Duke Lesley 3C-LR071019
Rone En~==
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Reinforcing Steel Inspection
Report No.: 301940
Project No.: 0711530
Date of Service: 10/12/2007
Report Date: 10/19/2007
Project: Point West Office I
Services: Reinforcing Steel Inspection
Report of Inspection
Locations and Items Inspected:
Tilt wall panels from P27 to P40
Item s Inspected' Co nfo rm ing Non Item s Inspected: Co nfo rm ing Non Item sins pected: Co nfo rm ing Non
Co nfo rm ing Conforming Co nfo rm ing
P lacing Drawings Bar Length Column Ties Properly
Approved x and Shape x Tied and Spaced NA
B sr Size x Pro per B sr P laeem ant x Stirrup Spacing x
Bar Grade x P roperly Tied x Stirrup Type x
8 ars Clean x Dowel Bars in Place NA Lapped Splices x
Form Clean x P roper Bar Suppo rts x Corner Bars x
N um ber of Bars x ProperCover x Mechanical Splices NA
Discrepancies / Comments:
1. Remove loose debris from placement area.
Discrepancies noted above were corrected prior to concrete placement.
Technician: Jose Villanueva Started: 02:30am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Altn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Finished: 04:00am
Rone Engineering
p~~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/KW) Page 1 of 1
Rone Eni==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 301801
Project No.: 0711530
Date of Service: 10/11/2007
Report Date: 10/19/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 1
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design I.D.: 9750 PW
Placement Date: 10/11/2007
Weather Conditions: Clear
Time Sampled: 07:45am
Temperature - Air: 630F
Truck No: 139
Air Content: NA
Overall Placement Location:
Panels from P3-P17, P75-P89
Batch time: 07:08am
Concrete: 830F
Ticket No: 14673
Unit Weight (pet): NA
Measured
Slump
(inches)
6.25
Sample Location:
P.3
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
1 1 10/15/2007 4 6.00 28.27 99,280 3,510 Shear
1 2 10/15/2007 4 6.00 28.27 95,550 3,380 Cone/Split
Average 3,450
1 3 10/18/2007 7 6.00 28.27 113,710 4,020 Cone/Split
1 4 11/08/2007 28
1 5 11/08/2007 28
1 6 12/06/2007 56
Remarks: Water added at site: 15 gallons Results to superintendent
LIMIT A nONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 5
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 301801
Project No.: 0711530
Date of Service: 10/11/2007
Report Date: 10/19/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 1
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design 1.0.: 9750 PW
Placement Date: 10/11/2007
Weather Conditions: Clear
Time Sampled: 09:15am
Temperature - Air: 750F
Truck No: 102
Air Content: NA
Overall Placement Location:
Panels from P3-P17, P75-P89
Measured
Slump
(inches)
5.5
Batch time: 08:39am
Concrete: 890F
Ticket No: 14685
Unit Weight (pet): NA
Sample Location:
P.10
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
2 1 10/15/2007 4 6.00 28.27 108,950 3,850 Cone/Split
2 2 10/15/2007 4 6.00 28.27 108,180 3,830 Shear
Average 3,840
2 3 10/18/2007 7 6.00 28.27 111,250 3,930 Shear
2 4 11/08/2007 28
2 5 11/08/2007 28
2 6 12/06/2007 56
Remarks: Water added at site: 10 gallons Results to superintendent
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 2 of 5
Rone En~==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 301801
Project No.: 0711530
Date of Service: 10/11/2007
Report Date: 10/19/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 1
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design 1.0.: 9750 PW
Placement Date: 10/11/2007
Weather Conditions: Clear
Time Sampled: 11: 15am
Temperature - Air: 840F
Truck No: 107
Air Content: NA
Overall Placement Location:
Panels from P3-P17, P7S-PS9
Measured
Slump
(inches)
5.0
Batch time: 1 0:44am
Concrete: 890F
Ticket No: 14699
Unit Weight (pet): NA
Sample Location:
P.7S
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
3 1 10/15/2007 4 6.00 28.27 98,850 3,500 Cone/Split
3 2 10/15/2007 4 6.00 28.27 104,090 3,680 Cone/Split
Average 3,590
3 3 10/18/2007 7 6.00 28.27 115,930 4,100 Cone/Split
3 4 11/08/2007 28
3 5 11/08/2007 28
3 6 12/06/2007 56
Remarks: Water added at site: 5 gallons Results to superintendent
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 3 of 5
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
n01 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 301801
