
Project No.: 0713408
Date of Service: 10/11/2007
Report Date: 10/18/2007
Project: Point West VI
Coppell, Texas
Services: Pulverization/Gradation Testing
Report of Tests
Specifications:
passing
passing
112" sieve
#4 sieve
100%
60%
A B C 0 E
We ig h t Percent W e ig h t Percent
Sam pie Retained Passing Retained Passing
Location W e ig h t 1 112" Sieve 1 112" Sieve #4 S ie v e #4 S ie v e
1 Building pad, grid lin es A .5134 1 0 .3 0 100% 4.0 61 .1 %
2 Building pad, grid lin e s C .5134 1 0 ,0 0 100 % 3.8 62.0 %
3 Building pad,grid Ii n e s E .5134 1 0 .0 0 100% 3.9 61 .0 %
4 Building pad,grid lin es G .5/34 1 0 .7 0 1 00% 4.1 61.7%
5 Building pad, grid lines J,5134 10.5 0 100 % 4.1 60.9 %
Technician: Joe Jernigan Rone Engineering
Report Distribution: See Report 301869 for technician time~. ~.,
Orig: Duke Construction, LP (Dalias, TX) . ~-=
Altn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Altn: Mr. Jack Evans K, Scott Watson, AET
1-cc City of Coppeli Altn: Mr. Larry Davis Project Manager
1-cc City of Coppeli Altn: Mr. Lee Stone
;::::>
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 1
Rone Eni==
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 301592
Project No.: 0713408
Date of Service: 10/10/2007
Report Date: 10/18/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
Report of Inspection
D rille r: A ua e r D rillina
Pie r Id e ntifica tio n K 12 J/2 H/2 G 12 F 12
Pier Diameter (in) 24 24 24 24 24
D eo th 0 f Pie r Fro m S u rfa c e (ft) 38.00 37.70 38.00 36.20 40.30
Deoth of Bear in a Stratum Fro m S urfa ce (ft) 30.80 32.60 32.00 31 .20 33.90
ReQuired Penetration (ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (fl)- 7.20 5.10 6.00 5.00 6.40
Condition of Bottom (wet/dry) Wet Wet Wet Wet Wet
Plumb Within Tolerance (ves Ino) Ves Yes Yes Ves Ye s
CasinQ Diameter(in)/Casina Lenath(ft) 2 8/3 7 2 4 13 6 28/32.6 28/32.6 27/31.3
NumberofBars IReinforcina BarSize 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6
Lenath of Reinforcina Steel (ft) 37.00 36.30 37.30 34.90 39.00
Time Drillina was Completed (am Ipm) 8 :3 5 AM 1 0 :4 5 A M 12:00 PM 2 :40 P M 3:35 PM
Time Concrete was Placed (am Ipm) 1 1 :20 AM 1 1 :45 AM 1 2 :55 PM 3:15 PM 4 :1 5 PM
Depth of Pier From Top of Concrete (ft) 37.50 37.20 37.50 35.70 39.80
E Ie va tio n: S u rfa ce (ft)** 99.50 99.50 99.50 99.50 99.50
Elevation:Too ofPier(ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft)** 61.50 61 .80 61 .50 63.30 59.20
Elevation: Top of Bearina Stratum (ft.)** 68.70 66.90 67.50 68.30 65.60
Bearina Stratum (description) Native clay I shaley clay
Note: See report# NA for Compressive Strength TestSpecimens.
