Loading...
Duke Lesley 3C-LR071017 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 298904 Project No.: 0711530 Date of Service: 09/17/2007 Report Date: 10/17/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" - 7" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 7751 PW Placement Date: 09/17/2007 Weather Conditions: Sunny Time Sampled: 10:20am Temperature - Air: 860F Truck No: 134 Air Content: NA Overall Placement Location: Point West One, F.8/01 Pier Measured Slump (inches) 6.0 Batch time: 09:33am Concrete: 820F Ticket No: 7401 Unit Weight (pet): NA Sample Location: Pier F.8/01 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 1 1 09/24/2007 7 6.00 28.27 97,590 3,450 Cone/Split 1 2 10/15/2007 28 6.00 28.27 131,540 4,650 Cone/Split 1 3 10/15/2007 28 6.00 28.27 131,910 4,670 Cone/Split Average 4,660 1 4 11/12/2007 56 Technician: Denny Harris Rone Engineering See Report 298872 for technician time~ ~ Report Distribution:. . ~ Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne . (1-ec copy) 1-cc P~tter Concrete Attn: Mr. Ryan Skelly K. Scott Watson, AET 1-cc City of Coppell Attn: Mr. Lee Stone Project Manager 1-cc City of Coppell Attn: Mr. Larry Davis ~ LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 298873 Project No.: 0711530 Date of Service: 09/17/2007 Report Date: 10/17/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 3,500 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7752 PW Placement Date: 09/17/2007 Weather Conditions: Sunny Time Sampled: 08:30am Temperature - Air: 840F Truck No: 134 Air Content: NA Overall Placement Location: East and west approach off Dividend Batch time: 07:51 am Concrete: 820F Ticket No: 7396 Unit Weight (pet): NA Measured Slump (inches) 6.0 Sample Location: East and west approach off Dividend REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 09/24/2007 7 6.00 28.27 85,950 3,040 Cone/Shear 1 2 10/15/2007 28 6.00 28.27 116,240 4,110 Cone/Split 1 3 10/15/2007 28 6.00 28.27 110,930 3,920 Cone/Split Average 4,020 4 11/12/2007 56 Technician: Denny Harris Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc Potter Concrete Attn: Mr. Ryan Skelly 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Rone Engineering p~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 1 of 1