Project No.: 0711530
Date of Service: 10/11/2007
Report Date: 10/19/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 1
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design 1.0.: 9750 PW
Placement Date: 10/11/2007
Weather Conditions: Clear
Time Sampled: 12:30pm
Temperature - Air: 890F
Truck No: 125
Air Content: NA
Overall Placement Location:
Panels from P3-P17, P75-P89
Measured
Slump
(inches)
4.75
Batch time: 12:11pm
Concrete: 910F
Ticket No: 14713
Unit Weight (pet): NA
Sample Location:
P.81
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
4 1 10/15/2007 4 6.00 28.27 102,640 3,630 Shear
4 2 10/15/2007 4 6.00 28.27 102,530 3,630 Cone/Split
Average 3,630
4 3 10/18/2007 7 6.00 28.27 117,390 4,150 Shear
4 4 11/08/2007 28
4 5 11/08/2007 28
4 6 12/06/2007 56
Remarks: Water added at site: 10 gallons Results to superintendent
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 4 of 5
Rone En~==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 301801
Project No.: 0711530
Date of Service: 10/11/2007
Report Date: 10/19/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 1
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design I.D.: 9750 PW
Placement Date: 10/11/2007
Weather Conditions: Clear
Time Sampled: 01 :30pm
Temperature - Air: 890F
Truck No: 139
Air Content: NA
Overall Placement Location:
Panels from P3-P17, P75-P89
Measured
Slump
(inches)
5.25
Batch time: 01 :04pm
Concrete: 910F
Ticket No: 14722
Unit Weight (pct): NA
Sample Location:
P.87
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
5 1 10/15/2007 4 6.00 28.27 97,770 3,460 Cone/Split
5 2 10/15/2007 4 6.00 28.27 94,770 3,350 Cone/Split
Average 3,400
5 3 10/18/2007 7 6.00 28.27 103,550 3,660 Cone/Split
5 4 11/08/2007 28
5 5 11/08/2007 28
5 6 12/06/2007 56
Remarks: Water added at site: 5 gallons Results to superintendent
Started: 06:45am Finished: 03:00pm
Technician: Jose Villanueva
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc Potter Concrete Attn: Mr. Ryan Skelly
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Rone Engineering
V~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 5 of 5
Rone Eni~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 301941
Project No.: 0711530
Date of Service: 10/12/2007
Report Date: 10/19/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design 1.0.: 9750 PW
Placement Date: 10/12/2007
Weather Conditions: Clear
Time Sampled: 04:30am
Temperature - Air: 670F
Truck No: 136
Air Content: NA
Overall Placement Location:
Panel walls from P27 to P40
Measured
Slump
(inches)
5.0
Batch time: 04:06am
Concrete: 850F
Ticket No: 7911
Unit Weight (pet): NA
Sample Location:
From P.28
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 10/16/2007 4 6.00 28.27 106,680 3,770 Cone/Split
1 2 10/16/2007 4 6.00 28.27 107,570 3,800 Cone/Split
Average 3,790
1 3 10/19/2007 7 6.00 28.27 113,190 4,000 Cone/Shear
1 4 11/09/2007 28
1 5 11/09/2007 28
1 6 12/07/2007 56
Remarks: Water added at site: 5 gallons
Results to superintendent
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(DMfTM) Page 1 of 2
Rone Eni~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7101 W Little York, Ste 600, Houston, TX 71040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 301941
Project No.: 0711530
Date of Service: 10/12/2007
Report Date: 10/19/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9750 PW
Placement Date: 10/12/2007
Weather Conditions: Clear
Time Sampled: 05:30am
Temperature - Air: 640F
Truck No: 134
Air Content: NA
Overall Placement Location:
Panel walls from P27 to P40
Batch time: 05:04am
Concrete: 780F
Ticket No: 7920'
Unit Weight (pet): NA
Measured
Slump
(inches)
5.75
Sample Location:
From P.35
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (inZ) (Ibs) (psi) Type
2 1 10/16/2007 4 6.00 28.27 109,650 3,880 Cone/Split
2 2 10/16/2007 4 6.00 28.27 107,190 3,790 Cone/Split
Average 3,830
2 3 10/19/2007 7 6.00 28.27 118,860 4,200 Cone/Shear
2 4 11/09/2007 28
2 5 11/09/2007 28
2 6 12/07/2007 56
Remarks: Water added at site: 5 gallons
Results to superintendent
Technician: Jose Villanueva Started: 04:00am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc Potter Concrete Attn: Mr. Ryan Skelly
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Finished: 07:45am
Rone Engineering
p~
;::>
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, ltd.