- Add itiona I P enetratio n not req uested unle ss noted. **E Ie va tio n by othe rs
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, elc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 2
Rone Eni==
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, 8te 600, Houston, TX 77040
4421 Freidrich, 8te 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 301592
Project No.: 0713408
Date of Service: 10/10/2007
Report Date: 10/18/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: Auaer Drilling
Pie rid e ntifica tio n E 12
PierDiameter(in) 24
Depth of Pier From Surface(ft) 38.90
DeDth of Bear in a Stratum Fro m Surface(ft) 33.09
Reauired Penetration (ft) 5.00
A ctua I P e ne tra tio n (ft)" 5.81
Condition of Bottom (wet/dry) Wet
Plumb Within Tolerance (yes Ino) Yes
Casing Diameter(in)/Casing Length (ft) 2 7/37
NumberofBars IReinforcina BarSize 6 1#6
Lenath of Reinforcina Steel (ft) 37.50
Time Drillina was Completed (am Ipm) 4 :4 5 P M
Time Concrete was Placed (am Ipm) 4 :5 5 PM
De D th 0 f Pie r Fro m Top 0 f Con c re te (ft) 38.40
Elevation: Surface (ft).. 99.50
Elevation: Top of Pier (ft).. 99.00
Elevation: Bottom of Pier (ft).. 60.60
Elevation: Top of Bear in a Stratum (ft.)" 66.41
Bearina Stratum (descriDtion) Native clay Ishaley clay
Not e: See re port # NA for Compressive Strength Test Specimens.
"Additional Penetration not requested unless noted HE levation by others
Remarks: 1</2 will require special detail and Dick with Duke will give me a copy tomorrow for it.
Technician: Jimmy Hall Started: 06:00am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
AUn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers AUn: Mr. Jack Evans
1-cc City of Coppell Alln: Mr. Larry Davis
1-cc City of Coppell Alln: Mr. Lee Stone
Finished: 05:45pm Rone Engineering
P-~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 2 of 2
Rone Eni~
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 301761
Project No.: 0713408
Date of Service: 10/11/2007
Report Date: 10/18/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
Report of Inspection
D ri lie r: AuaerDrillina
Pier Identification D 12 C 12 B 12 B 13 B 14
Pier Diameter (in) 24 24 24 24 24
Depth of Pier From Surface (ft) 37.40 39.50 39.70 38.40 41 .20
Depth of Bearing Stratum Fro m Surface(ft) 31 .20 34.40 34.60 32.40 36.20
ReQuired Penetration (ft) 5.00 5.00 5.00 5.00 5.00
A ctua I P e ne tra tio n (ft)" 6.20 5.1 0 5.10 6.00 5.00
Condition of Bottom (wet/dry) Wet Wet Wet Wet Wet
Plumb Within Tolerance (yes Ino) Yes Yes Yes Yes Yes
Casing Diameter(in)/Casina Lenath (ft) 28/32 .2 28/36.2 2 7 13 7 2 8 13 1 1 8/36
NumberofBars IReinforcing BarSize 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6
Le ng th of R e info rCing S te e I (ft) 36.00 38.00 38.20 36.90 40.00
Time Drillina was Completed (am Ipm) 8 :00 AM 8:35 AM 9:15 AM 9 :3 5 AM 10:15AM
Time Concrete was Placed (am Ipm) 9 :20 AM 9:10 AM 1 0 :1 0 AM 10:20 AM 11:35AM
Depth of Pier From Top of Concrete (ft) 36.90 39.00 39.20 37.90 40.70
Elevation: Surface (fl)*" 99.50 99.50 99.50 99.50 99.50
Elevation:Top of Pier (ft).. 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft).. 62.1 0 60.00 59.80 61 .1 0 58.30
Elevation: Top of Bearing Stratum (ft.) .. 68.30 65.10 64.90 67.1 0 63.30
BearinQ Stratum (description) Native cia y Ish a Ie y cia y
Note:See report# NA forCompressive StrengthTestSpecimens.
