Loading...
Duke Lesley-LR071031 Rone Eni== Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 302613 Project No.: 0612510 Date of Service: 10/20/2007 Report Date: 10/31/2007 Project: ~ sley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Concrete Supplier: LMC Plant: 7 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 6" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 9139 Placement Date: 10/20/2007 Weather Conditions: Clear, calm Time Sampled: 12:00pm Batch time: Temperature - Air: 770F Concrete: 820F Truck No: 7024 Ticket No: 7183848 Air Content: 4.4% Unit Weight (pet): NA Overall Placement Location: Paving replacement, intersection of Dividend Drive and Beltline Road Measured Slump (inches) 6.5 Sample Location: Intersection of Dividend Drive and Beltline Rd., 3' east from west curb, southbound Beltline Road, 8' north from curb on eastbound Dividend Drive REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 1 1 10/21/2007 1 6.00 28.27 127,670 4,520 Shear 1 2 10/21/2007 1 6.00 28.27 129,340 4,570 Shear Average 4,540 3 10/27/2007 7 6.00 28.27 190,470 6,740 Cone/Split 1 4 11/17/2007 28 1 5 11/17/2007 28 6 12/15/2007 56 Technician: Pat Parks Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Alln: Mr. Alex Bennell PE (1-ec copy) 1-ec Lacy Construction Alln: Mr. Kevin Briles 1-cc City of Coppell Alln: Mr. Lee Stone 1-cc City of Coppell Alln: Mr. Larry Davis Started: 11 :OOam Finished: 01 :30pm Rone Engineering p~~ K. Scott Watson, AET Project Manager LIMITATIONS The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (DM/ED) Page 1 of 1 Rone En~~ 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 303338 Project No.: 0612510 Date of Service: 10/29/2007 Report Date: 10/31/2007 Project: Lesley Infrastructure Services: Perform In-Place Density Testing PROJECT DATA Contractor: Test Method: ASTM D-6938 Gauge: Troxler 3430 Gauge Serial No: 35518 Test Mode: DT Standard Counts Moisture Density Current: 746 Current: 2537 Previous: 741 Previous: 2566 MOISTURE DENSITY RELATIONS MID No. 294619 Description Lime Treated Brown I Silty Sandy Clay Moisture % Maximum Density (pet) 87.0 Project Requirements Moisture Density Optimum +4 95 min 32.7 Test No Test Location Paving subgrade Point West, Station 14+50 FIELD DENSITY TESTS Probe MID Depth No. Moisture % Wet Density Dry Density Density (pet) (pet) (% max) 6" 294619 35.0 112.6 83.4 96 Technician: Joe Jemigan Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-ec Lacy Construction Attn: Mr. Kevin Briles 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 07:15am Finished: 09:00am Rone Engineering p~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specifIC samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CHfED) Page 1 of 1