(DMITM) Page 2 of 2
Rone En2=::i
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Reinforcing Steel Re-Inspection
Report No.: 301800
Project No.: 0711530
Date of Service: 10/11/2007
Report Date: 10/19/2007
Project: Point West Office I
Services: Reinforcing Steel Re-Inspection
Report of Re-Inspection
Locations and Items Inspected:
Tilt wall panels, P3-P6, P8-P17, P75-P89
Item sins pected: Co nfo rm ing Non Item s Inspected' Conform ing Non Item s Inspecled: Conforming Non
Conforming Co nfo rm ing Co nfo rm ing
Placing Drawings Bar Length Coiumn Ties Properly
Appro ved x and Shape x Tied and Spaced NA
BarSize x Pro per B ar P lacem ant x Stirrup Spacing x
Bar Grade x Pro perly Tied x Slirrup Type x
Bars Clean x Dowel Bars in Place x Lapped Splices x
Form Clean x P roper Bar Supports x Corner Bars NA
NumberofBers x ProperCover x Mechanical Splices NA
Discrepancies I Comments: Discrepancies noted on previous report have been corrected and cleared to compliant
status.
Technician: Jose Villanueva Started: 05:30am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Alln: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Alln: Mr. Lee Stone
1-cc City of Coppell Alln: Mr. Larry Davis
Finished: 06:45am Rone Engineering
p~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd.
(TM/KW) Page 1 of 1
Rone En~~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299178
Project No.: 0711530
Date of Service: 09/19/2007
Report Date: 10/19/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 5" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1 064
ASTM C-138
ASTM C-39
Mix Design I.D.: 7752 PW
Placement Date: 09/19/2007
Weather Conditions: Cloudy
Time Sampled: 03:10am
Temperature - Air: 760F
Truck No: 110
Air Content: NA
Overall Placement Location:
Beltline Road I Highway 635
Measured
Slump
(inches)
5.0
Batch time: 03:03am
Concrete: 800F
Ticket No: 7420
Unit Weight (pcf): NA
Sample Location:
South section-southeast corner, section 1
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 09/26/2007 7 6.00 28.27 74,520 2,640 Cone/Split
1 2 10/17/2007 28 6.00 28.27 102,440 3,620 Cone/Split
1 3 10/17/2007 28 6.00 28.27 101,490 3,590 Cone/Split
Average 3,610 ..
1 4 11/14/2007 56
.. Does not comply with specified strength
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 8
Rone Eni==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299178
Project No.: 0711530
Date of Service: 09/19/2007
Report Date: 10/19/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 5" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design I.D.: 7752 PW
Placement Date: 09/19/2007
Weather Conditions: Cloudy
Time Sampled: 04:00am
Temperature - Air: 760F
Truck No: 138
Air Content: NA
Overall Placement Location:
Beltline Road I Highway 635
Measured
Slump
(inches)
5.0
Batch time: 03:42am
Concrete: 800F
Ticket No: 7425
Unit Weight (pet): NA
Sample Location:
South section-center, section 1
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
2 1 09/26/2007 7 6.00 28.27 73,690 2,610 Cone/Split
2 2 10/17/2007 28 6.00 28.27 98,240 3,470 Shear
2 3 10/17/2007 28 6.00 28.27 103,900 3,670 Cone/Split
Average 3,570 *
2 4 11/14/2007 56
* Does not comply with specified strength
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 2 of 8
Rone Eni~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299178
Project No.: 0711530
Date of Service: 09/19/2007
Report Date: 10/19/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 5" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design I.D.: 7752 PW
Placement Date: 09/19/2007
Weather Conditions: Cloudy
Time Sampled: 05:00am
Temperature - Air: 760F
Truck No: 109
Air Content: NA
Overall Placement Location:
Beltline Road I Highway 635
Measured
Slump
(inches)
5.0
Batch time: 04:51am
Concrete: 800F
Ticket No: 7437
Unit Weight (pet): NA
Sample Location:
South section-southwest corner, section 2
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
3 1 09/26/2007 7 6.00 28.27 76,190 2,690 Cone/Split
3 2 10/17/2007 28 6.00 28.27 125,210 4,430 Cone/Split
3 3 10/17/2007 28 6.00 28.27 122,390 4,330 Cone/Split
Average 4,380
3 4 11/14/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd.