"Additional Penetration not requested unless noted. "Elevation by others
lIMITA nONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for vanation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 3
Rone Eni~
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 301761
Project No.: 0713408
Date of Service: 10/11/2007
Report Date: 10/18/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: Auger Drilling
Pie r Id e n Ii fi cat ion B 15 C 13 C 14 C 15 C 16
PierDiameter(in) 24 24 24 24 24
De p th 0 f P ie r Fro m Surface(ft) 41 .20 38.30 40.00 40.80 40.00
Depth of Bearing Stratum Fro m Surface (ft) 34.40 32.40 34.40 35.10 34.60
Required Penetration (ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft)* 6.80 5.90 5.60 5.70 5.40
Condition of Bottom (wet I dry) Wet Wet Wet Wet Wet
Plumb Within Tolerance (yes Ino) Yes Yes Yes Yes Yes
CasinQ Diameter(in)/Casing Length (ft) 2 7/3 7 2 8 13 3 2 7 13 7 2 8/3 6 2 7 13 7
NumberofBars IReinforcing BarSize 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6
Length of Reinforcing Steel(ft) 39.90 36.90 38.90 39.80 39.20
Time Drilling was Completed (am Ipm) 1 1 :05 AM 11:35AM 1 :30 PM 2 :3 0 PM 2 :4 5 P M
Tim e Con c re te was Pia c e d (a m I pm) 12:10PM 1:10 PM 2 :20 P M 3 :2 0 P M 3 :40 P M
D e p th 0 f P ie r Fro m Top 0 f Con c re te (ft) 40.70 37.80 39.50 40.30 39.50
Elevation: Surface (ft).. 99.50 99.50 99.50 99.50 99.50
Elevation: Top of Pier (ft).. 99.00 99.00 99.00 99.00 99.00
E Ie va tio n: Botto m 0 f Pie r (ft).. 58.30 61 .20 59.50 58.70 59.50
Elevation: Too of Bearing Stratum (ft.)" 65.1 0 67.1 0 65.10 64.40 64.90
Bearing Stratum (description) Native cia y Ish a Ie y cia y
Note: See re port # NA for Com pressive Strength Test Specimens.
. Additional Penetration not requested unless noted. HE levation by others
liMITATiONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 2 of 3
Rone En2~
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 301761
Project No.: 0713408
Date of Service: 10/11/2007
Report Date: 10/18/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: AuaerDrillina
Pie rid e ntifica tio n B /6 B /7 C /7 C /8 B /8
Pier Diameter (in) 24 24 24 24 24
De p th 0 f Pie r Fro m Surface(ft) 37.10 41 .30 41.00 40.40 41.70
Depth of Bearing Stratum Fro m Surface(ft) 31 .10 36.00 35.30 35.40 36.60
Reauired Penetration (ft) 5.00 5.00 5.00 5.00 5.00
A ctua I P e ne tra tio n (ft)' 6.00 5.30 5.70 5.00 5.1 0
Condition of Bottom (wet / dry) Wet Wet Wet Wet Wet
Plum b Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing D iam eter (in) / Casino Lenath (ft) 2 8 /3 3 2 7 /3 7 2 8/3 6 2 7 /3 7 2 7/37
Num ber of Bars / Reinforcing Bar Size 6 / # 6 6 / # 6 6 / #6 6 / # 6 6 / #6
Length of Reinforcing Steel(ft) 35.70 39.70 39.70 38.70 40.50
Tim e Drilling was Com pleted (am / pm) 3 :20 P M 3 :5 0 PM 4 :2 0 P M 4 :5 5 PM 5 :1 5 PM
Tim e Con c re te was P la c e d (a m / pm) 4 :05 P M 4 :3 0 PM 4 :50 PM 5:10 PM 5 :30 PM
Depth of Pier From Top of Concrete (ft) 36.60 40.80 40.50 39.90 41 .20
E Ie va tio n: S urfa ce (ft).. 99.50 99.50 99.50 99.50 99.50
Elevation: Top of Pier (ft).. 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft)" 6 2.40 58.20 58.50 59.1 0 57.80
Elevation: Top of Bearing Stratum (ft.)" 68.40 63.50 64.20 64.10 62.90
Bearing Stratum (description) Native cia y / s h a Ie y cia y
Note: See report # NA for Compressive Strength Test Specimens.
