Duke Lesley-LR071024
Rone Eni~
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Reinforcing Steel Inspection
Report No.: 302612
Project No.: 0612510
Date of Service: 10/20/2007
Report Date: 10/24/2007
Project: Lesley Infrastructure
Services: Reinforcing Steel Inspection
Report of Inspection
Locations and Items Inspected:
Paving replacement at intersection of Beltline Road and Dividend Drive
Item s Inspected: Co "fo rm ing Non Items Inspected: Co nfo rm ing Non Item s Ins peeled: Co nfa rm ing Non
Conforming Co nfa rm ing Co nfa rm ing
P lac 109 0 rawings Bar Length Column Ties Properly
Appro ved x and Shape x Tied and Spaced NA
Bar Size x Proper Bar Placement x Stirrup Spacing NA
B sr Grade x Pro perly Tied x Stirrup Type NA
Bars Clean x Dowel Bars in Place x Lapped Splices x
Form Clean x PraperBarSupparls x CornerBars NA
Numberof Bars x PraperCaver x Mechanical Splices NA
Discrepancies I Comments: No apparent discrepancies were noted in the locations listed above.
Technician: Pat Parks
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Attn: Mr. Alex Bennett PE (1-ec copy)
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Started: 10:00am
Finished: 11 :OOam
Rone Engineering
p~~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMlKW) Page 1 of 1