Loading...
Duke Lesley-LR071015 (2) Rone Eni== Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 301162 Project No.: 0612510 Date of Service: 10/05/2007 Report Date: 10/15/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: TXI Plant: 141 Specification Requirements Strength: 3,500 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: B 8274 Placement Date: 10/05/2007 Weather Conditions: Partly cloudy, calm Time Sampled: 11 :OOam Batch time: 01 :34am Temperature - Air: 870F Concrete: 890F Truck No: 7064 Ticket No: 546539 Air Content: 3.5% Un'it Weight (pcf): NA Overall Placement Location: Paving, stamped concrete on Dividend Dr., 4th island, center median, west of Bellline Rd. Measured Slump (inches) 4.5 Sample Location: Center median, 4th island, west of Bellline Rd. and Dividend Dr. intersection, 10' east from west end of island REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 114,190 Cylinder Marked Date Set No. Tested 1 1 10/12/2007 1 2 11/02/2007 1 3 11/02/2007 4 11/30/2007 Age (days) 7 Diameter (in) 6.00 28 28 56 Technician: Pat Parks Report Distribution: Ori9: Duke Construction, LP (Dallas, TX) AUn: Mr. Alex BenneU PE (1-ec copy) 1-ec Lacy Construction AUn: Mr. Kevin Briles 1-cc City of Coppell AUn: Mr. Lee Stone 1-cc City of Coppell AUn: Mr. Larry Davis Compressive Strength (psi) 4,040 Fracture Type Cone/Split Area (in') 28.27 Started: 09:45am Finished: 12:15pm Rone Engineering ~~~ K. Scott Watson, AET Project Manager L1MITA nONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KWIKW) Page 1 of 1 Rone Engineering .. Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 301017 Project No.: 0612510 Date of Service: 10/04/2007 Report Date: 10/15/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: TXI Plant: 131 Specification Requirements Strength: 3,500 psi @ 28 days Slump (in.): 4" - 6" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Batch time: 10: 15am Concrete: 960F Ticket No: 545338 Unit Weight (pet): NA Measured Slump (inches) 6.0 Mix Design 1.0.: 88274 Placement Date: 10/04/2007 Weather Conditions: Clear Time Sampled: 11: 1 Dam Temperature - Air: 790F Truck No: 7014 Air Content: NA Overall Placement Location: Stamped concrete median, Dividend Dr., Stations 34-32.75 and 30.50-29.20 Sample Location: Station 33.50 REPORT OF TESTS Cylinder Marked Date Set No. Tested 1 1 10/11/2007 1 2 11/01/2007 1 3 11/01/2007 1 4 11/29/2007 ~. V 28 28 Technician: Clayton Snyder Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-ec Lacy Construction Attn: Mr. Kevin Briles 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 100,680 Diameter (in) 6.00 Compressive Strength (psi) 3,560 Fracture Type ~Iit Area (in') 28.27 K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd. (TM/LB) Page 1 of 1 Rone Engineering .. 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Concrete Compressive Strength Test Report No.: 300868 Project No.: 0612510 Date of Service: 10/03/2007 Report Date: 10/15/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: TXI Plant: 131 Specification Requirements Strength: Slump (in.): Air (%): Test Method: NA NA ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 88274 Placement Date: 10/03/2007 Weather Conditions: Rainy Time Sampled: 10:30am Temperature - Air: 780F Truck No: 7005 Air Content: 3.9% Overall Placement Location: Paving for stamp - 250' west, 5' north, 5th colored concrete stamp from turn-in to Leslie intrastructure from Beltline Road Batch time: 09:28am Concrete: 850F Ticket No: 544410 Unit Weight (pet): NA Measured Slump (inches) 4.25 Sample Location: 5' west, l' north from southeast corner REPORT OF TESTS Cylinder Marked Date Set No. Tested 1 1 10/10/2007 2 10/31/2007 3 10/31/2007 1 4 11/28/2007 Age (days) 7 Diameter (in) 6.00 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 119,050 Area (in') 28.27 Compressive Strength (psi) 4,210 Fracture Type Cone/Split 28 28 56 Remarks: Water added at site: 5 gallons Technician: Ryan Rawlinson Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-ec Lacy Construction Attn: Mr. Kevin Briles 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 09:30am Finished: 11 :30am Rone Engineering p~ -::::> K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 301081 Project No.: 0612510 Date of Service: 10/04/2007 Report Date: 10/15/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perfonrn required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: LMC Plant: 3 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 1701 Placement Date: 10/04/2007 Weather Conditions: Sunny Time Sampled: 04:45pm Temperature - Air: 920F Truck No: 975 