. Additional Penetration not requested unless noted HE levation by others
Technician: Jimmy Hall Started: 06:15am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
AUn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers AUn: Mr. Jack Evans
1-cc City of Coppell AUn: Mr. Larry Davis
1-cc City of Coppell AUn: Mr. Lee Stone
Finished: 06:15pm Rone Engineering
p~
;:;:>
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 3 of 3
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 301835
Project No.: 0713408
Date of Service: 10/11/2007
Report Date: 10/18/2007
Project: Point West VI
Coppell, Texas
Services: Perform In-Place Density Testing
PROJECT DATA
Contractor: Duke Construction, LP
Test Method: ASTM D-6938
Gauge: Troxler 3430
Gauge Serial No: 35518
Test Mode: DT
Standard Counts
Moisture Density
Current: 738 Current: 2518
Previous: 739 Previous: 2508
MOISTURE DENSITY RELATIONS
MID No.
272998
Description
Brown I Silty Clay wI Organics
Moisture
%
Maximum
Density
(pet)
96.5
Project Requirements
Moisture Density
Optimum +4 95 min
22.5
Test
No
Test Location
FIELD DENSITY TESTS
Probe MID
Depth No.
Moisture Wet Density Dry Density Density
% (pet) (pet) (% max)
Utility backfill
Sanitary sewer line S-1, Station 22+00, 2' below 6" 272998 24.3 117.5 94.5 98
grade
Utility backfill
2 Sanitary sewer line S-1, Station 22+00, final 6" 272998 24.4 117.3 94.3 98
Utility backfill
3 Sanitary sewer line S-1, Station 25+00, 2' below 6" 272998 24.0 116.9 94.3 98
grade
Utility backfill
4 Sanitary sewer line S-1, Station 25+00, final 6" 272998 23.8 116.7 94.3 98
Technician: Joe Jernigan
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Attn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans
1-cc City of Coppell Attn: Mr. Larry Davis
1-cc City of Coppell Attn: Mr. Lee Stone
Started: 08:30am Finished: 10:00am
Rone Engineering
p~~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 301869
Project No.: 0713408
Date of Service: 10/11/2007
Report Date: 10/18/2007
Project: Point West VI
Coppell, Texas
Services: Perform In-Place Density Testing
PROJECT DATA
Contractor: Duke Construction, LP
Test Method: ASTM D-6938
Gauge: Troxler 3430
Gauge Serial No: 35518
Test Mode: DT
Standard Counts
Moisture Density
Current: 738 Current: 2518
Previous: 739 Previous: 2508
MOISTURE DENSITY RELATIONS
MID No.
299552
Description
Lime Treated Brown & Tan 1 Sandy Clay
Moisture
%
Maximum
Density
(pet)
85.7
Project Requirements
Moisture Density
Optimum +4 95 min
30.3
FIELD DENSITY TESTS
Test Probe MID Moisture Wet Density Dry Density Density
No Test Location Depth No. % (pet) ( pet) (% maxI
Paving subgrade
Building pad, grid line A.5/32 6" 299552 30.3 109.7 84.2 98
Paving subgrade
2 Building pad, grid line C.5/32 6" 299552 32.7 109.6 82.6 96
Paving subgrade
3 Building pad, grid line E.5/32 6" 299552 32.4 110.0 83.1 97
Paving subgrade
4 Building pad, grid line G.5/32 6" 299552 31.1 110.1 84.0 98
Paving subgrade
5 Building pad, grid line J.5/32 6" 299552 31.8 109.8 83.3 97
Technician: Joe Jernigan
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Attn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans
1-cc City of Coppell Attn: Mr. Larry Davis
1-cc City of Coppell Attn: Mr. Lee Stone
Started: 12:00pm Finished: 03:30pm
Rone Engineering
p~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 1 of 1