Loading...
Duke Lesley 3C-LR071024 Rone Eni~ Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 299720 Project No.: 0711530 Date of Service: 09/24/2007 Report Date: 10/24/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 5" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 7752 PW Placement Date: 09/24/2007 Weather Conditions: Sunny Time Sampled: 09:45am Temperature - Air: 800F Truck No: 131 Air Content: NA Overall Placement Location: 170' west, 50' south from northeast paving corner Measured Slump (inches) 5.0 Batch time: 09:32am Concrete: 830F Ticket No: 7638 Unit Weight (pet): NA Sample Location: 50' south, 170' west from northeast parking lot corner REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 10/01/2007 7 6.00 28.27 86,500 3,060 Cone/Split 1 2 10/22/2007 28 6.00 28.27 118,380 4,190 Cone/Split 1 3 10/22/2007 28 6.00 28.27 120,690 4,270 Cone/Split Average 4,230 1 4 11/19/2007 56 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/ED) Page 1 of 2 Rone En2~ Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 . Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrlch, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 299720 Project No.: 0711530 Date of Service: 09/24/2007 Report Date: 10/24/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 5" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 7752 PW Placement Date: 09/24/2007 Weather Conditions: Partly Cloudy Time Sampled: 12:00pm Batch time: 11 :43am Temperature - Air: 900F Concrete: 950F Truck No: 130 Ticket No: 7652 Air Content: NA Unit Weight (pet): NA Overall Placement Location: 170' west, 50' south from northeast paving corner Measured Slump (inches) 5.0 Sample Location: 190' east, 45' north from northeast building corner REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 2 1 10/01/2007 7 6.00 28.27 90,870 3,210 Cone/Split 2 2 10/22/2007 28 6.00 28.27 126,760 4,480 Cone/Split 2 3 10/22/2007 28 6.00 28.27 125,470 4,440 Cone/Split Average 4,460 2 4 11/19/2007 56 Technician: Jason Shipe Started: 06:15am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Altn: Mr. Paul Byrne (1-ec copy) 1-cc Potter Concrete Altn: Mr. Ryan Skelly 1-cc City of Coppell Altn: Mr. Lee Stone 1-cc City of Coppell Altn: Mr. Larry Davis Finished: 01 :30pm Rone Engineering P-~ J K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/ED) Page 2 of 2