Loading...
Duke Lesley 1A-LR071013 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 ~ Project: POi~St VI cop~exas Services: Pulverization/Gradation Testing Report of Pulverization/Gradation Testing Report No.: 301700 Project No.: 0713408 Date of Service: 10/10/2007 Report Date: 10/13/2007 Report of Tests Specifications: passing passing 112" sieve #4 sieve 1 00% 60% A B C 0 E W e ig h t Percent W e ig h t Percent Sam pie Retained Passing Retained Passing Location W e ig h t 1 1 12 " S ie v e 1 112 " S ie v e #4 S ie v e #4 S ie v e 1 Building pad,grid Ii n e s A .5130 1 1 .6 0 100% 4.6 60.3 % 2 Building pad, grid I in e s C .5/30 1 1 .5 0 1 00% 4.3 62.6 % 3 Building pad, grid Ii n e s E .5130 1 1 .0 0 1 00% 4.2 61 .8 % 4 Building pad, grid Ii n e s G .5/30 1 1 .4 0 1 00% 4.1 64.0 % 5 Building pad,grid Ii n e s J. 5/3 0 1 1 .5 0 1 00% 4 .2 63.4 % 6 Building pad,grid lines A.5 1 0 .9 0 1 00% 4.2 61.4 % 7 Building pad,grid Ii n e s C.5 1 0 .9 0 1 00% 4.0 63.3 % 8 Building pad,grid I in e s E.5 1 1 .0 0 100% 4.3 60.9 % 9 Building pad,grid Ii n e s G .5 1 1 .0 0 100% 4 .1 62.7 % 1 0 Building pad, grid linesJ.5 10.8 0 1 00% 4.1 62.0 % 111:h/~1 Technician: Joe Jernigan Rone Engineering Report D;.lribubo", Se, Report 301699 fon,,""";oo t;m'~. . .~. Orig: Duke Construction, LP (Dallas, TX) ~~ Attn: Mr. Emmit Coots (1-ec copy) 1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans K. Scott Watson, AET 1-cc City of Coppell Attn: Mr. Larry Davis Project Manager 1-cc City of Coppell Attn: Mr. Lee Stone ~ LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd. (TM/LB) Page 1 of 1 Rone En~== 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Pulverization/Gradation Testing Report No.: 301384 Project No.: 0713408 Date of Service: 10/08/2007 Report Date: 10/13/2007 Project: Point West VI Coppell, Texas Services: Pulverization/Gradation Testing Report of Tests Specifications: passing passing 1/2" sieve #4 sieve 100% 60% A B C 0 E We ig h t Percent W e ig h t Percent Sam pie Retained Passing Retained Passing Location W e ig h t 1 1 /2 " S ie v e 1 1 /2 " S ie v e #4 S ie v e #4 S ie v e 1 Building pad, grid lin es A .5/22 1 3 .4 0 100% 4.6 65.6 % 2 Building pad, grid lin es C .5/22 1 1 .2 0 100% 3.5 68.7% 3 Building pad,grid lin es E .5/22 1 1 .5 0 100% 4.4 61 .7% 4 Building pad,grid lin es G .5122 1 1 .2 0 100% 4.1 63.3 % 5 Building pad,grid lines J.5/22 1 1 .3 0 1 00% 4.2 62.8 % Technician: Joe Jernigan Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Emmit Coots (1-ec copy) 1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans 1-cc City of Coppell Attn: Mr. Larry Davis 1-cc City of Coppell Attn: Mr. Lee Stone Started: 09:30am Finished: 11 :45am Rone Engineering p~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlLB) Page 1 of 1 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Water Injection Inspection Report No.: 301130 Project No.: 0713408 Date of Service: 10/05/2007 Report Date: 10/13/2007 Project: Point West VI Coppell, Texas Services: Water Injection Observation Report of Inspection Description I Explanation 1. Specific gravity of lime was checked and found to be between 1.14 and 1.17 2. Lime slurry was continuously agitated 3. Surfactant was added to each load 4. The