Loading...
Duke Lesley-LR071017 Rone En~~ Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freldrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 301359 Project No.: 0612510 Date of Service: 10/08/2007 Report Date: 10/17/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: TXI Plant: NA Specification Requirements Strength: 3,500 psi @ 28 days Slump (in.): 4" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Measured Slump (inches) 4.0 Mix Design 1.0.: 68274 Placement Date: 10/08/2007 Weather Conditions: Partly cloudy, calm Time Sampled: 11:15am Batch time: 10:29am Temperature - Air: 810F Concrete: 880F Truck No: 1062 Ticket No: 547559 Air Content: 3.4% Unit Weight (pet): NA Overall Placement Location: Paving, center median/island on Dividend Dr., 5th island, west of southbound Beltline Rd., 8' west from (cont) Sample Location: Same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 106,810 Cylinder Marked Date Set No. Tested 1 1 10/15/2007 1 2 11/05/2007 1 3 11/05/2007 4 12/03/2007 Age (days) 7 Diameter (in) 6.00 28 28 56 Area (in2) 28.27 Compressive Strength (psi) 3,780 Fracture Type Shear Remarks: Cont east end of median island (stamped concrete) Water added at site: 10 gallons Started: 09:30am Finished: 12:15pm Rone Engineering p~~ Technician: Pat Parks Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Alln: Mr. Alex Bennell PE (1-ec copy) 1-ec Lacy Construction Alln: Mr. Kevin Briles 1-cc City of Coppell Alln: Mr. Lee Stone 1-cc City of Coppell Alln: Mr. Larry Davis K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 1 of 1