(CH/KW) Page 3 of 8
Rone En2==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299178
Project No.: 0711530
Date of Service: 09/19/2007
Report Date: 10/19/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 5" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design I.D.: 7752 PW
Placement Date: 09/19/2007
Weather Conditions: Cloudy
Time Sampled: 06:15am
Temperature - Air: 780F
Truck No: 109
Air Content: NA
Overall Placement Location:
Beltline Road I Highway 635
Measured
Slump
(inches)
5.0
Batch time: 06:05am
Concrete: 820F
Ticket No: 7447
Unit Weight (pet): NA
Sample Location:
South section-southeast corner, section 2
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
4 1 09/26/2007 7 6.00 28.27 95,000 3,360 Cone/Split
4 2 10/17/2007 28 6.00 28.27 125,220 4,430 Cone/Split
4 3 10/17/2007 28 6.00 28.27 119,570 4,230 Cone/Split
Average 4,330
4 4 11/14/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 4 of 8
Rone Eni~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299178
Project No.: 0711530
Date of Service: 09/19/2007
Report Date: 10/19/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in,): 5" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design I.D.: 7752 PW
Placement Date: 09/19/2007
Weather Conditions: Cloudy
Time Sampled: 08:00am
Temperature - Air: 780F
Truck No: 110
Air Content: NA
Overall Placement Location:
Beltline Road I Highway 635
Measured
Slump
(inches)
5.0
Batch time: 07:51 am
Concrete: 830F
Ticket No: 7457
Unit Weight (pet): NA
Sample Location:
Center section-center, 3rd section
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
5 1 09/26/2007 7 6.00 28.27 103,560 3,660 Cone/Split
5 2 10/17/2007 28 6.00 28.27 143,120 5,060 Cone/Split
5 3 10/17/2007 28 6.00 28.27 140,080 4,950 Cone/Split
Average 5,010
5 4 11/14/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CHIKW) Page 5 of 8
Rone En~==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299178
Project No.: 0711530
Date of Service: 09/19/2007
Report Date: 10/19/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 5" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 7752 PW
Placement Date: 09/19/2007
Weather Conditions: Cloudy
Time Sampled: 09:05am
Temperature - Air: 820F
Truck No: 140
Air Content: NA
Overall Placement Location:
Beltline Road I Highway 635
Batch time: 08:58am
Concrete: 850F
Ticket No: 7468
Unit Weight (pet): NA
Measured
Slump
(inches)
5.0
Sample Location:
Center section-north, northwest corner
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in") (Ibs) (psi) Type
6 1 09/26/2007 7 6.00 28.27 106,800 3,780 Cone/Split
6 2 10/17/2007 28 6.00 28.27 139,770 4,940 Cone/Split
6 3 10/17/2007 28 6.00 28.27 143,450 5,070 Cone/Split
Average 5,010
6 4 11/14/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 6 of 8
Rone En~==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299178
Project No.: 0711530
Date of Service: 09/19/2007
Report Date: 10/19/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations. perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 5" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1 064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 7752 PW
Placement Date: 09/19/2007
Weather Conditions: Cloudy
Time Sampled: 10:27am
Temperature - Air: 860F
Truck No: NA
Air Content: NA
Overall Placement Location:
Beltline Road I Highway 635
Batch time: 09:51am
Concrete: 910F
Ticket No: 59014101
Unit Weight (pcf): NA
Measured
Slump
(inches)
5.0
Sample Location:
North section-northeast corner
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
7 1 09/26/2007 7 6.00 28.27 73,980 2,620 Cone/Split
7 2 10/17/2007 28 6.00 28.27 100,090 3,540 Cone/Split
7 3 10/17/2007 28 6.00 28.27 97,510 3,450 Cone/Split
Average 3,490 *
7 4 11/14/2007 56
* Does not comply with specified strength
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 7 of 8
Rone Eni==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299178
Project No.: 0711530
Date of Service: 09/19/2007
Report Date: 10/19/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 5" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design I.D.: 7752 PW
Placement Date: 09/19/2007
Weather Conditions: Cloudy
Time Sampled: 11 :21am
Temperature - Air: 900F
Truck No: 140
Air Content: NA
Overall Placement Location:
Beltline Road I Highway 635
Measured
Slump
(inches)
5.0
Batch time: 11: 14am
Concrete: 950F
Ticket No: 7473
Unit Weight (pcf): NA
Sample Location:
North section-northwest corner
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (inZ) (Ibs) (psi) Type
8 1 09/26/2007 7 6.00 28.27 73,320 2,590 Cone/Split
8 2 10/17/2007 28 6.00 28.27 98,120 3,470 Cone/Split
8 3 10/17/2007 28 6.00 28.27 99,970 3,540 Cone/Split
Average 3,500 ..
8 4 11/14/2007 56
.. Does not comply with specified strength
Started: 02:30am Finished: 01 :OOpm
Technician: Jason Shipe
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Alln: Mr. Paul Byrne
(1-ec copy)
1-cc Potter Concrete Alln: Mr. Ryan Skelly
1-cc City of Coppell Alln: Mr. Lee Stone
1-cc City of Coppell Alln: Mr. Larry Davis
Rone Engineering
p~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 8 ofB