Loading...
Duke Lesley 3C-LR071013 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Cylinder Collection Report No.: 301255 Project No.: 0711530 Date of Service: 10/06/2007 Report Date: 10/13/2007 Project: Point West Office I Services: Pick Up Compressive Strength Test Specimens Cast Prior To This Date Report of Collection On this date, a Rone Engineering Services, Ltd. representative arrived on site as scheduled to pick up compressive strength test specimens cast prior to this date. Technician: Jose Villanueva Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc Potter Concrete Attn: Mr. Ryan Skelly 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 02:00pm Finished: 03:15pm Rone Engineering p~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 1 of 1 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214)630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 301685 Project No.: 0711530 Date of Service: 10/10/2007 Report Date: 10/13/2007 Project: Point West Office I Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Tilt wall panels 3-6, 8-17, 75-89 Ilem s Inspected: Co nfo rm ing Non Items Inspected: Conforming Non Item s Ins peeled: Conforming Non Co nfo rm ing Conforming Co nfo rm ing Placing Drawings 8 ar Length Column Ties Pro perly Approved x and Shape x Tied and Spaced NA 8 ar Size x P ra per 8 ar P tacem ent x Slirrup Spacing NA 8 ar Grade x Properly Tied x Stirrup Type NA 8 ars Clean x Dowel Bars In Place x Lapped S pl,ices x Form Clean x ProperBarSupports x Corner Bars x Numberof 8ars x ProperCover x Mechanical Splices NA Discrepancies I Comments: 1. Recessed panel legs not installed on most panels (reinforcement). 2. Recessed panels that are installed are touching bottom form with reinforcement. 3. Recessed panel legs need seven #4's on bottom face and #3 ties every 6", 4. Need chairs at recessed panel leg. Technician: Dane Campbell Started: 02:00pm Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Finished: 03:45pm Rone Engineering p~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/LB) Page 1 of 1