Air Content: 3.5% Overall Placement Location: Northwest headwall footing at Leslie intrastructure Measured Slump (inches) 4.5 Batch time: 03: 16pm Concrete: 960F Ticket No: 3238193 Unit Weight (pet): NA Sample Location: Same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 10/11/2007 7 6.00 28.27 108,880 3,850 Cone/Split 1 2 11/01/2007 28 1 3 11/01/2007 28 4 11/29/2007 56 Technician: Montreal Bailey Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-ec Lacy Construction Attn: Mr. Kevin Briles 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 03:30pm Finished: 06:00pm Rone Engineering ~~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd. (CHILB) Page 1 of 1 Rone Engineering " Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 301448 Project No.: 0612510 Date of Service: 10/06/2007 Report Date: 10/15/2007 Project: Lesley Infrastructure Services: Test compressive strength test specimens prepared by others and picked up at the jobsite. PROJECT DATA Contractor: Concrete Supplier: LMC Plant: 7 Specification Requirements Strength: 4,200 psi @ 28 days Slump (in.): 2" - 4" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 1851 Placement Date: 10/06/2007 Weather Conditions: Sunny, partly cloudy Time Sampled: 01:50pm Batch time: 12:02pm Temperature - Air: 900F Concrete: 960F Truck No: 7183344 Ticket No: 1080 Air Content: 4.0% Unit Weight (pet): NA Overall Placement Location: Manhole at Point West 6 Measured Slump (inches) 3.0 Sample Location: Station 26+65.04 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 1 1 10/13/2007 7 6.00 28.27 145,430 5,140 Cone/Split 1 2 11/03/2007 28 1 3 11/03/2007 28 1 4 12/01/2007 56 Technician: Montreal Bailey Report Distribution: Orig: Duke Construction, LP (Dallas. TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-ec Lacy Construction Attn: Mr. Kevin Briles 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 01:45pm Finished: 03:00pm Rone Engineering ~~ ;:::> K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (DMIKW) Page 1 of 1 Rone Engineering Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 298569 Project No.: 0612510 Date of Service: 09/13/2007 Report Date: 10/15/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Concrete Supplier: TXI Plant: 131 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 8274 Placement Date: 09/13/2007 Weather Conditions: Cloudy Time Sampled: 10:30am Temperature - Air: 860F Truck No: 1572 Air Content: 4.5% Overall Placement Location: "Red" stamped concrete median noses Batch time: 09:35am Concrete: 900F Ticket No: 528602 Unit Weight (pet): NA Measured Slump (inches) 5.0 Sample Location: Median nose at Beltline/Dividend intersection and median Stations 43+00 and 44+25 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 1 1 09/20/2007 7 6.00 28.27 110,440 3,910 Cone/Split 1 2 10/11/2007 28 6.00 28.27 145,470 5,140 Cone/Split 1 3 10/11/2007 28 6.00 28.27 141,700 5,010 Cone/Shear Average 5,080 1 4 11/08/2007 56 Started: 09:30am Finished: 11 :30am Technician: Denny Harris Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-ec Lacy Construction Attn: Mr. Kevin Briles 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Rone Engineering pad: ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KWILB) Page 1 of 1 Rone Engineering " Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 298570 Project No.: 0612510 Date of Service: 09/12/2007 Report Date: 10/15/2007 Project: Lesley Infrastructure Services: Test compressive strength test specimens prepared by others and picked up at the jobsite. PROJECT DATA Contractor: Concrete Supplier: TXI Plant: NA Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: NA Placement Date: 09/12/2007 Weather Conditions: NA Time Sampled: Temperature - Air: Truck No: NA Air Content: NA Overall Placement Location: Stamp concrete at median Measured Slump (inches) Batch time: Concrete: Ticket No: NA Unit Weight (pet): NA Sample Location: Station 47+75 through 49+00 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 1 1 09/19/2007 7 6.00 28.27 94,140 3,330 Shear 2 10/10/2007 28 6.00 28.27 134,880 4,770 Cone/Split 3 10/10/2007 28 6.00 28.27 130,340 4,610 Cone/Split Average 4,690 4 11/07/2007 56 Remarks: All information other than concrete compressive strength test data is supplied by others and is assumed to be correct. Technician: Denny Harris Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-ec Lacy Construction Attn: Mr. Kevin Briles 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Rone Engineering See RefK>rt298569 'm'ectm;,;ao ,;mep ~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 1 of 1