Loading...
Duke Lesley 3C-LR071031 Rone En~~ Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 300429 Project No.: 0711530 Date of Service: 09/29/2007 Report Date: 10/31/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 5" maximum Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Batch time: 07:08am Concrete: 830F Ticket No: 14117 Unit Weight (pcf): NA Measured Slump (inches) 4.5 Mix Design 1.0.: 7752PW Placement Date: 09/29/2007 Weather Conditions: Clear Time Sampled: 07:12am Temperature - Air: 760F Truck No: 136 Air Content: NA Overall Placement Location: Southeast approach off BelUine Road/Center East approach off Beltline Road Sam pie Location: Tie-in approach to paving off Beltline Road REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (inZ) (Ibs) (psi) Type 1 1 10/06/2007 7 6.00 28.27 92,600 3,280 Shear 1 2 10/27/2007 28 6.00 28.27 74,500 2,630 Cone/Split 1 3 10/27/2007 28 6.00 28.27 117,920 4,170 Cone/Split Average 3,400 ,. 4 11/24/2007 56 ,. Does not comply with specified strength Started: 06:15am Finished: 09:00am Technician: Jason Shipe Report Distribution: Ori9: Duke Construction, LP (Dallas, TX) Alln: Mr. Paul Byrne (1-ec copy) 1-cc Poller Concrete Alln: Mr. Ryan Skelly 1-cc City of Coppell Alln: Mr. Lee Stone 1-cc City of Coppell Alln: Mr. Larry Davis Rone Engineering P-~ ~ K. Scott Watson, AET Project Manager LIMITATIONS The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (lB/ED) Page 1 of 1 Rone En~~ Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 302957 Project No.: 0711530 Date of Service: 10/25/2007 Report Date: 10/31/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 5,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 9385PW Placement Date: 10/25/2007 Weather Conditions: Sunny, windy Time Sampled: 10:15am Batch time: 09:43am Temperature - Air: 560F Concrete: 650F Truck No: 131 Ticket No: 8140 Air Content: 2.5% Unit Weight (pet): NA Overall Placement Location: Level 3, panels SP49 and SP50 Measured Slump (inches) 5.5 Sample Location: Same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested ( days) (in) (in2) (Ibs) (psi) Type 1 1 10/26/2007 1 6.00 28.27 64,550 2,280 Cone/Split 1 2 10/27/2007 2 6.00 28.27 96,010 ~ Cone/Split 1 3 11/22/2007 28 1 4 11/22/2007 28 1 5 12/20/2007 56 Technician: Alejandro Avendano Started: 09:30am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc Potter Concrete Attn: Mr. Ryan Skelly 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Finished: 1 0:30am Rone Engineering p~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (OM/ED) Page 1 of 1 Rone En~== Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 303274 Project No.: 0711530 Date of Service: 10/27/2007 Report Date: 10/31/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 5,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 9385 Placement Date: 10/27/2007 Weather Conditions: Sunny Time Sampled: 08:45am Temperature - Air: 530F Truck No: 125 Air Content: 2.2% Overall Placement Location: Panel #68 Measured Slump (inches) 6.5 Batch time: 08:12am Concrete: 730F Ticket No: 8319 Unit Weight (pet): NA Sample Location: Same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in") (Ibs) (psi) Type 1 1 10/30/2007 3 6.00 28.27 106,310 3,760 Cone/Split 1 2 10/30/2007 3 6.00 28.27 102,560 3,630 Cone/Split Average 3,690 1 3 11/03/2007 7 1 4 11/24/2007 28 1 5 11/24/2007 28 1 6 12/22/2007 56 Started: 08:00am Finished: 09:45am Technician: Alejandro Avendano Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc Potter Concrete Attn: Mr. Ryan Skelly 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Rone Engineering p~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CHfED) Page 1 of 1 Rone En~== Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 303109 Project No.: 0711530 Date of Service: 10/26/2007 Report Date: 10/31/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 9385 Placement Date: 10/26/2007 Weather Conditions: Sunny Time Sampled: 09:30am Temperature - Air: 580F Truck No: 118 Air Content: NA Overall Placement Location: Spandle panels SP41 , SP42, SP90, SP91 Measured Slump (inches) 4.75 Batch time: 09: 13am Concrete: 740F Ticket No: 8221 Unit Weight (pet): NA Sample Location: Panels SP41, SP42 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 10/27/2007 1 6.00 28.27 71,930 2,540 Cone/Split 1 2 10/28/2007 2 6.00 28.27 100,550 b Cone/Split 1 3 11/02/2007 7 1 4 11/23/2007 28 1 5 11/23/2007 28 1 6 12/21/2007 56 Started: 09:30am Finished: 10:30am Technician: Bruce Eberts Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc Potter Concrete Attn: Mr. Ryan Skelly 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Rone Engineering p~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/ED) Page 1 of 1