Loading...
Duke Lesley 3C-LR071002 (2) Rone En~== 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214)630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 299974 Project No.: 0711530 Date of Service: 09/26/2007 Report Date: 10/02/2007 Project: Point West Office I Services: Straight Shaft Pier Inspection Report of Inspection D rille r: McKinney # 1 #3 #4 #5 Sou th e a s t # 2 Mid d Ie Northeast Southwest North we s t Pie rid e ntifica tio n corn e r East corn e r corn e r corner PierDiameter(in) 36 36 36 36 36 D e p th 0 f P ie r F ro m S u rfa c e (ft) 16.30 16.80 16.70 16.50 16.60 Deoth ofBearinll Stratum From S u rfa ce (ft) N/A N/A N/A N/A N/A Reauired Penetration (ft) N/A N/A N/A N/A N/A A ctua I P e ne tra tio n (ft)* 16.30 16.80 16.70 16.50 16.60 Condition of Bottom (wet I dry) Dry Dry Dry Dry D ry Plumb Within Tolerance (yes Ino) Yes Yes Yes Yes Yes Casinll Diameter(in)/Casino Lenoth (ft) N/A N IA N/A N/A N IA NumberofBars IReinforcino BarSize 8 1#6 8 1#6 8 1#6 8 1#6 8 1#6 Len g th 0 f Rei n fo rc i n II S te e I (ft) 16.00 14.40 14.00 14.40 14.60 Time Drilling was Completed (am Ipm) 7 :4 0 AM 8 :0 0 AM 8:15 AM 8:30 AM 8 :40 AM Time Concrete was Placed (am 10m) 2:15 PM 2 :0 0 P M 1 :38 PM 1:15 PM 1 :30 PM D e p th 0 f Pie r F ro m Top 0 f Con c re te (ft) 12.30 14.80 14.7 0 14.50 14.60 Elevation:Surface (ft)** 100.00 1 00.00 1 00.00 100.00 1 00.00 Elevation: Top of Pier (ft)** 96.00 98.00 98.00 98.00 98.00 Elevation: Bottom ofPier(ft)** 83.70 83.20 83.30 83.50 83.40 Elevation: Top of Bearing Stratum (ft.) ** N/A N/A N IA N/A N/A Tan/brown sandy clay, traces of red clay Bearing Stratum (description) P e netratio n not reauired - total minim um de p th 16' Note: See re port # 299975 fo reo m pre s s Ive S tre n g th T est S pee I men s. * Additional Penetration not requested unless noted. **E levation by others Remarks: Dumpster pad piers - In lieu of bell pier sloughing, straight shaft was done. Technician: Denny Harris Started: 06:15am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Finished: 02:45pm Rone Engineering Pad- ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/JB) Page 1 of 1 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 300203 Project No.: 0711530 Date of Service: 09/27/2007 Report Date: 10/02/2007 Project: Point West Office I Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Approach at southeast corner of job site from Beltline, west 15', approach at northeast corner of site from Beltline, west 60' Items Inspected: Conforming Non Items Inspected: Co nfo rm ing Non Item sins pected: Co nfo rm ing Non Co nfo nm ing Conforming Conform ing P lacing Drawings Bar Length Column Ties Pro perly Approved x and Shape x Tied and Spaced NA Bar Size x Pro per Bar P lacem ent x Stirrup Spacing NA Bar Grade x Pro perly Tied x Stirrup Type NA Bars Clean x Dowel Bars in Place x Lapped Splices x Form Clean x Pro per Bar Suppo rts x Corner Bars NA Numberof Bars x ProperCover x Mechanical Splices NA Discrepancies / Comments: No apparent discrepancies were noted at the locations listed above. Technician: Chris Harbour Started: 05:00pm Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Finished: 06:30pm Rone Engineering p~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlLB) Page 1 of 1