injection pressure was kept between 50 to 100 psi at point of injection 5. Intervals of 12" were achieved during injection process until refusal 6. Total depth of injection - 12' 7. Max. spacing of injection probes was recorded to be 5' 8. Free water on surface 9. Square feet injected on this date 10. Location of injection NA NA Yes Yes Yes Yes Yes Yes 20,000 sq. ft. Remarks: See attached for sketch of injected area, pass number for each area, and dimension of injection area. Technician: Denny Harris Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Emmit Coots (1-ec copy) 1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans 1-cc City of Coppell Atln: Mr. Larry Davis 1-cc City of Coppell Attn: Mr. Lee Stone Started: 06:15am Finished: 04:15pm Rone Engineering V~~ K. Scott Watson, AET Project Manager LIMIT A TIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/LB) Page 1 of 1 t'-.{ C) t- ,'- t(l!:- 0::: ~ ~-.. r.. c-- t \-1...../ W 0 PPi=~~ i ~- :B" ;:. 'i! '";; ~ c~ - I;:), ~ .< <> ~~ \.,'" ~ ~~ g- ~ ~ ~.."'::I d <:] ~ ~ ~~. ~ -~ [jj ~ *~~e- ') ~ - '" .~ .~ }~ U -<O?C":: ~ C,.j Q cJ ~\ ~~ 11 :5 --+ o;j-;; ~ ~~ ;5' ,.., >-< l-! Ot"'l r- '-~ .., ~z () ... }~, < r- CJ (~, ~ ~C) 0 ... ~~ . ~; ~(.~ . Z U ~-o-.( ~~ _~ N ()-1 k ~ -- r.l] . r,:;) ~7" ~ . . r.....~ 1. t-.... t:' ~~~ - ~ :r\ OS ~~ 'U -. 1 ;f! ~ ~ ~ tiJ ~~ ~ J\ ~ ~ \\ ~ '--.9 it ~.fL -:J . 1\ '1' V\ -6 'S. c;c:>- IL- ...... 10 '., "fJ'\ -+ ~ Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston. TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Water Injection Inspection Report No.: 301267 Project No.: 0713408 Date of Service: 10/06/2007 Report Date: 10/13/2007 Project: Point West VI Coppell, Texas Services: Water Injection Observation Report of Inspection Description I Explanation 1. Specific gravity of lime was checked and found to be between 1.14 and 1.17 2. Lime slurry was continuously agitated 3. Surfactant was added to each load 4. The injection pressure was kept between 50 to 100 psi at point of injection 5. Intervals of 12" were achieved during injection process until refusal 6. Total depth of injection - 12' 7. Max. spacing of injection probes was recorded to be 5' 8. Free water on surface 9. Square feet injected on this date 10. Location of injection NA NA Yes Yes Yes Yes Yes Yes 10,000 sq .ft. Remarks: See attached for sketch of injected area, pass number for each area, and dimension of injection area. Technician: Denny Harris Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Emmit Coots (1-ec copy) 1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans 1-cc City of Coppell Attn: Mr. Larry Davis 1-cc City of Coppell Attn: Mr. Lee Stone Started: 06:15am Finished: 11 :OOam Rone Engineering P-ad- ~ K. Scott Watson, AET Project Manager LIMIT A nONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/LB) Page 1 of 1 . !; ~::;; ~ I riot-I:- l.f'1t:-c::l~ t-r-r-6 pp~G ,.... ~- ~- ~- E . ~ g ~ d _.......r ...:::I ~ ~ \() ~ c:: ...~- ~g"""p... L.. '-:) ~ ~ o ~ - gO ":J 4....1 :J 'l.- c-;"10 :G'JC-p.. Cl _:: ;; ..:>,:::,,,,,, 2;H'"' -<;>-C~ <:::l "_ 0-" e-,t::"" "";:3"E ?i~ >-1<-1 OH I:-"/" c- 11 ~ z j~t2 ~8 . ~ F<. ho- U ~ ~ l==< ~ -- ~ _U'J k.~ ..Z ~~ r:~ oS~~ Ui b ~ 1; 5 t Q} ~ S ~ J\ ~ ~ \\ ~ l)O if 1 ~ a- ~