Loading...
Duke Lesley-LR071024 Rone Eni~ 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 302612 Project No.: 0612510 Date of Service: 10/20/2007 Report Date: 10/24/2007 Project: Lesley Infrastructure Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Paving replacement at intersection of Beltline Road and Dividend Drive Item s Inspected: Co "fo rm ing Non Items Inspected: Co nfo rm ing Non Item s Ins peeled: Co nfa rm ing Non Conforming Co nfa rm ing Co nfa rm ing P lac 109 0 rawings Bar Length Column Ties Properly Appro ved x and Shape x Tied and Spaced NA Bar Size x Proper Bar Placement x Stirrup Spacing NA B sr Grade x Pro perly Tied x Stirrup Type NA Bars Clean x Dowel Bars in Place x Lapped Splices x Form Clean x PraperBarSupparls x CornerBars NA Numberof Bars x PraperCaver x Mechanical Splices NA Discrepancies I Comments: No apparent discrepancies were noted in the locations listed above. Technician: Pat Parks Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 10:00am Finished: 11 :OOam Rone Engineering p~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlKW) Page 1 of 1